Z1DA--542-21-201 | Remove Underground Fuel Storage Tank E-85

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
36C24424B0004
Agency
Veterans Integrated Service Network 4 Veterans Health Administration, Department of Veterans Affairs
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
236220 Commercial and Institutional Building Construction
PSC
Z1DA Maintenance Of Hospitals And Infirmaries
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 4 is seeking construction services to remove an underground fuel storage tank (E-85) and replace fuel dispensers at the Coatesville VA Medical Center. The project involves installing a new modular IV Cleanroom in Building 2, including a new air handling unit, plumbing, fire protection, lighting, electrical, controls, and demolition work. Offerors must provide brand name or equal products compatible with the existing facility systems. The contract will be awarded as a firm-fixed-price contract to the responsive, responsible bidder with the lowest price. Offers are due by June 18, 2024 at 3:00 PM EDT.

This solicitation is not set aside for any specific business size or type. The North American Industry Classification System (NAICS) code is 236220 with a $45 million small business size standard. The magnitude of construction is between $250,000 and $500,000, and the contractor will have 300 days after the notice to proceed to complete the project. The work will be performed at the VA Medical Center in Coatesville, Pennsylvania.

Notice text

6 versions

Update #6 · Latest ·

Request For Information Response

Construction Project No. 542-21-201

Remove Underground Fuel Storage Tank E-85

Coatesville VA Medical Center

COR: Daniel.Hiltebeitel@va.gov

Page 2 of 5

The purpose of this document is to add to a list of RFIs and corresponding responses per VA guidance for bidding contractors consideration. The information may be used in consideration of construction contract bid development for Project # 542-21-201, Remove Underground Fuel Storage Tank E-85 at the Coatesville VAMC.

Solicitation No.: 36C24424B0004

Date: 06 June 2024

Diesel Fuel System:

QUESTION:

Please confirm the drawings showing the electrical panel and Veeder Root on Details C3 and C6 on Sheet M-101 of the drawings have the panels reversed. It currently shows electrical going to the Veeder Root and the communications going to the electrical panel.

RESPONSE:

The electrical and Veeder Root panels are correctly labeled in Details C3 and C6 on Sheet M-101 of the drawings. The electrical and communication lines are stacked vertically (wall mounted) inside the building, they are depicted spaced for ease of viewing on the drawing (mis-labeled inside the building only).

QUESTION:

The SOW indicates installation of an Atlas 9153K dispenser and Detail C9 on Sheet M-101 indicates installation of an Atlas 9853K. Please note that Gasboy has phased out these models and the equivalent models are the Atlas X 9153G and 9853G. Please clarify which dispenser you are requiring for the project.

RESPONSE:

The AtlasX 9853G shall be provided as the updated model to the 9853K as called out on the design plans and specifications as basis of design for this project.

QUESTION:

The specified UDC for the dispenser (identified as a OPW DS-1120 on Detail C9 on Sheet M-101) does not have the same footprint as the new Atlas X dispensers, which have a larger footprint. Would an equivalent Bravo UDC be acceptable? Should the UDC be plastic or fiberglass (fiberglass recommended)?

RESPONSE:

An equivalent Bravo UDC, matching the updated Atlas dispenser footprint would be acceptable. Fiberglass would be an acceptable substitution.

QUESTION:

Can the Islander Prime be equipped with wireless technology rather than hard wired (as the Islander for the gas tank is specified)?

If the Islander must be hard wired, would it require CAT 6a (per Sheet Note 3 on Drawing E-101) or CAT 6e per the SOW?

If the Islander must be hard wired, where is the Building 12 Telecom Room Cabinet located? It is not shown on the drawings.

RESPONSE:

Yes. See response to Question number 10.

CAT 6A.

The Building 12 IT Closet is currently under construction as part of the EHRM Project. It will be located in Building 12.

QUESTION:

Please confirm we are to provide a new submersible pump per Detail C6 on Sheet M-101. If so, should this be fixed or variable speed?

RESPONSE:

Confirmed, provide a new submersible pump per Detail C6 on Sheet M-101. Fixed speed based on manufacturer recommendation per AtlasX 9853G dispensers.

QUESTION:

Please confirm we are to provide a laptop computer and router for Building 14 per Sheet Note 6 on Drawing E-101. If so, are there any specifics to the requirements of this equipment?

RESPONSE:

Confirmed, provide a new laptop computer and router compatible an in accordance with manufacturer requirements to function with installed system. Laptop shall be capable of running the software to track the fuel usage.

QUESTION:

We understand that the intent is to reuse the existing 4 containment piping between the UST STP sump and UDC. If new 2 product line cannot be installed in the 4 containment piping and the containment piping required replacement between the sump and UDC, would removal of the concrete above the STP and replacement of the containment piping be considered a contract modification?

RESPONSE:

7) Should the piping conduit be unsuitable for reuse, the contractor would need to submit an RFI with justification for any possible contract change.

QUESTION:

8) Because the product line to the dispenser and the UDC are topographically lower than the STP sump and leaked fuel would not drain to the STP sump, an anti-siphon valve should be installed in the STP sump. Please confirm that bidders should include an anti-siphon valve.

RESPONSE:

8) A replacement sensor must be installed in the UDC to match the existing condition. A Leak in the product line would be detected by the UDC sensor. An anti-siphon valve is not required.

For both Gasoline and Diesel Fuel Systems:

QUESTION:

9) For the Islanders, should this be equipped with an RFI key fob/card reader or would it be manually used with keypad?

RESPONSE:

9) The unit shall be equipped with a Mifare Tag Reader and Magnetic card reader per spec section 23 10 00 2.5 F - 2 d.

QUESTION:

Is the intent for the Islanders to simply turn on/off the dispensers or is the intent to acquire/record data?

If data acquisition/recording is not required, would a simpler FMU (e.g., Gasboy Site Prime) be acceptable?

If data acquisition/recording is desired, are we to include the Gasboy EKOS system (one-time setup fee then monthly charge of $179)? Would the VA pay the monthly charges? If not, how long should the contractor pay for the EKOS service?

RESPONSE:

Yes, intent for the Islanders to simply turn on/off the dispensers.

A simpler FMU e.g. a Gasboy Site Prime is acceptable.

QUESTION:

We understand that the existing Veeder Root systems (inclusive of the console, wiring, sensors, and probes) are to be removed and existing communication conduits are to be reused for the new wiring. If the new wiring cannot be pulled through the existing conduits and these needed to be replaced, would these be considered a contract modification? Note that for the diesel UST this would require all or partial removal/replacement of the concrete pad above tank to access the interstitial monitor riser pipe handhole and the STP sump for the ATG probe and the liquid sensor.

RESPONSE:

Should the conduit be unsuitable for reuse, the contractor would need to submit an RFI with justification for any possible contract change.

QUESTION:

Drawings E-101 and E-102 indicate we are to install new electrical wire for the pumps within existing conduit. If we are unable to reuse existing conduit to pull the new wires and the conduit needed replacement, would this be considered a contract modification? Note the panel for the gas tank is remote from the tank location.

RESPONSE:

12) Should the conduit be unsuitable for reuse, the contractor would need to submit an RFI with justification for any possible contract change.

QUESTION:

The Gasboy systems are currently on a 8 to 10-week lead time (which could increase between now and NTP. Can the POP be increased to 180 days to account for submittal approval and lead time for the specified equipment?

RESPONSE:

The POP (Period of Performance) is a term relegated to Service contracts only, we will not use that term with a performance contract. The Schedule can be modified per formal submission of contractor s logistical constraint extension request to the CO.

QUESTION:

The E-stops for both tanks are push-pull type, which are out of code (push only allowed). Should the contractor include replacement of these?

RESPONSE:

14) Yes, the E-stops being out of code, should be replaced to meet current code per SOW.

Gasoline System:

QUESTION:

15) Whenever pumps are replaced on tanks, PA Labor and Industry requires and inspection of the systems, which requires proper tank labelling and E-stop signage be clear. The labelling on the tank and E-stop sign are faded. We also recommend pressure washing and repainting the tank. Should the contractor include these in their bid.

RESPONSE:

15) The final complete system must pass the PA Labor and Industry required inspection of the system.

QUESTION:

16) The face on the clock gauge is broken and its function is unknown. Should replacement of the product level gauge be included by bidders?

RESPONSE:

16) See Response #15. The final complete system must pass the PA Labor and Industry required inspection of the system. The damaged clock gauge shall be replaced as a part of this project.

QUESTION:

17) We recommend the gasoline product piping be new for the installation of a new pumping unit. The first valve after the suction line exits the tank a 90 would be needed then a SS ball valve prior to any other valves. Currently the gate valve third after the 90 and in front should be a fire valve and anti-siphon as existing. I would also replace the solenoid as part of age and again good practice.

RESPONSE:

17) Good practice is required per Spec and FAR. Piping and valves are called to be replaced on contract drawing M-102.

QUESTION:

18) Is a pulser required for the Atlas 9823K dispenser (such that the Islander would be able to track fuel dispensed for data acquisition/recording purposes)?

RESPONSE:

18) Yes, a pulser is required, see Response number 10.

Update #5 ·

PUBLIC BID OPENING - 36C24424B0004 542-21-201 Remove Underground Fuel Storage Tank E-85

E-mail Bids and bid bonds to Contracting Officer, Everett Shaver at Everett.shaver@va.gov

Bid to be opened via MS Teams. Please forward/save invite link or dial in as desired.

Please forward invite or dial in as desired

________________________________________________________________________________

Microsoft Teams Need help?

Join the meeting now

Meeting ID: 292 794 328 758

Passcode: FqvsUd

Dial-in by phone

+1 872-701-0185,,257651824# United States, Chicago

Find a local number

Phone conference ID: 257 651 824#

For organizers: Meeting options | Reset dial-in PIN

________________________________________________________________________________

ITEM NUMBER

DESCRIPTION OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

0001

Construction Services

542-21-201 Remove Underground Fuel Storage Tank E-85

1.00

JB

__________________

__________________

Unit Price of Soil

1.0 Cubic Yard __________________

Remediation

Update #4 ·

PUBLIC BID OPENING - 36C24424B0004 542-21-201 Remove Underground Fuel Storage Tank E-85

E-mail Bids and bid bonds to Contracting Officer, Everett Shaver at Everett.shaver@va.gov

Bid to be opened via MS Teams. Please forward/save invite link or dial in as desired.

________________________________________________________________________________

Microsoft Teams Need help?

Join the meeting now

Meeting ID: 292 794 328 758

Passcode: FqvsUd

Dial-in by phone

+1 872-701-0185,,257651824# United States, Chicago

Find a local number

Phone conference ID: 257 651 824#

For organizers: Meeting options | Reset dial-in PIN

Site Visit RFIs and Answers

The purpose of this document is to establish a list of RFIs and corresponding responses per VA guidance for bidding contractors consideration. The information may be used in consideration of construction contract bid development for Project # 542-21-201, Remove Underground Fuel Storage Tank E-85 at the Coatesville VAMC.

QUESTION:

Is shoring going to be required for UST E85 removal?

RESPONSE:

Refer to Drawing M-101 and Specifications Section 31 20 11. Ultimately, Tank Removal Note 9 on M-101 applies.

QUESTION:

Is any soil sampling beyond PADEP requirements going to be called for?

RESPONSE:

No.

QUESTION:

What are unit pricing requirements for potential contaminated soil removal?

RESPONSE:

Sampling, remediation, and disposal unit price of soil remediation per cubic yard. See revised bid sheet.

QUESTION:

Is the small canopy over the dispenser on E85 system to be removed?

RESPONSE:

No.

QUESTION:

Is all aboveground conduit for the E85 system back to Veeder-Root to be removed?

RESPONSE:

Yes.

QUESTION:

Are new Veeder-Root overfill alarms to be provided for upgrades to gasoline and diesel tanks?

RESPONSE:

Existing alarms should be reused.

QUESTION:

What is the probe depth/ height on gasoline tank?

RESPONSE:

7) Gasoline AST is a 1,000 gallon Fire Hopper tank manufactured by Highland Tank.

QUESTION:

8) Is a Fuel Monitoring System going to be required for gasoline/ diesel tanks or is a dispenser/ pump with card reader system sufficient?

RESPONSE:

8) Veeder-Root TLS 450 ATG is shown on the electrical drawings. Existing sensors and probes shall be reconnected. A new Gasboy islander FMU is shown on drawings M-101 and M-102.

QUESTION:

9) For gasoline tank system, is a suction pump/dispenser unit mounted to an aboveground spill containment bucket allowed rather than tank top pump?

RESPONSE:

9) System is shown with a remote pump on drawing M-102. The design intent is for a replace in kind dispenser unit.

On Page 82 of the Solicitation document, there are 13 documents listed. We have received 12 of the 13 documents. 12/13 documents.

The following document is missing: S02 Remove Undrgrd Fuel Tank E-85 Dwgs-sig.

See attached.

ITEM NUMBER

DESCRIPTION OF SUPPLIES/SERVICES

QUANTITY

UNIT

UNIT PRICE

AMOUNT

0001

Construction Services -Replace IV Cleanroom

1.00

JB

__________________

__________________

Unit Price of Soil

1.0 Cubic Yard __________________

Remediation

Update #3 ·

See attached Sign-In Sheet

Update #2 ·

See attached 36C24424B0004 Solicitation

Update #1 ·

?.## STATEMENT OF WORK

Statement of Work

Project # 542-22-133

IV Cleanroom Replacement in Building 2

This project constructs a new IV Cleanroom in Building 2, on the second floor to replace the existing cleanroom in accordance with the drawings and specifications. The new IV Cleanroom envelope will be of modular construction based upon Portafab company as name brand or equal to Series 300.  The construction includes the installation of a new air handling unit in the attic mechanical room together with the provision of a new louver in the attic. The project also includes all associated plumbing, fire protection, lighting and electrical, all controls, slab penetrations and modifications, and demolition. The work includes all labor, equipment, and materials. Contractor shall be required to provide the Brand Name or Equal products which must be compatible with existing systems throughout the Coatesville VAMC. All name brand products mentioned in this SOW are used as a basis of design, for fair bidding. They may be replaced with other products upon submittal approval.

The following list of brand name or equal to items would be used as a basis for design in the construction of this project:

Portafab Series 300

Krueger 5100HF

CS-1 and CS-1a Bell & Gossett Model e614

CS-2 Bell & Gossett Model e613.

Spirax Sarco Model CSG-HSEF020-PNP3C1-1F2F-AET-3SPLN17-AESL, Capacity 50 lbs./hr., 15 psig

Greenheck Model BSQ-90

Type A: CLEAR -VU LIGHTING #CLF14-S1-N-UV-HAL-LFSS304-CIA-IBBMS

Type B: COLUMBIA LIGHTING # MDS-4-40-VW-F-W-E-U

RING SS201 - CLEAN/PROCEDURE ROOM STATION

RING AA918 DESK/WALL MASTER STATION

RING RM5000EX INTERCOM CONTROL SYSTEM

All work shall be performed in compliance with all Federal, State and Local laws and regulations. In addition, work will meet equipment s manufacturer specifications and generally accepted industry standards of good workmanship. All waste materials shall be disposed of by the contractor in compliance with Federal State and Local laws and regulations. Contractors will supply receipts for quantities of material removed for recycling accountability.

No work may proceed by the contractor until all material cut sheets are submitted to the COR for approval.

A site visit will be conducted with perspective offerors to visually assess existing conditions.

Contractor will have 300 days after receipt of NTP to complete the project.

Attachments

Show all 21

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Z1DA--542-21-201 | Remove Underground Fuel Storage Tank E-85 Award Award Notice
Z1DA--542-21-201 | Remove Underground Fuel Storage Tank E-85 This notice · Latest solicitation Solicitation
Z1DA--542-21-201 | Remove Underground Fuel Storage Tank E-85 Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity