Y1DA--NRM-CONST 630A4-20-412 Repair Parking Lots and Roads SA
Closed Solicitation Posted
- Solicitation number
- 36C24226B0014
- Agency
-
Veterans Integrated Service Network 2
Veterans Health Administration, Department of Veterans Affairs
- Responses due
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- Jamaica, New York 11424, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs, Veterans Health Administration, Veterans Integrated Service Network 2 is soliciting sealed bids from qualified construction firms to repair parking lots and roads at the St. Albans VA Medical Center located at 179-00 Linden Boulevard, Queens, New York. The scope of work encompasses comprehensive site preparation, demolition, earthwork, installation of concrete pavements for parking lots and roadways, asphalt paving, utility work including water distribution and storm sewer systems, electrical installations for exterior lighting, erosion control, landscaping, and commissioning activities across multiple phased areas (Phases A through O) while maintaining the facility's 24/7 operational status. Contractors must furnish all labor, materials, tools, supervision, equipment, and safety measures in accordance with 100% Issue for Construction (IFC) documents and must comply with VA criteria, Davis-Bacon prevailing wage rates, Buy American construction material requirements, and OSHA safety regulations. The solicitation requires submission of a Critical Path Method schedule with cost-loaded activities, an Accident Prevention Plan with Activity Hazard Analyses, and a Quality Control Plan. Key dates include a mandatory site visit on February 13, 2026 at 10:00 AM, a Request for Information submission deadline of February 20, 2026 at 12:00 PM, and a sealed bid submission deadline of March 20, 2026 at 12:00 PM EDT via email, with public bid opening scheduled for March 24, 2026 at 3:00 PM.
This solicitation is a 100 percent set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB) under the NAICS code 236220 (Commercial and Institutional Building Construction) with a small business size standard of $45 million. The contract magnitude falls between $5,000,000 and $10,000,000, with a performance period of 365 calendar days from notice to proceed. Bidders must be registered and certified with the SBA's Veteran Small Business Certification Program and registered at SAM.gov, with a bid guarantee of 20 percent of the bid price or $3,000,000 (whichever is less) required. All contractor personnel must complete VA Privacy and Information Security Awareness training prior to commencing work and must utilize the VISN 2 Autodesk Build Construction Management Platform for all project communications and documentation. The place of performance is located at 12055 Queens Boulevard, Suite 8, Jamaica, New York 11424, with liquidated damages assessed at $719.53 per calendar day for any inexcusable delay in project completion.
Notice text
2 versions
Update #2 · Latest ·
THIS AMENDMENT IS TO PROVIDE ANSWERS TO THE RFIS RECEIVED - NO FURTHER RFIS WILL BE ACCEPTED.
The Department of Veterans Affairs (VA), NCO 2 St. Albans VA Medical Center, is seeking highly qualified construction firms to: repair parking lots and roads at the St. Albans VA Medical Center, 179-00 Linden Boulevard, Queens, NY 11424-1468 in accordance with the provided drawings and specifications.
Specific Requirement:
The Contractor shall furnish all labor, materials, tools, supervision, equipment, and safety necessary to perform the Connection site preparation. At a minimum, the following shall be performed:
1. The general contractor (GC) shall follow the Architect/Engineer 100% Issue for Construction (IFC) documents to construct and repair the parking lots and roads at SA.
2. The Contractor shall schedule all work with VA COR
3. The contractor shall provide all necessary labor and materials to prepare construction documents during the construction phase of the project.
4. All work shall conform to VA criteria and regulation
5. For construction details, please refer to ATTACHMENT “100% Construction Documents NARRATIVE” and “100% Issue for Construction (IFC)” as reference
General Requirement: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, labelling, commissioning, and site visits necessary to perform the site preparation. At minimum, the following shall be performed: Refer to the following attachment for detailed project information and requirement, additional information can be found in VA Technical Information Library (TIL) https://www.cfm.va.gov/til/spec.asp#26: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, commissioning, site visit necessary to perform the site preparation. At a minimum, the following shall be performed:
- The Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities. The Contractor, along with the facility, shall jointly lock out/tag out electrical power boxes that supply power to the unit.
- The Contract shall provide and install all electrical and piping connections by certified technicians in their trades.
- The Contractor shall test and verify all work to ensure proper operation.
- The Contractor must have OSHA training and specialized OSHA training.
- In the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.).
- All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications.
- The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost. The Contractor shall, within that period, correct all defects in materials/workmanship within twenty-four (24) hours of being notified. The Contractor shall inform the government of any manufacturer’s warranty that will exceed the one-year warranty the Contractor offers. A document shall have at least the company, phone number, and the address where the government can obtain the manufacturer's information for an extended warranty.
- It is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and VA Engineering Team of any differing site conditions prior to starting.
- The Contractor shall always provide an English-Speaking working supervisor on-site when work is being performed and for the duration of this project. A supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this.
- The Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc.
- The Contractor shall post visible required warning signs and barriers prior to beginning any work.
- The Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government.
- The Contractor shall be responsible for the proper and safe removal and disposal of all debris. Contractors shall be required to provide tipping reports for the weights of construction waste recycled and landfilled. VA Directive 0063 requires 50% of waste to be prevented or recycled.
- The Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift.
- The C&A requirements do not apply, and a Security Accreditation Package is not required.
- The Contractor is responsible for completing the VA Privacy and Information Security Awareness training.
Project Management Platform Requirement
A. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize the VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through the project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning, and Retro-Commissioning contracts. There is no user, license, or subscription fee for the contractor to use this cloud-based platform.
B. The contractor shall accomplish and complete the following tasks upon award of the contract:
1. Request access to the ACC platform and Productivity NOW eLearning Site to project VA COR NLT 14 days from contract award.
2. Only staff who shall utilize the platform shall be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.
3. The access request shall be in writing and include a list of staff. The list shall include the following information: • Full Name • Company Name • Email Address • Role/Position on the project (i.e., Project manager, site super)
4. Upon granting access, staff shall complete the required ACC training through the Productivity NOW platform within 12 Calendar days.
5. Upon successful completion of the training, the contractor shall submit certificates of completion to COR NLT 2 business days.
C. Access to Productivity NOW eLearning will expire after 12 Calendar days after online access is granted. The contractor shall complete ACC training within that period.
D. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above
E. The contractor shall only use the ACC platform for contract-required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in the contract amount provided for the contractor’s failure to utilize the ACC platform as the project’s official communication and collaboration system. Any correspondence outside the platform shall not be the governing authority's responsibility and will be at the contractor’s expense. Official project correspondence and collaboration include, but are not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.
F. The contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes apply to employees granted access to the ACC platform. The contractor shall request termination of access, replacement of personnel, and/or any other action that might impact the contractor’s ability to maintain the required utilization of the platform.
G. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing the required ACC Platform training.
All work shall conform to VA criteria and regulations and shall be performed by OSHA-certified personnel. The Contractor shall take all necessary precautions and safety measures to protect patients, visitors, and staff during all phases of construction. The Contractor shall coordinate all work activities with the VA Contracting Officer’s Representative (COR) to minimize impact on operations and access.
The Contractor shall test and verify all work to ensure proper operation, quality, and compliance with VA and manufacturer specifications. The Contractor must have OSHA training and specialized OSHA safety training for construction environments. The Contractor shall guarantee that all work performed will be free from defects in workmanship and materials and that all installation and repairs will provide the required capacity and performance as specified. The Contractor shall correct any defects within twenty-four (24) hours of notification at no cost to the Government.
All work shall be done in accordance with VA, NFPA, Life Safety, OSHA regulations, and manufacturer specifications. The Contractor shall be responsible for cleanup, debris removal, and recycling in accordance with VA Directive 0063, which requires that at least 50% of construction waste be prevented or recycled. The Contractor shall provide and maintain a clean, safe work area at all times.
The Contractor shall comply with all VA requirements for site supervision, ensuring that an English-speaking supervisor with a minimum of five years of experience is present during all work. The Contractor shall provide its own storage for materials, tools, and equipment, as the VA will not be responsible for loss or damage.
The Contractor shall comply with the VA Privacy and Information Security Awareness training requirements. All personnel must complete “VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or Use of VA Sensitive Information.” Proof of completion shall be submitted to the COR prior to commencing work and renewed annually.
All construction contractors and A/E firms performing work under this project shall utilize the VISN 2 Autodesk Build Construction Management Platform (Autodesk Construction Cloud – ACC). Access and training will be provided by the VA COR at no cost to the Contractor. The ACC platform shall be used for all official project correspondence, RFIs, submittals, schedules, testing reports, and safety documentation.
IAW VAAR 836.204 Estimated Construction Cost Range is $5,000,000-$10,000,000. The NAICS code for this procurement is 236220, Commercial and Institutional Building Construction, size standard: $45.5 million. A bid bond will be required to respond to the IFB once released.
Prospective contractors must be registered and certified online with Veteran Small Business Certification (sba.gov) and must be registered at https://www.sam.gov in accordance with 38 CFR Part 74 and VAAR 819.70 to be eligible for award. There will be a site visit held for this project, and all prospective bidders are strongly encouraged to attend. Details of the site visit will be included in the solicitation document. It is anticipated that the solicitation will be issued on/about December 19, 2025. Information for Bid details, Specifications, Drawings, and Contract Forms will be available in electronic format only at: https://www.sam.gov. All interested parties (subs & primes) should register for a user account, which lets you save searches, follow changes to opportunities, and join interested vendor lists.
To preserve the integrity of the procurement process, all questions and requests for information must be submitted in writing to Vladimir Stoyanov, Contract Specialist, via email at Vladimir.Stoyanov@va.gov.
Update #1 ·
The Department of Veterans Affairs (VA), NCO 2 St. Albans VA Medical Center, is seeking highly qualified construction firms to: repair parking lots and roads at the St. Albans VA Medical Center, 179-00 Linden Boulevard, Queens, NY 11424-1468 in accordance with the provided drawings and specifications.
Specific Requirement:
The Contractor shall furnish all labor, materials, tools, supervision, equipment, and safety necessary to perform the Connection site preparation. At a minimum, the following shall be performed:
1. The general contractor (GC) shall follow the Architect/Engineer 100% Issue for Construction (IFC) documents to construct and repair the parking lots and roads at SA.
2. The Contractor shall schedule all work with VA COR
3. The contractor shall provide all necessary labor and materials to prepare construction documents during the construction phase of the project.
4. All work shall conform to VA criteria and regulation
5. For construction details, please refer to ATTACHMENT “100% Construction Documents NARRATIVE” and “100% Issue for Construction (IFC)” as reference
General Requirement: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, labelling, commissioning, and site visits necessary to perform the site preparation. At minimum, the following shall be performed: Refer to the following attachment for detailed project information and requirement, additional information can be found in VA Technical Information Library (TIL) https://www.cfm.va.gov/til/spec.asp#26: The Contractor shall furnish all labor, materials, tools, hardware, supervision, equipment, safety, drawing, rigging, permit, commissioning, site visit necessary to perform the site preparation. At a minimum, the following shall be performed:
- The Contractor shall take all necessary precautions and safety measures to protect all patients and end users from all related activities. The Contractor, along with the facility, shall jointly lock out/tag out electrical power boxes that supply power to the unit.
- The Contract shall provide and install all electrical and piping connections by certified technicians in their trades.
- The Contractor shall test and verify all work to ensure proper operation.
- The Contractor must have OSHA training and specialized OSHA training.
- In the performance of all work, the workers must be incompliance with safety regulations governing worker safety (OSHA: 29 CFR 1926 Safety and Health Regulations for Construction; NFPA, Life Safety Codes, etc.).
- All work shall be done in accordance with NFPA, Life Safety, VA Standards and Regulations, VA Policy and requirements, OSHA regulations, and manufacturer specifications.
- The Contractor shall guarantee that all work performed will be free from all defects in workmanship and materials and that all installation and repair will provide the capacities and characteristics specified. The contractor shall guarantee that if, during a period of one year from the date of the certificate of completion and acceptance of the work, any such defects shall be repaired by the contractor at his own cost. The Contractor shall, within that period, correct all defects in materials/workmanship within twenty-four (24) hours of being notified. The Contractor shall inform the government of any manufacturer’s warranty that will exceed the one-year warranty the Contractor offers. A document shall have at least the company, phone number, and the address where the government can obtain the manufacturer's information for an extended warranty.
- It is the responsibility of the contractor to verify all quantities, field conditions, and measurements prior to starting work. The contractor shall notify the CO/COR and VA Engineering Team of any differing site conditions prior to starting.
- The Contractor shall always provide an English-Speaking working supervisor on-site when work is being performed and for the duration of this project. A supervisor must have a minimum of five (5) years of experience as a supervisor on five (5) projects like this.
- The Contractor shall provide his own storage for materials. The VA is not responsible for loss of tools, materials, equipment, etc.
- The Contractor shall post visible required warning signs and barriers prior to beginning any work.
- The Contractor shall be responsible for any damage caused by his employees. All damages shall be repaired and/or replaced at no additional cost to the government.
- The Contractor shall be responsible for the proper and safe removal and disposal of all debris. Contractors shall be required to provide tipping reports for the weights of construction waste recycled and landfilled. VA Directive 0063 requires 50% of waste to be prevented or recycled.
- The Contractor shall perform cleanup at any time when the work area becomes cluttered and/or restricts traffic. At a minimum, the Contractor shall clean the work area at the end of each work shift.
- The C&A requirements do not apply, and a Security Accreditation Package is not required.
- The Contractor is responsible for completing the VA Privacy and Information Security Awareness training.
Project Management Platform Requirement
A. Construction contractors and A/E design firms, selected by award to perform work at VISN 2 VA facilities, are required to utilize the VISN 2 Autodesk Build Construction management platform, also called Autodesk Construction Cloud (ACC). Access to the platform and training portal will be provided by VISN 2 through the project Contracting Officer Representative (COR) at no cost for the duration of the project. Autodesk Build is the management and collaborative environment that VISN 2 uses for all its Non-Recurring Maintenance (NRM), Minor Program projects, Feasibility Studies, Commissioning, and Retro-Commissioning contracts. There is no user, license, or subscription fee for the contractor to use this cloud-based platform.
B. The contractor shall accomplish and complete the following tasks upon award of the contract:
1. Request access to the ACC platform and Productivity NOW eLearning Site to project VA COR NLT 14 days from contract award.
2. Only staff who shall utilize the platform shall be granted access. Examples: Project manager, sub-contractors POC, Site manager, Safety officer, etc.
3. The access request shall be in writing and include a list of staff. The list shall include the following information: • Full Name • Company Name • Email Address • Role/Position on the project (i.e., Project manager, site super)
4. Upon granting access, staff shall complete the required ACC training through the Productivity NOW platform within 12 Calendar days.
5. Upon successful completion of the training, the contractor shall submit certificates of completion to COR NLT 2 business days.
C. Access to Productivity NOW eLearning will expire after 12 Calendar days after online access is granted. The contractor shall complete ACC training within that period.
D. Additional Staff and Subcontractors can be added at any time with a request submission to the project COR as described above
E. The contractor shall only use the ACC platform for contract-required submissions, official project correspondence to be acknowledged, reviewed, and actioned by the responsible party. No additional time shall be added to the contract, nor an increase in the contract amount provided for the contractor’s failure to utilize the ACC platform as the project’s official communication and collaboration system. Any correspondence outside the platform shall not be the governing authority's responsibility and will be at the contractor’s expense. Official project correspondence and collaboration include, but are not limited to: RFIs, submittals, schedules, shutdown requests, actionable tasks, reports, testing, safety inspections, photos, and site surveys.
F. The contractor must inform the COR of any staff changes NLT 2 business days from the change. Staff changes apply to employees granted access to the ACC platform. The contractor shall request termination of access, replacement of personnel, and/or any other action that might impact the contractor’s ability to maintain the required utilization of the platform.
G. Contractor submission requirements cannot be accepted for work to begin without meeting all ACC Platform requirements outlined herein, including completing the required ACC Platform training.
All work shall conform to VA criteria and regulations and shall be performed by OSHA-certified personnel. The Contractor shall take all necessary precautions and safety measures to protect patients, visitors, and staff during all phases of construction. The Contractor shall coordinate all work activities with the VA Contracting Officer’s Representative (COR) to minimize impact on operations and access.
The Contractor shall test and verify all work to ensure proper operation, quality, and compliance with VA and manufacturer specifications. The Contractor must have OSHA training and specialized OSHA safety training for construction environments. The Contractor shall guarantee that all work performed will be free from defects in workmanship and materials and that all installation and repairs will provide the required capacity and performance as specified. The Contractor shall correct any defects within twenty-four (24) hours of notification at no cost to the Government.
All work shall be done in accordance with VA, NFPA, Life Safety, OSHA regulations, and manufacturer specifications. The Contractor shall be responsible for cleanup, debris removal, and recycling in accordance with VA Directive 0063, which requires that at least 50% of construction waste be prevented or recycled. The Contractor shall provide and maintain a clean, safe work area at all times.
The Contractor shall comply with all VA requirements for site supervision, ensuring that an English-speaking supervisor with a minimum of five years of experience is present during all work. The Contractor shall provide its own storage for materials, tools, and equipment, as the VA will not be responsible for loss or damage.
The Contractor shall comply with the VA Privacy and Information Security Awareness training requirements. All personnel must complete “VA Privacy Training for Personnel without Access to VA Computer Systems or Direct Access to or Use of VA Sensitive Information.” Proof of completion shall be submitted to the COR prior to commencing work and renewed annually.
All construction contractors and A/E firms performing work under this project shall utilize the VISN 2 Autodesk Build Construction Management Platform (Autodesk Construction Cloud – ACC). Access and training will be provided by the VA COR at no cost to the Contractor. The ACC platform shall be used for all official project correspondence, RFIs, submittals, schedules, testing reports, and safety documentation.
IAW VAAR 836.204 Estimated Construction Cost Range is $5,000,000-$10,000,000. The NAICS code for this procurement is 236220, Commercial and Institutional Building Construction, size standard: $45.5 million. A bid bond will be required to respond to the IFB once released.
Prospective contractors must be registered and certified online with Veteran Small Business Certification (sba.gov) and must be registered at https://www.sam.gov in accordance with 38 CFR Part 74 and VAAR 819.70 to be eligible for award. There will be a site visit held for this project, and all prospective bidders are strongly encouraged to attend. Details of the site visit will be included in the solicitation document. It is anticipated that the solicitation will be issued on/about December 19, 2025. Information for Bid details, Specifications, Drawings, and Contract Forms will be available in electronic format only at: https://www.sam.gov. All interested parties (subs & primes) should register for a user account, which lets you save searches, follow changes to opportunities, and join interested vendor lists.
To preserve the integrity of the procurement process, all questions and requests for information must be submitted in writing to Vladimir Stoyanov, Contract Specialist, via email at Vladimir.Stoyanov@va.gov.
Files
Show all 15
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Y1DA--NRM-CONST 630A4-20-412 Repair Parking Lots and Roads SA | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z1DA--NRM-CONST | 632-23-112 Replace Roofs and Repair Facades Buildings 6 and 7 | FY27 NRM | Veterans Integrated Service Network 2 | No set-aside | |
| Y1DA--replace roofs and repair facades building 6 and 7 at the northport VA medical center project number: 632-23-112 | Veterans Integrated Service Network 2 | No set-aside | |
| Building 13 Stair and Roof Replacement at Castle Point VAMC | Veterans Integrated Service Network 2 | Service-Disabled Veteran-Owned Small Business | |
| Z1DA--528A8-22-814 Consolidate Primary Care Reception | Veterans Integrated Service Network 2 | No set-aside | |
| Z1DA--528A5-27-504 Seal and Stripe Parking Lots | Veterans Integrated Service Network 2 | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity