This document is a NEPA Evaluation Form for a project to remove an E-85 fuel underground storage tank (UST) and replace diesel and gasoline dispensers and monitoring systems at the Coatesville VA Medical Center.
The project description states that the work involves removing the E-85 fuel UST, the connected dispensing unit, and associated appurtenances, as well as replacing the existing diesel and gasoline dispensers and monitoring systems with new systems. The project is categorized as a Categorical Exclusion under NEPA, with no extraordinary circumstances identified. The project is scheduled to be completed by October 16, 2023. The NEPA assessment was approved by the VA's GEMS on October 23, 2023.
The related federal contract opportunity is a solicitation (36C24424B0004) for the removal of the underground fuel storage tank, with a target completion date of October 16, 2023. The contract will be awarded by the Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 4.
View the file
Other files for this federal contract opportunity
Show all 20
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT A
COATESVILLE NEPA ASSESSMENT FORM
Project: Location:
Project #:
Type of Project: Project Description:
Operation and Maintenance Activities
Repairs/Renovation Project
New Construction Project
Lease
Other
Level of NEPA Analysis: Other Environmental Permits/Analysis Needed:
Categorical Exclusion
Environmental Assessment Needed
Environmental Impact Statement Needed
PROJECT IMPACTS
Would the proposed activity involve or generate any of the following?
SOURCE YES NO SOURCE YES NO SOURCE YES NO
Air Emissions Liquid RCRA or including GHGs Effluent CERCLA Sites
Asbestos Petroleum Wetlands
Storage
Excess Noise Solid Waste Permit
Modification
Utility Hazardous Chemical
Modification Waste Use/Storage
Soil Disturbance Biological Aesthetics
Resources
Water Treatment Radioactive Water/Well Use
Waste
Water Flow Mixed Waste
Modification
DETERMINATION
I find the proposed project qualifies as a CATEGORICAL EXCLUSION with no extraordinary circumstances. Specify which CATEX: _______________________
I find the proposed project MAY have a significant effect on the environment; therefore, an
ENVIRONMENTAL ASSESSMENT will be prepared
ENVIRONMENTAL IMPACT STATEMENT
Recommended by:__________________________ Project Mgr Date: ________________
Approved by: ______________________________ GEMS Date: ________________
Date:
ATTACHMENT B
ATTACHMENT C
1. Repair, replacement, and new installation of primary or secondary electrical distribution systems;
2. Repair, replacement, and new installation of components such as windows, doors, roofs; and site elements such as sidewalks, patios, fences, retaining walls, curbs, water distribution lines, and sewer lines which involve work totally within VA property boundaries;
3. Routine VA grounds and facility maintenance activities;
4. Procurement activities for goods and services for routing facility operations maintenance and support;
5. Interior construction or renovation;
6. New construction of 75,000 gross square feet or less;
7. Development of 20 acres of land or less within an existing cemetery, or development on acquired land of five acres or less;
8. Actions which involve support or ancillary appurtenances for normal operation;
9. Leases, licenses, permits, and easements;
10. Reduction in force resulting from workload adjustments, reduced personnel or funding levels, skill imbalances or other similar causes;
11. VA policies, actions and studies which do not significantly affect the quality of the human environment;
12. Preparation of regulations, directives, manuals or other guidance that implement, but do not substantially change, the regulations, directives, manuals, or other guidance of higher organizational levels or another
Federal agency; and
13. Actions, activities, or programs that do not require expenditure of Federal funds.
VA Categroical Exclusions List
1. Greater scope or size than normally experienced for a particular categorical exclusion
2. Actions in highly populated or congested areas
3. Potential for degradation, although slight, or existing poor environmental conditions
4. Use of unproven technology
5. Potential presence of an endangered species, archaeological remains, or other protected resources
6. Potential presence of hazardous or toxic substances
Extraordinary Circumstances
| CheckBox1: Off |
| CheckBox2: Yes |
| CheckBox3: Off |
| CheckBox4: Off |
| CheckBox5: Off |
| CheckBox6: Yes |
| CheckBox7: Off |
| CheckBox8: Off |
| CheckBox9: Off |
| CheckBox10: Off |
| CheckBox11: Off |
| CheckBox12: Yes |
| CheckBox13: Off |
| CheckBox14: Off |
| Text18: Coatesville VAMC |
| Text19: 542-21-201 |
| Text20: 10/16/2023 |
| Text21: This project removes the E-85 fuel UST, the |
connected dispensing unit, as well as all associated appurtenances and replaces the existing Diesel and Gasoline dispensers and monitoring systems with new systems.
| Text22: 3 and 6 | |
| 2023-10-17T14:06:11-0400 | |
| DANIEL HILTEBEITEL |
| 2023-10-23T10:35:12-0400 | |
| RACHEL B RAMSEY 1678958 |
| Text32: 10/16/2023 |
| Text33: 23OCT23 |
| CheckBox35: Yes |
| CheckBox36: Off |
| CheckBox37: Off |
| CheckBox38: Yes |
| CheckBox39: Yes |
| CheckBox40: Off |
| CheckBox41: Off |
| CheckBox42: Yes |
| CheckBox43: Yes |
| CheckBox44: Off |
| CheckBox45: Off |
| CheckBox46: Yes |
| CheckBox47: Off |
| CheckBox48: Yes |
| CheckBox49: Off |
| CheckBox50: Yes |
| CheckBox51: Yes |
| CheckBox52: Off |
| Text53: Remove Underground Fuel Storage Tank |
| CheckBox54: Off |
| CheckBox55: Yes |
| CheckBox56: Yes |
| CheckBox57: Off |
| CheckBox58: Off |
| CheckBox59: Yes |
| CheckBox60: Off |
| CheckBox61: Yes |
| CheckBox62: Off |
| CheckBox63: Yes |
| Text64: |
| Text65: SHPO Contacted |
| CheckBox66: Off |
| CheckBox67: Yes |
| CheckBox68: Off |
| CheckBox69: Yes |
| CheckBox70: Yes |
| CheckBox71: Off |
| CheckBox72: Off |
| CheckBox73: Yes |
| CheckBox74: Off |
| CheckBox75: Yes |
| CheckBox76: Off |
| CheckBox77: Yes |
| CheckBox78: Off |
| CheckBox79: Yes |
| Text1: |
| Text2: |
| Text3: |
File details come from the government source that posted it. Updated .