RFIs - ANSWERS.docx
DOCX document 17 KB Posted
- Solicitation number
- 36C24222B0074
About this file
This document contains a request for information (RFI) related to the federal contract opportunity to upgrade the heating system in Building 8 basement at the Canandaigua VA Medical Center. Key details include:
-
The project involves upgrading the existing heating system in the Building 8 basement to address needs during the non-heating season. Work will be done in phases to avoid impacting patient care spaces and clinical areas.
-
The period of performance for the contract is 180 days. Work can only be done during non-heating seasons unless supplemental heat is provided at no additional cost.
-
RFI responses clarify specifications around the existing ceiling grid and tile, use of ICRA barriers during work, approval of alternate equipment brands if performance standards are met, and pressure details for the steam system.
-
Asbestos abatement is not included in the contract scope and should be bid separately. Fire walls and smoke barriers are also identified.
The document provides relevant specification and site details to inform bidding on the contract opportunity from the Department of Veterans Affairs to upgrade the aging heating system.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2nd pre bid site visit sign in sheet 10-5-2022.pdf | ||
| 528A517531_IFB_Specifications_09172020-updated.pdf | ||
| 528A517531_BidDocs_Drawings_09172020.pdf | ||
| 36C24222B0074 0005.docx | DOCX document | |
| 36C24222B0074 0004.docx | DOCX document | |
| 36C24222B0074 0003.docx | DOCX document | |
| PRE-BID SITE VISIT 9-7-22 SIGN IN SHEET.pdf | ||
| 36C24222B0074 0002.docx | DOCX document | |
| 528A5-17-531 100 percent DD Specifications 07242020.pdf | ||
| EP400.pdf | ||
| S07- WAGE DETERMINATION.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
UPGRADE BUILDING 8 BASEMENT HEATING SYSTEM
PROJECT # 528A5-17-531
CANANDAIGUA
REQUEST FOR INFORMATION(RFIs)
| Q: | Can you provide the manufacturer, model number, color, and finish for the existing ceiling grid and tile for the work areas? |
| A: | Armstrong 770 square lay in white tile, Prelude XL 15/16” Exposed Tee. |
Q: Can you confirm the Period of performance is expected to be 90 days? Will work only be done during non-heating season?
A: Period of performance is 180 days and yes work will only be done during non- heating seasons unless you are providing supplemental heat at no additional cost to the government.
Q: Will all work have to be done behind ICRA Barriers, Will all ICRA Barriers have to be hard barriers?
A: Yes, all work will have to be done behind ICRA barriers but can use 6 mil poly does not have to be hard barriers. All ICRA barriers will be inspected by the COR to ensure tightness.
| Q: | There was talk of work needing to be done on the 1st and 2nd floor during site visit, can you clarify this? |
| A: | There is no physical work being done on the first and second floor the heating system though affects the floors above. |
| Q: | What type of phasing for project should be anticipated? |
| A: | Anticipate having the project in phases, Due to the area being patient care spaces as well as clinicals. |
| Q: | What walls are smoke/fire rated? |
| A: | Fire walls room 5, EBX2, SBX1, SBX2, 11, 12, 02 storage/ All other walls are smoke barrier |
Q: Specifications (SECTION 02 41 00 1.2 RELATED WORK E. & 23 05 11 3.6 MECHANICAL DEMOLITION E. //Asbestos Insulation Removal: Conform to Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.// both reference Asbestos Removal: Section 02 82 11, TRADITIONAL ASBESTOS ABATEMENT.) reference Section 02 82 11 however that section does not appear to be present in the specifications provided. Please confirm if a survey for asbestos-containing material been conducted? If there has been a survey, please provide to bidders. If there has not been a survey, please confirm the government will provide a modification to cover the cost of an asbestos survey and abatement should any asbestos materials be discovered during demolition or construction.
A: Asbestos Abatement is not part of this contract and should be bid as such.
| Q: | On the drawings, Bell & Gossett is listed for the Heat Exchangers. Will you accept Armstrong? |
| A: | Armstrong can be considered as long as it meets or exceeds the design of Bell and Gosset’s heat exchangers and is approved by the COR. |
Q: What is the incoming steam pressure to the pressure reducing valves?
A: The steam pressure comes into the building as high pressure steam at 68 PSI and reduces to medium at 25 to 30 psi and then to low 7 to 10 pounds.
Q: For the PRV Stations, Armstrong has the options of the complete PRV Station completely piped for easy hookup with all the necessary components. Should we quote this, the individual components, or just the PRV’s?
A: Quote the entire component as long as it stays within the scope of work indicated on the drawings and is approved by the COR.