Z1DA--B170 Window Recaulking Services
Closed Solicitation Posted
This opportunity was awarded. See its 2 award notices in the notice history.
- Solicitation number
- 36C25627Q0022
- Agency
-
Veterans Integrated Service Network 16
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 561210 Facilities Support Services
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 seeks window recaulking services at the Eugene J. Towbin Veterans' Healthcare Center in North Little Rock, Arkansas, with proposals due October 29 at 10:00 AM CDT. This is a 100% Service-Disabled Veteran-Owned Small Business set-aside, limiting competition to certified SDVOSB entities in the SBA database at time of offer and award.
Place of performance is North Little Rock, Arkansas (2200 Fort Roots Drive, Building 170, Courtyards 1B and 1C). The scope addresses water infiltration by recaulking gaps between walls and TPO roofing beneath window base caps and flashing. Work includes inspecting TPO for damage around cant strips, installing termination bars with appropriate fasteners, sealing using TPO-compatible polyurethane or butyl-based sealants, replacing approximately 14 vertical and 1 horizontal missing or damaged face caps, relocating approximately 70 pavers (stacked no higher than six), and disposing of metal flashing. Performance occurs during normal business hours (8:00 AM–4:30 PM) within 30 days from Notice to Proceed. Logistical constraints include an approximate 50-foot curtainwall height, 4,000-pound elevator weight limit, 36- to 58-inch courtyard door widths, and quiet hours from 2–3 PM and 10 PM–5 AM; roof access requires badges while courtyard work during business hours does not. A site visit occurred October 14 with no additional visits scheduled. Compliance with VA TPO specifications (Master Spec 07 54 23) and OSHA fall protection and scaffolding standards is mandatory. Davis-Bacon prevailing wage determination AR20260032 applies; subcontracting of services is limited to 75% of contract value. Evaluation comprises four equal-weight factors: Approach & Quality Management, Professional Qualifications & Specialized Experience (demonstrated by one to five relevant projects completed within the past five years in clinical, hospital, or medical spaces of similar scope), Past Performance, and Price. Award is anticipated November 1. Proposals must be submitted via email as a single consolidated PDF (maximum 10MB), Arial 11 font, to andrew.misfeldt@va.gov with subject line "Company Name, 36C25627Q0022." Offerors must submit a signed SF 1449, wage determination amendments, and a completed schedule of offer items. Amendment 0002 clarified that SF 1449 (not SF 1442) is required.
Notice text
4 versions
Update #4 · Latest ·
SF 30 CONTINUATION SHEET
AMENDMENT 0002
Solicitation No.: 36C25627Q0022
Project: B170 Courtyard Window Re Caulk CAVHS
Purpose of Amendment
The purpose of this amendment is to provide the Government s responses to vendor questions submitted prior to the deadline. The following Questions & Answers are hereby incorporated into the solicitation. These clarifications do not change the scope of work unless explicitly stated. Only the Contracting Officer may authorize changes per FAR 52.212 4(c).
SECTION: QUESTIONS & ANSWERS
General Administrative Items
Q1. Will the Government confirm that offers should be submitted via email to andrew.misfeldt@va.gov?
A1. Yes. Submit one consolidated PDF ( 10MB), font Arial 11, in accordance with the solicitation instructions.
Q2. Are there page limitations?
A2. No page limits apply. The file-size limit of 10MB governs.
Q3. Which form must be submitted SF 1449 or SF 1442?
A3. Offerors shall submit a signed SF 1449. SF 1442 is not required.
Evaluation Factors
Q4. Please confirm the evaluation factors.
A4. Evaluation consists of:
Factor I Approach & Quality Management
Factor II Professional Qualifications & Specialized Experience
Factor III Past Performance
Factor IV Price
Factors I III are equal in importance and collectively approximately equal to Price.
Q5. Does managing one subcontractor satisfy Past Performance requirements?
A5. Yes, provided the offeror served as the prime contractor.
Site Visit, Access, & Logistics
Q6. Will there be a site visit?
A6. A site visit was held on October 14, 2026. No additional site visits will be conducted.
Q7. Please confirm logistical restrictions.
A7. Approximate curtainwall height is 50 ft (verify independently). Elevator weight limit is 4,000 lbs. Courtyard door widths are 36 58 . Quiet hours are 2 3 PM and 10 PM 5 AM. Coordinate courtyard occupation with nursing staff.
Q8. Are badges required?
A8. Not for courtyard work during business hours. Badges are required for roof access. Delays caused by incomplete contractor submissions are not excusable delays.
Scope Clarifications
Q9. Does work occur along the entire curtainwall or only at leak locations?
A9. Work shall occur along the entire curtainwall interface within Courtyards 1B and 1C to provide a continuous and complete seal.
Q10. Should the entire length be repaired for a uniform seal?
A10. Yes.
Q11. Are cover caps replaced everywhere?
A11. No. Replace only caps that are missing or cannot be reattached.
Q12. Are other courtyard walls included?
A12. No. Only the curtainwall/TPO/wall interface is included unless otherwise directed by the CO.
Q13. Will the Government provide as builts or record drawings?
A13. No. They are not available.
Q14. Will the Government provide quantities?
A14. No. Offerors must determine all quantities during the site visit. These measurements are binding for proposal purposes.
Q15. Is full perimeter window caulking included?
A15. No. Only the interfaces described in the SOW apply.
Q16. Clarify termination bar installation.
A16. Install the bar above the cant strip to secure the existing TPO using fasteners compatible with the substrate.
Q17. Clarify face cap/flashing quantities.
A17. Approximately 14 vertical caps have slid; one horizontal cap is missing; two require replacement. Remove flashing attached to the ground level base face cap. Offerors must verify all quantities.
Q18. Will the awning require removal?
A18. Not anticipated. Do not include awning removal unless CO directed.
Q19. How many pavers must be moved and how should they be stored?
A19. Approximately 70 pavers must be moved. Store in the courtyard, stacking no more than six high.
Specifications, Submittals, & Warranty
Q20. Which parts of VA 07 54 23 apply?
A20. Membrane accessory materials and compatibility requirements apply. VA 07 92 00 applies to sealant products. Where requirements conflict, the more stringent governs.
Q21. Confirm applicability of installer approvals, warranty, submittals, and pre installation meeting.
A21.
Manufacturer-approved roofing installer: Not required.
Sealant warranty: 10-year manufacturer warranty required.
Submittals: Required for sealants and termination materials showing compatibility.
Pre installation meeting: Required prior to NTP; the 30 day PoP begins after NTP issuance.
Q22. Provide TPO manufacturer or warranty info.
A22. Unknown. Contractor is not responsible for maintaining prior warranties and shall ensure compatibility of materials.
Schedule & Period of Performance
Q23. Will NTP be flexible due to temperature/weather?
A23. Yes. NTP may be adjusted as appropriate. Excusable delays are handled per FAR 52.212 4(f).
Q24. Are background checks/PIV issuance included in the PoP?
A24. Yes. Badges only required for roof access. Delays arising from incomplete contractor submissions are not excusable.
Q25. Will water spray or infiltration testing be required?
A25. No. Optional testing may be performed at the contractor s cost unless CO directed.
Q26. Anticipated award/NTP date?
A26. Award is anticipated on or around November 1, 2026 (subject to change). Schedule adjustments for weather may be considered if CO approved.
Labor Standards, Set Aside, Subcontracting, & Bonds
Q27. Which wage determination applies?
A27. Davis Bacon Wage Determination AR20260032 applies.
Q28. Will the contract be issued under DBRA only?
A28. Yes. Any SCLS references are not applicable and will be conformed administratively.
Q29. Which limitations on subcontracting apply?
A29. Construction limitations apply. For special trade construction, no more than 75% (excluding materials) may be subcontracted to non similarly situated entities. LOS certification must be submitted.
Q30. Are performance and payment bonds required?
A30. No. Bonds are not required under this solicitation unless added by future amendment.
Q31. Confirm SDVOSB status requirements.
A31. This is a total SDVOSB set aside. Offerors must be certified in the SBA database at time of offer and award.
Materials & Trades
Q32. Will brake metal caps be accepted if originals are unavailable?
A32. Yes, if they closely match existing caps and are approved before installation.
Q33. Is a glazing contractor required?
A33. No.
Quantities & Pricing Basis
Q34. Can VA provide LF quantities of termination bar or number of caps?
A34. No. Offerors must determine quantities during the site visit.
Q35. Should offerors price awning removal?
A35. No. Do not include awning removal unless CO directed.
Unforeseen/Differing Site Conditions
Q36. How will additional TPO damage discovered during work be handled?
A36. Repairs beyond the defined scope may only be performed if directed in writing by the Contracting Officer. Entitlement will be determined at that time.
Q37. Are leaks associated with recent renovations?
A37. No. Leaks have been occurring since the membrane was installed.
Attachments
Q38. Are photos/figures available?
A38. Yes. Figures 1 6 included for reference only. Offerors must verify all conditions independently.
Figure 1. Curtainwall Above GE101A and GE10B
Figure 2. Curtainwall Above GF100
Figure 3. Missing Horizontal window base cap
Figure 4. Flashing attached to horizontal window face cap
Figure 5. TPO membrane beneath windows
Figure 6. Metal Awning
Update #3 ·
Site visit is listed and attendance encouraged.
Questions deadline added.
WD changed.
Update #2 ·
This is 100$ SDVOSB set-aside.
Proposal Format and Evaluation: Proposal size will be limited as shown and font/size shall be Arial 11. Title pages, headers, and exhibits do not count towards the page limitations. If these page limits are exceeded, the pages in excess of the limit will not be read or considered. Offerors shall submit 1 (one) email. Email shall include a consolidated PDF file, no larger than 10mb, as an attachment, outlining each factor, as listed below: Email Requirements: Subject Line: Company Name, 36C25627Q0022 See Proposal Submission Requirements in the table below. VOL FACTOR PROPOSAL SUBMISSION REQUIREMENTS I Factor 1 Submission Requirement: Material to satisfy Subfactor 1a criteria outlined below. Material to satisfy Subfactor 1b criteria outlined below. Factor 2 Submission Requirement: Offeror Shall provide a minimum of one (1) and a maximum of five (5) projects completed within the last five (5) years similar in size, complexity, and scope to this project. Factor 3 Price Submission Requirement: Signed 1442 and Amendments Completed Schedule of Offer Items Definitions: Recent - with in past five (5) years from the date of solicitation issuance Relevant - for purposes of this evaluation, a relevant project is defined as completed in a clinical, hospital or other medical related use space similar in size and scope to this project. Evaluation Factors Factor I (Approach Quality Management Technical Factor), Factor II (Professional Qualifications & Specialized Experience Technical Factor), and Factor III (Past Performance) are equal in importance. Factors I, II, and III, when combined, are approximately equal in importance to Factor IV (Price). FACTOR 1 APPROACH QUALITY MANAGEMENT TECHNICAL FACTOR SUBFACTORS: Subfactor 1a Management Approach Narrative/Schedule Subfactor 1b Quality Management The following subfactors are in descending order of importance: Subfactor 1a Management Approach Narrative/Schedule: Instructions: Offeror shall demonstrate/explain how this project will be accomplished, based on the offeror s best interpretation of the solicitation documents. Offeror shall provide techniques for maintaining on-time schedule performance and provide a detailed explanation as to how the project will be implemented and managed to ensure compliance with all OSHA Construction Standards, Fire and Life Safety Issues, and Security Measures. Offeror shall provide a schedule with critical path based off a fictional NTP date of 1/1/2027. Subfactor 1b Quality Management: Instructions: Offeror shall specify the roles/positions responsible for quality management & explain the authority those individual(s) have to ensure quality work is provided. Offeror shall provide a detailed explanation of proposed quality control techniques for compliance with the solicitation requirements. Offeror shall provide a narrative on how quality issues are managed and resolved for construction projects. Evaluation Methodology: The VA will evaluate Management Approach, and Quality Management to determine if the offeror understands the complexity and risk mitigation of performing all the required tasks included in this construction project. This technical factor will be evaluated for the offeror s interpretation of the solicitation technical areas outlined in the drawings, specifications, SOW, and evaluation factor criteria. The offeror s narratives should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed. FACTOR 2 PAST PERFORMANCE Projects must demonstrate an offeror s experience as a prime contractor managing multiple subcontractors. Project(s) shall have a minimum construction value of between $25,000 and $100,000 and be 100% completed/or ongoing (>50% complete). The offeror s submission should include at a minimum: Project Title Project Location (Physical Address) Contract Type (Example: Design-Build, Design-Bid-Build, Service, Construction) Project Owner s Name & Current Contact Information Brief Description of the Scope of Work (highlight recent/relevant factors) Identify Project Prime Contractor and Major Subcontractors Project Start & Completion Date Project Original Contract Award Amount & Final Award Amount For multiple award and indefinite delivery/indefinite quantity type contracts, the whole contract shall not be submitted as a project; rather offerors shall submit the work performed under a single task order as a project to demonstrate recent/relevancy. If the offeror is a Joint Venture (JV), relevant past performance should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared past performance, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit past performance for all Joint Venture partners may be rated lower. Evaluation Methodology:Â Past performance will be evaluated based on the projects provided by the offeror, and performance information from government databases. Focus will be on recent and relevant construction contracts that are comparable in size, scope, and complexity. The Intent of this evaluation is to evaluate the demonstrated ability to successfully complete comparable requirements, ensuring they have the experience and capability to deliver quality results on time, within budget, and incompliance with project specifications. The following Performance Relevancy definitions apply: Rating Definition Very Relevant Present/Past Performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. Relevant Present/Past Performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. Somewhat Relevant Present/Past Performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. Not Relevant Present/Past Performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. The following Performance Confidence Rating adjectives and related definitions will be used in the evaluation of Past/Present Performance: Performance Confidence Assessments Rating Description Substantial Confidence Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort. Satisfactory Confidence Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort. Limited Confidence Based on the offeror s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort. No Confidence Based on the offeror s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort. Unknown Confidence (Neutral) No recent/relevant performance record is available, or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. Based on the evaluation of offers, the Government will assign a performance confidence rating for each proposal at the factor level. The evaluation will consider the sub-factors as described herein. The resulting evaluation will assign one of the confidence ratings as defined in the table above. The SSEB must establish overall team ratings by consensus and not by vote. If a consensus cannot be reached, the SSEB will provide the SSA with written majority and minority opinions. The SSEB will ensure that none of the SSEB members have misinterpreted or misunderstood any aspects of the proposal prior to issuing the majority and minority opinions. The SSEB must establish overall team ratings by consensus and not by vote. If a consensus cannot be reached, the SSEB will provide the SSA with written majority and minority opinions. The SSEB will ensure that none of the SSEB members have misinterpreted or misunderstood any aspects of the proposal prior to issuing the majority and minority opinions. FACTOR 3 Price Proposal Requirements: Evaluation Methodology: The purpose of the price evaluation is to provide an assessment of the completeness and reasonableness of the proposed price in relation to the solicitation requirements. Price proposals will be evaluated to determine if the prices and support costs areas are: Complete The proposal contains costs to perform all tasks required by the Scope of Work (SOW), specifications, and design drawings if provided. Reasonable The price is determined fair and reasonable using cost or price analysis techniques described in FAR 15.404. In accordance with FAR 15.101-1(b)(2), the solicitation shall state that all evaluation factors other than price, when combined, are approximately equal in importance to price. Prices that are too high, too low, or otherwise found to be unreasonable in comparison to the Independent Government Cost Estimate (IGCE) and to historical prices may be indicative of an inherent lack of understanding of the solicitation requirements and may result in proposal not being included into the competitive range if one is established. Each proposal will be evaluated to determine whether or not it complies with the stated criteria. Those proposals evaluated as not satisfying all the price/cost criteria, for example, may be eliminated from consideration for award unless the SSA determines: A minor clerical error has occurred, then the offeror may be given an opportunity to correct the minor error within the constraints of the "clarifications" process. A competitive range will be established if discussions are necessary as determined by the SSA. Should the SSA determine that discussions are necessary, they will be held with only those offerors determined to be in the competitive range. Any proposal that does not have a reasonable chance of receiving award may be accordingly eliminated from competition and further evaluation. After the non-price factors have been evaluated and rankings have been established, price will be compared against these rankings to determine the combination most advantageous to the Government. The evaluation of price will be based on each offeror s price proposed. Responsibility determination will be made IAW FAR 9.1, Responsible Prospective Contractors prior to award of contract. V. Basis for Award This is a competitive source selection process which will result in a single contract award. The government anticipates discussions to be held. If a competitive range is established, proposals that do not have a reasonable chance of receiving award may be accordingly eliminated from competition and further evaluation. The Government reserves the right to reject any or all offers if such action is in the Government's best interest.
Update #1 ·
Proposal Format and Evaluation:
Proposal size will be limited as shown and font/size shall be Arial 11. Title pages, headers, and exhibits do not count towards the page limitations. If these page limits are exceeded, the pages in excess of the limit will not be read or considered.
Offerors shall submit 1 (one) email. Email shall include a consolidated PDF file, no larger than 10mb, as an attachment, outlining each factor, as listed below:
Email Requirements:
Subject Line: Company Name, 36C25627Q0022
See Proposal Submission Requirements in the table below.
VOL
FACTOR
PROPOSAL SUBMISSION REQUIREMENTS
I
Factor 1
Submission Requirement:
Material to satisfy Subfactor 1a criteria outlined below.
Material to satisfy Subfactor 1b criteria outlined below.
Factor 2
Submission Requirement:
Offeror Shall provide a minimum of one (1) and a maximum of five (5) projects completed within the last five (5) years similar in size, complexity, and scope to this project.
Factor 3
Price
Submission Requirement:
Signed 1442 and Amendments
Completed Schedule of Offer Items
Definitions:
Recent - with in past five (5) years from the date of solicitation issuance
Relevant - for purposes of this evaluation, a relevant project is defined as completed in a clinical, hospital or other medical related use space similar in size and scope to this project.
Evaluation Factors
Factor I (Approach Quality Management Technical Factor), Factor II (Professional Qualifications & Specialized Experience Technical Factor), and Factor III (Past Performance) are equal in importance. Factors I, II, and III, when combined, are approximately equal in importance to Factor IV (Price).
FACTOR 1 APPROACH QUALITY MANAGEMENT TECHNICAL FACTOR
SUBFACTORS:
Subfactor 1a Management Approach Narrative/Schedule
Subfactor 1b Quality Management
The following subfactors are in descending order of importance:
Subfactor 1a Management Approach Narrative/Schedule:
Instructions:
Offeror shall demonstrate/explain how this project will be accomplished, based on the offeror s best interpretation of the solicitation documents.
Offeror shall provide techniques for maintaining on-time schedule performance and provide a detailed explanation as to how the project will be implemented and managed to ensure compliance with all OSHA Construction Standards, Fire and Life Safety Issues, and Security Measures.
Offeror shall provide a schedule with critical path based off a fictional NTP date of 1/1/2027.
Subfactor 1b Quality Management:
Instructions:
Offeror shall specify the roles/positions responsible for quality management & explain the authority those individual(s) have to ensure quality work is provided.
Offeror shall provide a detailed explanation of proposed quality control techniques for compliance with the solicitation requirements.
Offeror shall provide a narrative on how quality issues are managed and resolved for construction projects.
Evaluation Methodology: The VA will evaluate Management Approach, and Quality Management to determine if the offeror understands the complexity and risk mitigation of performing all the required tasks included in this construction project. This technical factor will be evaluated for the offeror s interpretation of the solicitation technical areas outlined in the drawings, specifications, SOW, and evaluation factor criteria. The offeror s narratives should provide enough detail to demonstrate that the scope and complexity of the project requirements are understood and will be successfully completed.
FACTOR 2 PAST PERFORMANCE
Projects must demonstrate an offeror s experience as a prime contractor managing multiple subcontractors.
Project(s) shall have a minimum construction value of between $25,000 and $100,000 and be 100% completed/or ongoing (>50% complete).
The offeror s submission should include at a minimum:
Project Title
Project Location (Physical Address)
Contract Type (Example: Design-Build, Design-Bid-Build, Service, Construction)
Project Owner s Name & Current Contact Information
Brief Description of the Scope of Work (highlight recent/relevant factors)
Identify Project Prime Contractor and Major Subcontractors
Project Start & Completion Date
Project Original Contract Award Amount & Final Award Amount
For multiple award and indefinite delivery/indefinite quantity type contracts, the whole contract shall not be submitted as a project; rather offerors shall submit the work performed under a single task order as a project to demonstrate recent/relevancy.
If the offeror is a Joint Venture (JV), relevant past performance should be submitted for projects completed by the Joint Venture entity. If the Joint Venture does not have shared past performance, projects shall be submitted for each Joint Venture partner. Offerors who fail to submit past performance for all Joint Venture partners may be rated lower.
Evaluation Methodology:Â Past performance will be evaluated based on the projects provided by the offeror, and performance information from government databases. Focus will be on recent and relevant construction contracts that are comparable in size, scope, and complexity. The Intent of this evaluation is to evaluate the demonstrated ability to successfully complete comparable requirements, ensuring they have the experience and capability to deliver quality results on time, within budget, and incompliance with project specifications.
The following Performance Relevancy definitions apply:
Rating
Definition
Very Relevant
Present/Past Performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.
Relevant
Present/Past Performance effort involved similar scope and magnitude of effort
and complexities this solicitation requires.
Somewhat Relevant
Present/Past Performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.
Not Relevant
Present/Past Performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.
The following Performance Confidence Rating adjectives and related definitions will be used in the evaluation of Past/Present Performance:
Performance Confidence Assessments
Rating
Description
Substantial Confidence
Based on the offeror s recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the offeror s recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.
Limited Confidence
Based on the offeror s recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.
No Confidence
Based on the offeror s recent/relevant performance record, the Government has no expectation that the offeror will successfully perform the required effort.
Unknown Confidence (Neutral)
No recent/relevant performance record is available, or the offeror s performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned.
Based on the evaluation of offers, the Government will assign a performance confidence rating for each proposal at the factor level. The evaluation will consider the sub-factors as described herein. The resulting evaluation will assign one of the confidence ratings as defined in the table above. The SSEB must establish overall team ratings by consensus and not by vote. If a consensus cannot be reached, the SSEB will provide the SSA with written majority and minority opinions. The SSEB will ensure that none of the SSEB members have misinterpreted or misunderstood any aspects of the proposal prior to issuing the majority and minority opinions.
The SSEB must establish overall team ratings by consensus and not by vote. If a consensus
cannot be reached, the SSEB will provide the SSA with written majority and minority opinions.
The SSEB will ensure that none of the SSEB members have misinterpreted or misunderstood
any aspects of the proposal prior to issuing the majority and minority opinions.
FACTOR 3 Price Proposal Requirements:
Evaluation Methodology: The purpose of the price evaluation is to provide an assessment of the completeness and reasonableness of the proposed price in relation to the solicitation requirements. Price proposals will be evaluated to determine if the prices and support costs areas are:
Complete The proposal contains costs to perform all tasks required by the Scope of Work (SOW), specifications, and design drawings if provided.
Reasonable The price is determined fair and reasonable using cost or price analysis techniques described in FAR 15.404.
In accordance with FAR 15.101-1(b)(2), the solicitation shall state that all evaluation factors other than price, when combined, are approximately equal in importance to price.
Prices that are too high, too low, or otherwise found to be unreasonable in comparison to the Independent Government Cost Estimate (IGCE) and to historical prices may be indicative of an inherent lack of understanding of the solicitation requirements and may result in proposal not being included into the competitive range if one is established. Each proposal will be evaluated to determine whether or not it complies with the stated criteria. Those proposals evaluated as not satisfying all the price/cost criteria, for example, may be eliminated from consideration for award unless the SSA determines:
A minor clerical error has occurred, then the offeror may be given an opportunity to correct the minor error within the constraints of the "clarifications" process.
A competitive range will be established if discussions are necessary as determined by the SSA. Should the SSA determine that discussions are necessary, they will be held with only those offerors determined to be in the competitive range. Any proposal that does not have a reasonable chance of receiving award may be accordingly eliminated from competition and further evaluation.
After the non-price factors have been evaluated and rankings have been established, price will be compared against these rankings to determine the combination most advantageous to the Government. The evaluation of price will be based on each offeror s price proposed.
Responsibility determination will be made IAW FAR 9.1, Responsible Prospective Contractors prior to award of contract.
V. Basis for Award
This is a competitive source selection process which will result in a single contract award. The government anticipates discussions to be held. If a competitive range is established, proposals that do not have a reasonable chance of receiving award may be accordingly eliminated from competition and further evaluation. The Government reserves the right to reject any or all offers if such action is in the Government's best interest.
Files
| File | Type | Posted |
|---|---|---|
| 36C25627Q0022 0002.docx | DOCX document | |
| AR20260032.txt | TXT text file | |
| 36C25627Q0022 0001.docx | DOCX document | |
| SOW - B170 Courtyard Window Re-caulk final.docx | DOCX document | |
| WD 2015-5117.pdf | ||
| TPO Roofing 07 54 23.docx | DOCX document | |
| 36C25627Q0022.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Z1DA--B170 Window Recaulking Services | Award Notice | |
| Z1DA--B170 Window Recaulking Services | Award Notice | |
| This notice | Solicitation | |
| Z1DA--B170 Window Recaulking Services | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| N099--JLM Roll Up Door Replacement | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| Y1DZ--598-22-115 Site Utility Infrastructure-NLR | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| 36C25627R0012_solicitation_notice_replace perimeter security fence | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| J012--Kitchen Exhaust Cleaning, Kitchen Fire Suppression System Service, and Portable Fire Extinguisher Service | Veterans Integrated Service Network 16 | No set-aside | |
| S201--VANIHCS Window Cleaning - Engineering Service Amendment to provide answers to contractor questions | Veterans Integrated Service Network 10 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity