Z1DA--528A5-17-531 upgrade building 8 basement heating system canandaigua, NY VAMC
Closed Solicitation Posted
- Solicitation number
- 36C24222B0074
- Agency
-
Veterans Integrated Service Network 2
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 238220 Plumbing, Heating, and Air-Conditioning Contractors
Notice details come from SAM.gov. Updated .
About this opportunity
This solicitation seeks proposals to upgrade the heating system in the basement of Building 8 at the Canandaigua VA Medical Center in Canandaigua, New York. The scope of work includes demolishing the existing system, installing a new system, and performing any necessary demolition, concrete, masonry and metal work. Interested parties must visit the job site and are responsible for verifying existing conditions and utilities. Proposals are due by November 3, 2022 at 11:00 AM Eastern Time. Evaluation will consider technical qualifications, past performance, and price.
There is no set-aside designation. The primary NAICS code is 238220 - Plumbing, Heating, and Air-Conditioning Contractors and the PSC code is R499 - Other Repair and Alteration of Buildings. The soliciting agency is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2. The period of performance is 90 days from notice to proceed and the place of performance is 400 Fort Hill Avenue, Canandaigua, New York 14424. The estimated budget is between $500,000-$1,000,000. Bidders must attend pre-bid meetings and site visits to ensure understanding of the existing conditions and scope of work.
Notice text
3 versions
Update #3 · Latest ·
SCOPE OF WORK
Project No. 528A5-17-531
Upgrade Heating System for Building 8 Basement
Canandaigua, VA Medical Center, 400 Fort Hill Avenue Canandaigua, NY 14424
The general scope of this project is to upgrade Building 8 Basement Heating system at the Canandaigua VAMC.
1.0 EXISTING CONDITIONS
The Canandaigua VAMC is a campus facility with many (more than 30) buildings located on over 20 acres. Many of the facility buildings are included on the historic register. Buildings 5 and 12 are considered historic, and where necessary the renovations will comply with the requirements of the NYS SHPPO.
SCOPE OF WORK
GENERAL
The contractor shall be responsible for all labor, supervision, and materials required to perform the work as indicated in the scope of work, specifications and drawings.
All of the work is to be performed during normal business hours, however if any work is determined to be needed off hours the contractor must inform the COR.
The contractor is responsible for all field measurements; the Government will not be held responsible for bidding errors made or the failure to adequately inspect the job site for existing conditions, dimensions and grades or existing utilities. The contractor is responsible for verifying all utilities through any resource necessary. All bidders are strongly encouraged to inspect the job site prior to submitting bids. The government has provided a rough estimate of square footage.
Any existing feature disturbed (removed, damaged, etc.) by the contractor during the performance of this contract shall be restored to similar or better condition by the contractor at the contractors expense. This includes walls, doorways, doors, trim work, and other miscellaneous items located in the corridor, sidewalks, grassed areas, and parking lots.
During the entire duration of work performed, the contractor shall at all times, maintain at least one lane for emergency traffic. This includes any placement of project equipment and the main corridor where work is being performed. The contractor will only be allowed to work in a portion of the corridor at one time in order to comply with this requirement.
The VAMC Project COR shall govern all work done during project duration. Disputes shall be promptly referred to the Contracting Officer, (CO). The contractor will immediately correct any work in which the Project COR deems unacceptable or not in accordance with plans and/or specifications.
The contractor will not be allowed to stage material outside of the designated renovation area. All material will be stored in an approved location by the COR. All storage areas and refuse (roll offs) shall be fenced in with a minimum of 6 high, chain link fence.
The contractor will at all times comply with the attached ICRA standards.
The contractor shall provide a secure construction site at all times. In any area that is closed due to construction, including any time the corridor is partially closed, a passage door with a handle that locks and is cored to a Best system X-6 must be installed and secured. These areas shall also include contractor storage areas with man door access. Construction supply trailers will be padlocked and secured at all times. Padlocks and hasps will not be allowed as a means of security. Also, the access door shall be locked at all times, even during construction.
Demolition
Contractor is responsible for all costs associated with the demolition of this project, including removal of excess masonry material, metals, and other miscellaneous items that may be encountered.
Concrete/Masonry
During any concrete work, dust shall be contained at all times, both interior and exterior. The contractor, as stated earlier, shall comply with all requirements in the ICRA standard. This includes as a minimum: barriers, ventilation, negative pressurization, and dust mats at entrances.
Metals
Open flame cutting of any material will not be allowed. Cutting of metal studs will be by sheer only.
All metal fabrication and anchoring will be submitted to the COR for approval.
A. Contractor is to cover and protect the sprinkler heads. Any damage caused to the sprinklers must be repaired by the contractor. Any insulation sprayed onto the sprinkler heads must be removed by the contractor.
Fire Protection
All work associated with fire protection requires a minimum of 7 days notification to the COR for coordination with the Fire Department. Any disruption to the fire protection system, including the fire alarm and detection system is included in this requirement.
All work shall be in accordance with the VA Fire Design Manual, including temporary construction barriers.
The contractor shall notify the COR 2 weeks in advance of closing off any exit. If an exit is to be closed, the contractor shall provide all labor and materials to properly secure the exit and notify personnel that the exit is closed. The contractor shall be responsible for complying with the VA ILSM standards.
Period of Performance
The period of performance for this contract shall be 180 days from NTP.
The contractor shall at all times be in coordination with other projects on going in the area and it shall not affect the contract duration of this project.
Update #2 ·
SCOPE OF WORK
Project No. 528A5-17-531
Upgrade Heating System for Building 8 Basement
Canandaigua, VA Medical Center, 400 Fort Hill Avenue Canandaigua, NY 14424
The general scope of this project is to upgrade Building 8 Basement Heating system at the Canandaigua VAMC.
1.0 EXISTING CONDITIONS
The Canandaigua VAMC is a campus facility with many (more than 30) buildings located on over 20 acres. Many of the facility buildings are included on the historic register. Buildings 5 and 12 are considered historic, and where necessary the renovations will comply with the requirements of the NYS SHPPO.
SCOPE OF WORK
GENERAL
The contractor shall be responsible for all labor, supervision, and materials required to perform the work as indicated in the scope of work, specifications and drawings.
All of the work is to be performed during normal business hours, however if any work is determined to be needed off hours the contractor must inform the COR.
The contractor is responsible for all field measurements; the Government will not be held responsible for bidding errors made or the failure to adequately inspect the job site for existing conditions, dimensions and grades or existing utilities. The contractor is responsible for verifying all utilities through any resource necessary. All bidders are strongly encouraged to inspect the job site prior to submitting bids. The government has provided a rough estimate of square footage.
Any existing feature disturbed (removed, damaged, etc.) by the contractor during the performance of this contract shall be restored to similar or better condition by the contractor at the contractors expense. This includes walls, doorways, doors, trim work, and other miscellaneous items located in the corridor, sidewalks, grassed areas, and parking lots.
During the entire duration of work performed, the contractor shall at all times, maintain at least one lane for emergency traffic. This includes any placement of project equipment and the main corridor where work is being performed. The contractor will only be allowed to work in a portion of the corridor at one time in order to comply with this requirement.
The VAMC Project COR shall govern all work done during project duration. Disputes shall be promptly referred to the Contracting Officer, (CO). The contractor will immediately correct any work in which the Project COR deems unacceptable or not in accordance with plans and/or specifications.
The contractor will not be allowed to stage material outside of the designated renovation area. All material will be stored in an approved location by the COR. All storage areas and refuse (roll offs) shall be fenced in with a minimum of 6 high, chain link fence.
The contractor will at all times comply with the attached ICRA standards.
The contractor shall provide a secure construction site at all times. In any area that is closed due to construction, including any time the corridor is partially closed, a passage door with a handle that locks and is cored to a Best system X-6 must be installed and secured. These areas shall also include contractor storage areas with man door access. Construction supply trailers will be padlocked and secured at all times. Padlocks and hasps will not be allowed as a means of security. Also, the access door shall be locked at all times, even during construction.
Demolition
Contractor is responsible for all costs associated with the demolition of this project, including removal of excess masonry material, metals, and other miscellaneous items that may be encountered.
Concrete/Masonry
During any concrete work, dust shall be contained at all times, both interior and exterior. The contractor, as stated earlier, shall comply with all requirements in the ICRA standard. This includes as a minimum: barriers, ventilation, negative pressurization, and dust mats at entrances.
Metals
Open flame cutting of any material will not be allowed. Cutting of metal studs will be by sheer only.
All metal fabrication and anchoring will be submitted to the COR for approval.
A. Contractor is to cover and protect the sprinkler heads. Any damage caused to the sprinklers must be repaired by the contractor. Any insulation sprayed onto the sprinkler heads must be removed by the contractor.
Fire Protection
All work associated with fire protection requires a minimum of 7 days notification to the COR for coordination with the Fire Department. Any disruption to the fire protection system, including the fire alarm and detection system is included in this requirement.
All work shall be in accordance with the VA Fire Design Manual, including temporary construction barriers.
The contractor shall notify the COR 2 weeks in advance of closing off any exit. If an exit is to be closed, the contractor shall provide all labor and materials to properly secure the exit and notify personnel that the exit is closed. The contractor shall be responsible for complying with the VA ILSM standards.
Period of Performance
The period of performance for this contract shall be 90 days from NTP.
The contractor shall at all times be in coordination with other projects on going in the area and it shall not affect the contract duration of this project.
Update #1 ·
SCOPE OF WORK Project No. 528A5-17-531 Upgrade Heating System for Building 8 Basement Canandaigua, VA Medical Center, 400 Fort Hill Avenue Canandaigua, NY 14424 The general scope of this project is to upgrade Building 8 Basement Heating system at the Canandaigua VAMC. 1.0 EXISTING CONDITIONS The Canandaigua VAMC is a campus facility with many (more than 30) buildings located on over 20 acres. Many of the facility buildings are included on the historic register. Buildings 5 and 12 are considered historic, and where necessary the renovations will comply with the requirements of the NYS SHPPO. SCOPE OF WORK GENERAL The contractor shall be responsible for all labor, supervision, and materials required to perform the work as indicated in the scope of work, specifications and drawings. All of the work is to be performed during normal business hours, however if any work is determined to be needed off hours the contractor must inform the COR. The contractor is responsible for all field measurements; the Government will not be held responsible for bidding errors made or the failure to adequately inspect the job site for existing conditions, dimensions and grades or existing utilities. The contractor is responsible for verifying all utilities through any resource necessary. All bidders are strongly encouraged to inspect the job site prior to submitting bids. The government has provided a rough estimate of square footage. Any existing feature disturbed (removed, damaged, etc.) by the contractor during the performance of this contract shall be restored to similar or better condition by the contractor at the contractors expense. This includes walls, doorways, doors, trim work, and other miscellaneous items located in the corridor, sidewalks, grassed areas, and parking lots. During the entire duration of work performed, the contractor shall at all times, maintain at least one lane for emergency traffic. This includes any placement of project equipment and the main corridor where work is being performed. The contractor will only be allowed to work in a portion of the corridor at one time in order to comply with this requirement. The VAMC Project COR shall govern all work done during project duration. Disputes shall be promptly referred to the Contracting Officer, (CO). The contractor will immediately correct any work in which the Project COR deems unacceptable or not in accordance with plans and/or specifications. The contractor will not be allowed to stage material outside of the designated renovation area. All material will be stored in an approved location by the COR. All storage areas and refuse (roll offs) shall be fenced in with a minimum of 6 high, chain link fence. The contractor will at all times comply with the attached ICRA standards. The contractor shall provide a secure construction site at all times. In any area that is closed due to construction, including any time the corridor is partially closed, a passage door with a handle that locks and is cored to a Best system X-6 must be installed and secured. These areas shall also include contractor storage areas with man door access. Construction supply trailers will be padlocked and secured at all times. Padlocks and hasps will not be allowed as a means of security. Also, the access door shall be locked at all times, even during construction. Demolition Contractor is responsible for all costs associated with the demolition of this project, including removal of excess masonry material, metals, and other miscellaneous items that may be encountered. Concrete/Masonry During any concrete work, dust shall be contained at all times, both interior and exterior. The contractor, as stated earlier, shall comply with all requirements in the ICRA standard. This includes as a minimum: barriers, ventilation, negative pressurization, and dust mats at entrances. Metals Open flame cutting of any material will not be allowed. Cutting of metal studs will be by sheer only. All metal fabrication and anchoring will be submitted to the COR for approval. A. Contractor is to cover and protect the sprinkler heads. Any damage caused to the sprinklers must be repaired by the contractor. Any insulation sprayed onto the sprinkler heads must be removed by the contractor. Fire Protection All work associated with fire protection requires a minimum of 7 days notification to the COR for coordination with the Fire Department. Any disruption to the fire protection system, including the fire alarm and detection system is included in this requirement. All work shall be in accordance with the VA Fire Design Manual, including temporary construction barriers. The contractor shall notify the COR 2 weeks in advance of closing off any exit. If an exit is to be closed, the contractor shall provide all labor and materials to properly secure the exit and notify personnel that the exit is closed. The contractor shall be responsible for complying with the VA ILSM standards. Period of Performance The period of performance for this contract shall be 90 days from NTP. The contractor shall at all times be in coordination with other projects on going in the area and it shall not affect the contract duration of this project.
Files
| File | Type | Posted |
|---|---|---|
| 528A517531_IFB_Specifications_09172020-updated.pdf | ||
| 2nd pre bid site visit sign in sheet 10-5-2022.pdf | ||
| 36C24222B0074 0005.docx | DOCX document | |
| 528A517531_BidDocs_Drawings_09172020.pdf | ||
| 36C24222B0074 0004.docx | DOCX document | |
| PRE-BID SITE VISIT 9-7-22 SIGN IN SHEET.pdf | ||
| 36C24222B0074 0003.docx | DOCX document | |
| RFIs - ANSWERS.docx | DOCX document | |
| 36C24222B0074 0002.docx | DOCX document | |
| EP400.pdf | ||
| S07- WAGE DETERMINATION.pdf | ||
| 528A5-17-531 100 percent DD Specifications 07242020.pdf |
Show all 12
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Z1DA--528A5-17-531 upgrade building 8 basement heating system canandaigua, NY VAMC | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Y1DZ--replace chilled water pump at the boiler plant | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| VA Canandaigua Phase III Presolicitation Notice | ENDIST Buffalo | No set-aside | |
| Z1DA--NRM CONST - 528A7-18-707 - Replace Boiler Stack Rome CBOC | Veterans Integrated Service Network 2 | Total Small Business | |
| Z2NZ--Turn Key Chiller Equipment (Purchase and Install) | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business | |
| CON | Z1DA | replace or chillers | 580-23-105 | solicitation | Veterans Integrated Service Network 16 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity