Yaquina Main Propulsion Shaft and Hub Overhaul

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W9127N25Q0033
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
336611 Ship Building and Repairing
PSC
Not on record
Place of performance
Portland, Oregon 97204, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers (USACE) Portland District is conducting a Sources Sought Synopsis for the Yaquina Main Propulsion Shaft and Hub Overhaul, seeking contractors capable of performing critical dredge vessel maintenance. The project involves repairing two main propulsion shafts and two hubs at an ABS-approved Tailshaft Cladding Facility, with specific technical requirements including removal of existing shaft sleeves, magnetic particle inspections, installation of new Nickel Chrome Boron (NCB) liners, and Glass Reinforced Plastic (GRP) coating. Interested vendors must submit detailed documentation including their CAGE code, Unique Entity ID, small business status, and a Statement of Capability demonstrating technical competence in marine vessel maintenance. Technical inquiries should be directed to Julia Carlton and Brandon Lasich via email, with responses due by May 9, 2025. Evaluation will focus on vendors' skills, knowledge, experience, and capability to perform the described dredge vessel maintenance work.

The pre-solicitation notice does not specify a small business set-aside, though vendors are asked to indicate their small business status if applicable under NAICS 336611. The local technical representative for the USAV Yaquina's homeport is Pacific Marine Equipment, LLC (Todd Terry), and the contractor must also retain a Hundested Technical Representative. While no specific award value is mentioned, the work involves significant technical complexity, including transportation of shafts and tooling weighing approximately 13,650 lbs with an overall length of 42 inches. The project requires comprehensive quality control, with ABS and USCG inspections at multiple progress points, and the work must be completed with precise specifications, including specific surface treatments, coating applications, and machining tolerances. The performance timeline indicates the work should be completed by November 28, 2025, with detailed documentation and reporting requirements throughout the maintenance process.

Notice text

Yaquina Main Propulsion Shaft and Hub Overhaul Sources Sought:

This announcement is a Sources Sought Synopsis (market survey). This is not a Request for Proposal (RFP). This announcement is not a commitment by the Government, implied or otherwise, to issue a solicitation or award a contract. The purpose of this Sources Sought is to determine interested parties, socioeconomic status availability, capabilities, and qualifications. The Government intends to use responses to this sources sought synopsis to make appropriate acquisition decisions for future ship maintenance requirements.

The U.S. Army Corps of Engineers (USACE) – Portland District is requesting your help in identifying contractors with the capability and availability to respond to critical dredge vessel maintenance/repairs:

Repair quantity two (2) main propulsion shafts and quantity two (2) hubs as specified below. NOTE: ABS Surveyor may request to be present at other progress points not mentioned or require documentation that ABS recommendations are being met. Contractor shall include reasonable costs for ABS inspections in their price for this work task. Contractor shall ensure USCG and ABS are present for all inspections.

Rebuild Services:
Repairs shall be performed at an ABS-approved Tailshaft Cladding Facility. The Contractor shall retain the services of a Hundested Technical Representative. All repairs shall be completed to the tech reps specifications. The local tech rep for USAV Yaquina’s homeport is Pacific Marine Equipment, LLC (Todd Terry). Contractor shall provide transportation for the GFP shafts and tooling to the approved repair facility. Shafts and tooling shall be transported in Government-provided containers. Shipping weight for each shaft / hub / container is approximately 13,650 lbs with an overall length (LOA) of 42’. Upon completion of work, return the shaft, hub, and CRPP shaft tooling to the U.S. Moorings Logistics Warehouse at 8010 NW. St. Helens Rd., Portland, OR 97210.

Hub Repairs:
|The OEM Service Technician shall inspect and provide CFR with repair plan for hub repairs/overhauls. The OEM shall be on-site performing inspection within one (1) week of propulsion shaft arrival at Contractor facility. The CFR shall be submitted to the COR no later than one (1) week after hub inspection is complete.

Shaft Repairs:
Remove and scrap existing shaft sleeves and fiberglass cladding. Remove all paint, rust or other surface coatings to bare metal. Provide magnetic particle or dye penetrant inspection of shafts to ABS standards. ABS and USCG shall be given 48-hour notice of this inspection to witness testing. Verify existing shaft dimensions including OD / total indicated run out (TIR) and provide a CFR.

Skim cut liner surfaces to remove existing run outs and achieve required surface finish in accordance with CFR.

Fabricate and install new bearing shaft sleeves IAW measured shaft dimensions and dimensions as shown on Drawings 0-002-020932-2 (Port) and 0-002-020933-2 (Starboard).

NOTE: Forward bearing liner location has been modified from original print with new location, 40 mm forward of original with no change to LOA.

The Contractor shall procure and install new NCB liners on both port and starboard main propulsion shafts from an OEM authorized seller/dealer. The liners shall have all required USCG approvals. The bearing shaft sleeves shall be constructed and machined to match the dimensions shown on the drawings Hundested drawings MP700/CPG120 Installation Unit 6330-G1177 (port shaft) and Hundested drawings MP700/CPG120i Installation Unit 6331/G1178 (stbd) and verified by shaft measurements. The shaft sleeves shall be constructed of stainless steel with a Nickel Chrome Boron liners (NCB) surface coating meeting CID A-A-59315/15. Final surface hardness of coating shall be 57-63 Rockwell “C”. The NCB liner shall be installed per manufacturers specifications. Installation plan shall be provided to the COR one (1) week before installation of liners. COR shall be present for the installation of the liners.

All sleeves shall be turned down on the O.D. to give a clean concentric mating surface. The outer surface of each sleeve shall be sprayed with NCB powder coating and fused into the base metal at minimum temperature of 1925 degrees Fahrenheit. The NCB coating shall completely encapsulate the outer surface of each liner. The O.D. of the sleeve shall be machine ground to RMS finish of 12-16. In addition, the finished NCB sleeves shall have a coating thickness of 0.060 inches to 0.070 inches.

Interference fit of sleeves shall not exceed 0.003 inch. Machine sleeves for fiberglass seal areas on liners

Prepare shaft surface, as necessary, and install new Glass Reinforced Plastic (GRP) coating on shafts with a minimum of 4 wraps. GRP shall be spark tested as required by ABS.

Upon final acceptance of shaft assembly, all sleeve areas and hub shall be coated with a preservative coating meeting MIL-C-11796C Class.
 

SUBMISSION REQUIREMENTS FOR RESPONSES TO THIS SOURCES SOUGHT SYNOPSIS
Vendors interested in this requirement(s) with Portland District must submit the documentation and meet the requirements identified below.

A. General Submission Information:

1. Point of Contact name, email address, and phone number.

2. CAGE Code and Unique Entity ID number (All contractors are required to be registered in the DOD System for Award Management (SAM) via https://www.sam.gov).

3. In the event that the contractor is a small business under NAICS 336611 or that of a similar size standard, state the category of small business, such as 8(a), HUBZone, Veteran Owned Small Business, Woman Owned Small Business, or SDVOSB.

4. Statement of Capability (SOC) Statement of the contractor’s skills, knowledge, experience, and capability to perform the described work, such as documentation and examples of recent relevant experience and technical competence with dredging.


INSTRUCTIONS
Submit technical inquires and questions relating to this sources sought in writing via email to
Julia Carlton (Julia.b.carlton2.civ@usace.army.mil)
Brandon Lasich (brandon.m.lasich@usace.army.mil)
 

SMALL BUSINESS POINT OF CONTACT
The point of contact for small business questions or assistance is the Portland District Deputy for Small Business:
Maura Timmermann
Phone: 402-370-0095
Email: Maura.J.Timmermann@usace.army.mil

Files

Notice history

Notice Type Posted
Yaquina Main Propulsion Shaft and Hub Overhaul Award Award Notice
Yaquina Main Propulsion Shaft and Hub Overhaul Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Yaquina River Clamshell Dredging 2027 downstream of Toledo, OR. SW Altree Ln Toledo OR 97391 97391 · NAICS 237990 ENDIST Portland No set-aside
3389 Large Class Hopper Dredge (LCHD-ESS) NAICS 336611 ENDIST Philadelphia No set-aside
Maintenance, Repair, and Preservation of YT-812 Washington, United States · NAICS 336611 Naval Supply Systems Command No set-aside
USCG STA coos BAY (47302-47242) FY27 DD repair Charleston, Oregon 97420, United States · NAICS 336611 — Total Small Business
Drydock repairs for the CGC anvil NAICS 336611 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity