Z1DA--528A5-17-531 UPGRADE BUILDING 8 BASEMENT HEATING SYSTEM CANANDAIGUA, NY VAMC
Solicitation number
36C24222B0074
Issued by

About this file

This document provides details for a federal contract opportunity to upgrade the heating system in the basement of Building 8 at the Canandaigua VA Medical Center in Canandaigua, New York. The scope of work involves upgrading the existing heating system and includes demolition of the current system, installation of a new heating system, and compliance with all applicable construction standards. The period of performance for the contract is 180 days from notice to proceed. Submissions are due by November 3rd, 2022 at 11:00 AM Eastern Time, as amended. The solicitation was issued by the Department of Veterans Affairs Network Contracting Office and questions should be directed to the listed contracting officer.

View the file

Other files

File Type Posted
2nd pre bid site visit sign in sheet 10-5-2022.pdf PDF
528A517531_IFB_Specifications_09172020-updated.pdf PDF
528A517531_BidDocs_Drawings_09172020.pdf PDF
36C24222B0074 0004.docx DOCX document
RFIs - ANSWERS.docx DOCX document
36C24222B0074 0003.docx DOCX document
PRE-BID SITE VISIT 9-7-22 SIGN IN SHEET.pdf PDF
36C24222B0074 0002.docx DOCX document
528A5-17-531 100 percent DD Specifications 07242020.pdf PDF
EP400.pdf PDF
S07- WAGE DETERMINATION.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE

7.

ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER

3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF

PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO.

1. CONTRACT ID CODE

FACILITY CODE

CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE

OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.

is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERE

D CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR

OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendmen t, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED

STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER

16A. NAME AND TITLE OF

CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30

PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243 (Type or print) (Type or print) (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code) (If other than Item 6) (Specify type of modification and authority) (such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF

SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

TBD

528-23-1-5192-0001 528A5-17-531 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 Department of Veterans Affairs Network Contracting Office (NCO) 2 2875 Union Road Suite 3500 Cheektowaga NY 14227 To all Offerors/Bidders

36C24222B0074 09-29-2022

X X X ** HOUR & DATE for Receipt of Offers is EXTENDED to:

Thursday,November 3, 2022 at 11:00AM ET The intent of this amendment is to:

Add updated drawings and specifications

NEW BIDs due date is Thursday, 11/03/22 at 11 AM E.T..

Add copy of 2nd pre-bid site visit sign in sheet

Any questions are to be directed to Idalia Algarin, CO at idalia.algarin@va.gov.

Idalia Algarin Contracting Officer

SCOPE OF WORK

Project No. 528A5-17-531 Upgrade Heating System for Building 8 Basement Canandaigua, VA Medical Center, 400 Fort Hill Avenue Canandaigua, NY 14424

The general scope of this project is to upgrade Building 8 Basement Heating system at the Canandaigua VAMC.

1.0 EXISTING CONDITIONS

The Canandaigua VAMC is a campus facility with many (more than 30) buildings located on over 20 acres. Many of the facility buildings are included on the historic register. Buildings 5 and 12 are considered historic, and where necessary the renovations will comply with the requirements of the NYS SHPPO.

2.0 SCOPE OF WORK

2.1 GENERAL

A. The contractor shall be responsible for all labor, supervision, and materials required to perform the work as indicated in the scope of work, specifications and drawings.

B. All of the work is to be performed during normal business hours, however if any work is determined to be needed off hours the contractor must inform the COR.

C. The contractor is responsible for all field measurements; the Government will not be held responsible for bidding errors made or the failure to adequately inspect the job site for existing conditions, dimensions and grades or existing utilities. The contractor is responsible for verifying all utilities through any resource necessary. All bidders are strongly encouraged to inspect the job site prior to submitting bids. The government has provided a rough estimate of square footage.

D. Any existing feature disturbed (removed, damaged, etc.) by the contractor during the performance of this contract shall be restored to similar or better condition by the contractor at the contractors’ expense. This includes walls, doorways, doors, trim work, and other miscellaneous items located in the corridor, sidewalks, grassed areas, and parking lots.

E. During the entire duration of work performed, the contractor shall at all times, maintain at least one lane for emergency traffic. This includes any placement of project equipment and the main corridor where work is being performed. The contractor will only be allowed to work in a portion of the corridor at one time in order to comply with this requirement.

F. The VAMC Project COR shall govern all work done during project duration. Disputes shall be promptly referred to the Contracting Officer, (CO). The contractor will immediately correct any work in which the Project COR deems unacceptable or not in accordance with plans and/or specifications.

G. The contractor will not be allowed to stage material outside of the designated renovation area. All material will be stored in an approved location by the COR. All storage areas and refuse (roll offs) shall be fenced in with a minimum of 6’ high, chain link fence.

H. The contractor will at all times comply with the attached ICRA standards.

I. The contractor shall provide a secure construction site at all times. In any area that is closed due to construction, including any time the corridor is partially closed, a passage door with a handle that locks and is cored to a Best system X-6 must be installed and secured. These areas shall also include contractor storage areas with man door access. Construction supply trailers will be padlocked and secured at all times. Padlocks and hasps will not be allowed as a means of security. Also, the access door shall be locked at all times, even during construction.

2.2 Demolition

A. Contractor is responsible for all costs associated with the demolition of this project, including removal of excess masonry material, metals, and other miscellaneous items that may be encountered.

2.3 Concrete/Masonry

A. During any concrete work, dust shall be contained at all times, both interior and exterior. The contractor, as stated earlier, shall comply with all requirements in the ICRA standard. This includes as a minimum: barriers, ventilation, negative pressurization, and dust mats at entrances.

2.4 Metals

A. Open flame cutting of any material will not be allowed. Cutting of metal studs will be by sheer only.

B. All metal fabrication and anchoring will be submitted to the COR for approval.

A. Contractor is to cover and protect the sprinkler heads. Any damage caused to the sprinklers must be repaired by the contractor. Any insulation sprayed onto the sprinkler heads must be removed by the contractor.

2.5 Fire Protection

A. All work associated with fire protection requires a minimum of 7 days notification to the COR for coordination with the Fire Department. Any disruption to the fire protection system, including the fire alarm and detection system is included in this requirement.

B. All work shall be in accordance with the VA Fire Design Manual, including temporary construction barriers.

C. The contractor shall notify the COR 2 weeks in advance of closing off any exit. If an exit is to be closed, the contractor shall provide all labor and materials to properly secure the exit and notify personnel that the exit is closed. The contractor shall be responsible for complying with the VA ILSM standards.

3.0 Period of Performance

A. The period of performance for this contract shall be 180 days from NTP.

B. The contractor shall at all times be in coordination with other projects on going in the area and it shall not affect the contract duration of this project.

See attached document: 2nd pre bid site visit sign in sheet 10-5-2022.

See attached document: 528A517531_BidDocs_Drawings_09172020.

See attached document: 528A517531_IFB_Specifications_09172020-updated.