This document is an Amendment to Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Veterans Affairs for a construction project at James J. Peters VA Medical Center in Bronx, New York. The solicitation number is 36C24226B0014, dated February 6, 2026, with an amendment issued February 27, 2026. This is a Total Service-Disabled Veteran-Owned Small Business (SDVOSB) set-aside procurement for repair of parking lots and roads, with a project period of performance (POP) of 365 calendar days. The NAICS code is 236220 with a small business size standard of $45.0 million; the magnitude of construction falls under category (h) of between $5,000,000 and $10,000,000 per VAAR 836.204. Bids must be submitted by email only to Vladimir.Stoyanov@VA.GOV no later than 12:00 PM on March 20, 2026, with public bid opening to be held remotely on March 24, 2026 at 3:00 PM. All bidders must attest to and answer all solicitation questions, acknowledge all amendments, review all attachments, and complete all required certifications.

The amendment provides responses to 24 Requests for Information (RFIs) and states that no further RFIs will be accepted. Key clarifications include: the work is primarily a retrofit of existing site lighting utilizing existing circuits with field verification required by the contractor; panelboard locations and detailed circuiting are not provided in contract documents; the contractor is responsible for construction layout and staking (professional surveyor optional); a Professional Geotechnical Engineer licensed in New York must be retained with services commensurate to construction activities (not requiring full-time presence); temporary construction fencing locations are not specified but must encompass all active work areas per Section 01 00 00; project phasing (Phases A through O) is shown on Sheets CS169-CS176 and must be followed; parking lot construction must be performed during evening and/or weekend hours per General Note 23 on Drawing GI002; full-depth pavement reconstruction requires removal of existing base materials and replacement with NYSDOT Type 2 Subbase unless the contractor certifies reused material compliance; and the specified concrete sign bases (Drawings CS-147 and CS-148) are mandatory unless an alternate design with professional engineer calculations is submitted and approved. The document also references an attached NRCS Custom Soil Resource Report and geotechnical soil testing data provided for informational purposes only.

View the file

Other files

Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODECODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 57

0001 02-27-2026 630A4-20-412

36C242

Department of Veterans Affairs Network Contracting Office 2 James J. Peters VA Medical Center 130 West Kingsbridge Road Bronx NY 10468-3904

ATTN: VLADIMIR STOYANOV

CONTRACTING OFFICER

36C242

Department of Veterans Affairs James J. Peters VA Medical Center Network Contracting Office 2 130 West Kingsbridge Road Bronx NY 10468-3904

To all Offerors/Bidders

36C24226B0014

02-06-2026

X

X X

X 1

SEE CHANGES BELLOW and ATTCHED: ALL OTHER TERM AND CONDITIONS REMAIN UNCHANGED AND THE SAME.

THIS AMENDMENT IS ISSUED TO PROVIDE ANSWERS TO THE RFIS RECEIVED - NO FURTHER RFIS WILL BE ACCEPTED BIDS MUST BE SUBMITTED BY EMAIL ONLY - Vladimir.Stoyanov@VA.GOV NOT LATER THAN 12:00PM ON 03/20/26.

PUBLIC BID OPENING WILL BE HELD REMOTELY ON 03/24/26 AT 3:00 PM.

The NAICS code for this procurement is 236220 and the size standard is $45.0 million.

Per VAAR 836.204, the magnitude of construction is (h) Between $5,000,000 and $10,000,000 This a Total Service-Disabled-Veteran-Owned- Small-Business(SDVOSB) - set aside procurement with 365 calendar days POP.

ALL BIDDERS MUST ATTEST TO AND ANSWER ALL QUESTION OF THE SOLICITATION, ACKNOWLEDGE ALL AMENDMENTS, REVIEW ALL

ATACHEMENTS, AND FILL OUT ALL CERTIFICATIONS.

VLADIMIR STOYANOV

CONTRACTING OFFICER

VA-VHA-SAOE-2014-VA15F-71403

RFI responses for project 630A4-20-412 (REPAIR PARKING LOTS AND ROADS SA)

1) Please confirm that the public bid opening date and time is March 24th, 2026, by 3:00 pm.

RESPONSE: Correct and confirmed.

2) Please confirm that bid submission can be made electronically via email.

RESPONSE: That is correct and confirmed; all bids must be submitted by 12:00 pm on 03/20/2026 via email only, no other means will be accepted.

3) Please provide the panelboard locations and panel schedules.

RESPONSE: The Contract Documents do not include panelboard locations or panel schedules for the existing site lighting circuits. The work is primarily a retrofit utilizing existing site lighting circuits. The Contractor shall field-verify the originating panelboards, circuit breakers, available capacity, and existing configuration prior to performing work. Any required modifications to existing panelboards or breakers shall be coordinated with and approved by the Contracting

Officer’s Representative (COR).

4) Please provide the circuiting for the site lighting.

RESPONSE: The drawings indicate portions of the existing site lighting circuits, including underground routing between light poles and associated handholes.

However, complete circuiting back to the originating building panels is not shown.

The work is primarily a retrofit of existing site lighting utilizing existing circuits, with selective additions and relocations as indicated on the drawings. The

Contractor shall field-verify existing site lighting circuitry, including circuit origin, capacity, and configuration, prior to performing work. The Contractor shall maintain existing circuiting unless modifications are required for the work and shall provide updated circuiting documentation (as-built) reflecting any changes made during construction. Any proposed circuit modifications or phase rebalancing shall be coordinated with and approved by the Contracting Officer’s Representative

(COR) prior to implementation.

5) Please provide the wire sizing for the circuit numbers for the site lighting.

RESPONSE: The plans do not include a circuit numbering schedule. The lighting scope is limited to replacement of existing luminaire heads and selective additions/relocations utilizing existing site lighting infrastructure, as indicated on the drawings. Where new conductors are required for extensions or relocated fixtures, conductor sizing shall be determined by the Contractor in accordance with the NEC and Division 26 requirements (including minimum conductor size) and shall be adequate for the connected load and voltage drop. The Contractor shall verify existing circuit capacity and operating conditions in the field and provide final conductor sizing and any required phase rebalancing as part of the required submittals.

6) As this is a major site work, please advise if it's the contractor’s responsibility to hire a professional land surveyor for all the layout and stakes work, and what types of surveys are required? Like topographic and utility surveys, etc. Also, how many months are required for these surveys, like preconstruction, postconstruction, etc.?

RESPONSE: The Contract Documents are based on prior survey information as noted on the drawings. No additional topographic survey of the entire site is required under this Contract. The Contractor is responsible for the construction layout, staking, and verification necessary to perform the Work in accordance with the Contract Documents. If the Contractor elects to retain a Professional Land

Surveyor for layout services, it shall be at the Contractor’s discretion. The

Contractor is responsible for verifying grades, elevations, slopes, dimensions, and tie-ins to existing conditions prior to construction. The Contract Documents do not require ongoing monthly survey services. Survey services shall be provided as necessary to support construction activities. Record documentation requirements shall be in accordance with the Contract Documents.

7) Please advise if the contractor should have a field office trailer for his project management team?

RESPONSE: The Contract Documents do not require the Contractor to provide a field office trailer. The Contractor shall comply with the Temporary Facilities requirements of Section 01 50 00. Any field office or trailer provided for the

Contractor’s use shall be at the Contractor’s discretion and shall be located only in areas approved by the Contracting Officer’s Representative (COR). The Contract

Documents do not guarantee the availability of on-site space for a trailer.

8) Spec section 01 00 00, pages 5, 6, 7, and 8 state this project has phases A to O. Please advise if this is correct and if work has to be done as per these phases? Also, provide a detailed phasing drawing showing all these phases, A to O, locations.

RESPONSE: The project phasing identified in Specification Section 01 00 00

(Phases A through O) is correct. The corresponding phasing and Maintenance &

Protection of Traffic plans are shown on Sheets CS169 through CS176. The Work shall be performed in accordance with the indicated phasing sequence to maintain access and operations at the Medical Center. Any proposed deviation from the indicated phasing or traffic control sequencing shall be submitted for review and approval by the Contracting Officer’s Representative (COR) prior to implementation.

9) Spec section 01 00 00, page 15 states the contractor to hire a professional geotechnical engineer licensed in New York. Please clarify the duties and scope of the work for this geotechnical engineer. Also, confirmed that this geotechnical engineer is part-time, and whether a once-a-month visit will be sufficient?

RESPONSE: Section 01 00 00 requires the Contractor to retain a Professional

Geotechnical Engineer licensed in the State of New York for evaluation of subsurface conditions as required by the Contract Documents. The duties of the geotechnical engineer include, but are not limited to:

Evaluation of existing subgrade conditions where poor or unsuitable soils are encountered

Evaluation and certification of reclaimed base materials proposed for reuse

Review of compaction and material suitability where required by the

Contract Documents

Providing written recommendations as necessary to support construction activities governed by the specifications and drawing notes.

The Contract Documents do not require full-time on-site presence. The level of involvement shall be commensurate with construction activities and site conditions encountered. A fixed monthly visit schedule is not prescribed. The geotechnical engineer shall provide services as necessary to fulfill the requirements of the

Contract Documents.

10) Can the agency please provide a soil report of the project area?

RESPONSE: The Owner has limited subsurface testing information available, including composite soil test results (CBR, ASTM D1883-16; Compaction, ASTM

D698-12e1; and Particle Size Analysis, ASTM D2487) and an NRCS Custom Soil

Resource Report for the project area. This information will be issued to bidders for informational purposes only. The data is based on limited sampling and does not represent a comprehensive geotechnical investigation of the entire site. Bidders remain responsible for evaluating site conditions and for performing any additional investigation deemed necessary to prepare their bid. The Contract Documents govern, and any differing subsurface conditions encountered during construction shall be addressed in accordance with the applicable Contract clauses.

11) Does the contractor have to hire and pay for the services of GPR to locate all underground utilities?

RESPONSE: The Contract Documents do not specifically require the use of Ground

Penetrating Radar (GPR). As indicated in the General Notes, Utility Notes, and

Existing Conditions Notes on the drawings, the locations and elevations of existing utilities are approximate and shall be field verified by the Contractor prior to excavation. The Contractor is responsible for protecting existing utilities and for repairing any damage resulting from construction activities. The means and methods used to verify and locate underground utilities, including the use of GPR, test pits, or other investigative methods, shall be the Contractor’s responsibility and shall be included in the Contractor’s bid.

12) Please identify on the overall layout plan or drawings the locations and route of temporary fencing.

RESPONSE: Temporary construction fencing locations and routing are not specifically shown on the drawings. In accordance with Section 01 00 00, Paragraph

1.6.H, the Contractor shall provide temporary construction fencing around active construction areas. Fencing shall encompass all active work areas, staging areas, stockpiles, and equipment storage areas associated with the work. The Contractor shall submit a proposed fencing layout for review and approval by the Contracting

Officer’s Representative (COR) prior to installation. Fencing shall be located to secure the work area while maintaining required access, egress, emergency routes, pedestrian circulation, and Medical Center operations. No separate fencing plan will be issued.

13) Drawing GI003 is the ICRA plan. As this is all exterior site work, please confirm there is no requirement for any ICRA work.

RESPONSE: Drawing GI003 provides the project ICRA matrix and procedural requirements in accordance with VA standards. Although the work is primarily exterior site construction, the Contractor shall comply with applicable ICRA requirements as determined through coordination with the COR and the facility's

Infection Control staff. At a minimum, exterior work activities shall be coordinated to control dust, debris, vibration, and potential impacts to building air intakes, entrances, and occupied areas. The Contractor shall comply with any ICRA measures required by the VA for specific phases of work.

14) Please provide the basis of design for the Passive Vehicle Barriers.

RESPONSE: The Passive Vehicle Barriers consist of cast-in-place concrete bollards as detailed on Sheet CS165, Detail 7. The basis of design is the dimensional configuration, reinforcement, embedment depth, spacing, material specifications

(including 5,000 psi reinforced concrete and concrete-filled steel pipe core), and concrete footing shown on the drawings. The bollards shall be constructed in accordance with the details provided. Any proposed deviation shall be submitted in accordance with Section 01 33 23 for review and approval.

15) As site work can be noisy work, please confirm that all the project work can be done in the regular work hours of Monday to Friday.

RESPONSE: Work hours shall be in accordance with the Contract Documents and are subject to coordination with and approval by the Contracting Officer’s

Representative (COR). As indicated on Drawing GI002, parking lot construction shall be performed during evening and/or weekend hours. Other site work activities may be performed during normal working hours (Monday through Friday);

however, all work, including but not limited to noisy operations, saw cutting, milling, paving, demolition, or compaction activities, shall be coordinated with the

COR to minimize disruption to Medical Center operations. The VA reserves the right to restrict or reschedule specific operations as necessary to accommodate facility operations. Compliance with these requirements shall be included in the

Contractor’s bid.

16) Drawing CS164 detail no.5 indicates an asphalt pavement section. Please clarify if the contractor can use the existing stone base for the asphalt pavement and for all the new concrete pavements? Or the existing stone base must be removed completely, and a new specified thickness of stone base must be poured and compacted?

RESPONSE: Detail 5 on Drawing CS164 is identified as “Proposed Full Depth

Construction.” In areas designated for full-depth reconstruction, the existing pavement section, including existing base materials, shall be removed and replaced with the section shown on the detail, including the specified thickness of NYSDOT

Type 2 Subbase compacted to the required density. The Contract Documents do not assume the suitability or required thickness of existing base materials for reuse in full-depth reconstruction areas. Reuse of existing or reclaimed base material will only be permitted if the Contractor elects to retain such material, provides evaluation and written certification by a New York State licensed Professional

Engineer demonstrating compliance with the required section thickness, material quality, and compaction criteria, and obtains written approval from the COR in accordance with the Pavement Reconstruction Notes. Absent such evaluation and written approval, the new subbase shall be provided as specified.

17) Drawings do not indicate any new work of landscaping. Please confirm there is no new work of landscaping, and if there is, then please provide a detailed drawing.

RESPONSE: The Contract Documents do not include new landscape improvements beyond restoration of areas disturbed by construction. No new planting or landscape features are included unless specifically shown on the drawings. The

Contractor shall restore all areas disturbed by construction activities, including but not limited to excavation, grading, trenching, staging, material storage, equipment access, and stockpiling operations, in accordance with Section 31 20 00 –

Earthwork, Section 32 90 00 – Planting Soils, and Section 32 92 00 – Turf and

Grasses. Restoration shall include topsoil placement, soil preparation, seeding, and related work as required by the specifications.

18) Drawings CS-147 and CS-148 indicate that a concrete base is required as detailed.

However, based on our experience, a sign of this size would typically not require that amount of concrete. Please confirm whether the specified concrete base is mandatory as shown, or if there is flexibility to adjust it to a more proportionate size?

RESPONSE: The concrete base for the signage, as detailed on Drawings CS-147 and

CS-148, represents the basis of design for the project. The foundation dimensions shown shall be used unless the Contractor elects to submit an alternate design. Any proposed modification shall be submitted in accordance with Section 10 14 00 and

Section 01 33 23 and shall include supporting structural calculations, signed and sealed by a Professional Engineer, demonstrating compliance with applicable wind loading, frost depth, soil bearing, and anchorage requirements. No deviation from the details will be permitted without written approval following review of a complete submittal. Absent an approved alternate, the concrete base as detailed is mandatory.

19) Please identify on the drawings the location of stockpiling for the excavated material.

RESPONSE: No specific stockpile locations are designated on the drawings. The

Contractor shall submit proposed stockpile locations to the Contracting Officer’s

Representative (COR) for review and approval prior to use. Stockpiles shall be located only in areas approved by the COR and shall not interfere with Medical

Center operations, access, utilities, drainage, parking, or emergency routes.

Stockpiling shall comply with Section 31 20 00 and Section 01 57 19 – Temporary

Environmental Controls. The Contract Documents do not guarantee the availability of on-site space for stockpiling. If approved areas are insufficient, the Contractor shall remove excess material from the site in accordance with the Contract

Documents.

20) Spec sec�on 01 45 00 has extensive requirements for CQC personnel. Please confirm that the contractor’s field superintendent can simultaneously perform the duties of CQC and SSHO, and the contractor doesn’t have to hire any independent part-time or full-time personnel other than the site superintendent.

RESPONSE: Section 01 45 00 establishes specific qualification, authority, and on-site presence requirements for the CQC System Manager. Section 01 35 26 establishes separate requirements for the Site Safety and Health Officer (SSHO).

The Contract Documents require that these functions be performed in full compliance with the applicable specification sections. The Superintendent may not perform the CQC System Manager duties if doing so would conflict with the independence and oversight responsibilities required under Section 01 45 00.

Any proposed dual-role assignments must strictly meet all qualification and on-site presence requirements and are subject to review and approval by the Contracting

Officer’s Representative (COR). The Contractor remains responsible for providing all personnel necessary to comply with the Contract Documents. No reduction in required staffing is authorized by this clarification.

21) Please confirm that the stripped topsoil can be reused.

RESPONSE: Stripped topsoil may be reused provided it complies with Section 31

20 00 and meets the requirements for planting soil specified in Section 32 90 00.

Existing native surface topsoil retained during excavation may be reused, subject to verification of suitability and required soil testing in accordance with Section 32 90

00. Topsoil determined to be unsuitable shall be amended or replaced as required by the Contract Documents.

22) Please confirm that the disposal of excess excavated soil can be done without testing of the soil, and if, in case, the excavated soil is found to be hazardous, then the agency can pay additional cost to remove and dispose of this hazardous soil material.

RESPONSE: The Contract Documents do not require pre-disposal testing of excess excavated soil unless specifically directed by the COR. Disposal of excess and unsuitable material shall be performed in accordance with Specification Section 31

20 00, Paragraph 3.6. If soil encountered during construction is determined by the

Contractor or COR to be contaminated, the Contractor shall segregate, stockpile, and dispose of such material in accordance with Paragraph 3.6.D and all applicable

State and Local regulations. The Contract Documents do not provide an allowance for contaminated material. Any claim for adjustment of the Contract Sum or

Contract Time shall be subject to the requirements of the applicable Contract clauses, including but not limited to the Differing Site Conditions clause.

23) General note no. 23 on drawing GI002 states parking lot construction shall be done during evening and weekend hours, during the months of April through October, with approval of the COR. Please confirm this is mandatory, as working overtime hours and weekends incur additional charges for the asphalt plant, and also the paving subcontractor will have to pay overtime to the union laborers.

RESPONSE: Parking lot construction shall be performed during evening and/or weekend hours in accordance with General Note No. 23 on Drawing GI002. Work hours shall be coordinated with and approved by the COR. Bidders are advised that compliance with this requirement shall be included in their base bid. No additional compensation will be provided for work performed outside of normal daytime hours as required by the Contract Documents.

24) Please provide details of the temporary fencing, like elevation drawing and specs.

RESPONSE: Temporary construction fencing locations and details are not shown on the drawings. Temporary fencing shall be provided in accordance with

Specification Section 01 00 00 – General Requirements, Paragraph 1.6.H, which defines the required fence type, minimum height (7 feet), gate requirements, hardware, installation criteria, and removal requirements. The Contractor shall install fencing as necessary to fully enclose all active construction areas, staging areas, material storage areas, and equipment laydown areas required to perform the Work, whether or not specifically delineated on the drawings. All costs associated with temporary construction fencing shall be included in the

Contractor’s base bid. No additional fencing details will be issued.

See attached document: S02 QUESTION 10 RESPONSE DATA.

ADDENDUM A

Site Soils Information – For Informational Purposes Only

The owner is providing the following soil information for bidder reference:

• Composite soil testing results including:

o California Bearing Ratio (CBR) – ASTM D1833-16 o Laboratory Compaction – ASTM D698-12e1 o Particle Size Analysis – ASSTM D2487

• NRCS Custom Soil Resource Report

This information is provided for informational purposes only and is not a representation or warranty of subsurface conditions across the project site. The data reflects limited sampling performed at selected locations and may not be indicative of conditions encountered in other areas of the site.

Bidders are responsible for independently evaluating subsurface conditions and for performing any additional investigation deemed necessary to prepare their bid.

The Contract Documents remain the governing requirements. No guarantee is made regarding soil uniformity, bearing capacity, groundwater conditions, or material suitability beyond the specific data presented.

Any differing subsurface conditions encountered during construction shall be addressed in accordance with the applicable Contract clauses.

Moisture Content, %

Dry Unit Weight, pcf % MDD Swell, %

Dry Unit Weight, pcf % MDD

Top 1" Moisture, %

Average Moisture, %

Penetration Surcharge, lb Bearing Ratio

9.5% 98.2 84.7% 0.0% 100.5 86.7% 16.5% 16.3% 10 4.0 9.5% 110.4 95.3% 0.0% 110.0 94.9% 13.9% 13.7% 10 33.1 9.5% 117.5 101.4% 0.0% 117.2 101.1% 12.8% 12.7% 10 48.7

32.3

D 698 Test condition: soaked

115.9 Optimum Water Content, w o : 9.5

5.9

34204.01 St. Albans VAMC - LV Consulting Acela Architects and Engineers

NR Bulk

Remarks:

ASTM D 1883-16 CBR (California Bearing Ratio) of Laboratory-Compacted Soils

Bulk 1

After SoakBefore Soak

Additional Information

October 28, 2021

CBR @ 95% MDD and 0.1 penetration:

Gray to light brown well-graded sand with silt

Compaction Test Method:

Depth:

Sample Location:

Soils Description:

Client:

Project Number:

Maximum Dry Unit Wt, γdMAX , pcf :

As-Received Water Content, %:

Sample:

Project Name:

0.000 0.050 0.100 0.150 0.200 0.250 0.300 0.350 0.400 0.450 0.500

S tr es s on P is to n, P

S I

Penetration, in

ASTM D 1883-16

CBR (California Bearing Ratio) of Laboratory-

Compacted Soils

85% MDD

95% MDD

101% MDD

CBR @

95%MDD=

32.3

95.0 105.0 115.0

C or re ct ed C

B R

Dry Unit Weight as molded, PCF

ASTM D 1883-16

CBR (California Bearing Ratio) of Laboratory-Compacted

Soils

Southern NJ 856‐768‐1001

Central PA 717‐697‐5701

Lehigh Valley 610‐967‐4540115 W Germantown Pk ꞏ Ste 200 ꞏ East Norriton, PA 19401 tel 610-277-0880 fax 610-277-0878

EARTH

ENGINEERING

INCORPORATED

Geotechnical Engineers & Geologists

EEI Project Number: 34204.01 Date: 10/18/2021

5.9%

2.65 estimated 2.65 estimated

Test:

Sieve data: 3/4 in

3.2% calculated

96.8% calculated

115 W Germantown Pk, East Norriton, PA 19401 ꞏ tel 610-277-0880 www.earthengineering.com

Organic content, %: pH:

Finer Fraction, PF:

Specific Gravity of Finer fraction:

Maximum Dry Unit Weight, Std-γdMAX :

Oversize Fraction, PC:

Sieve used to split fractions:

St. Albans VAMC - LV Consulting Acela Architects and Engineers

Project Name:

Client:

ASTM D 698 - 12e1 Laboratory Compaction Characteristics of Soil Using Standard Effort (12,400 ft-lbf/ft³ (600 kN-m/m³))

West Berlin, NJ ꞏ 856-768-1001

Geotechnical Engineers & Geologists

ENGINEERING

INCORPORATED Mechanicsburg, PA ꞏ 717-697-5701

Emmaus, PA ꞏ 610-967-4540

East Norriton, PA ꞏ 610-277-0880EARTH

Specific Gravity of Oversize fraction:

9.5%

As-Received Water Content:

Optimum Water Content, Std-w o :

ASTM ASTM D 698 - 12e1, Method C using a mechanical rammer (dry preparation).

Sample:

Soils Description: Gray to light brown well-graded sand with silt Depth/Remarks:

Bulk 1

NR

115.9 lbf/ft³

112.0

113.0

114.0

115.0

116.0

6% 8% 10% 12% 14% 16% 18%

D ry

U n it W e ig h t, D , l b f/ ft ³

Water Content, w, %

Moisture-Density ZAV line Std-γd,max at Std-w,opt Std-γd,max at Std-w,opt - Corrected

5.9 moist Odor:

% Gravel: Coarse: 3.2 Fine: 6.0 Diameter, m% Finer

% Sand: Coarse: 3.8 Medium: 38.9 Fine: 36.8 75 #N/A

38.1 100.0

19.0 96.8

9.5 94.5

4.75 90.8

2.00 87.0

0.425 48.1

0.150 15.3

0.075 11.3

0.005 NR

0.001 NR

Gs: NR Cu: 11.2 Cc: 1.4

Project: LL: NP PL: NP PI: NP

Client:

Sample:

Depth:

Description:

Remarks:

Gray to light brown well-graded sand with silt

Bulk 1

NR

Reaction to HCl:

Structure: homogeneous

AASHTO Classification:

Acela Architects and Engineers

34204.01 - St. Albans VAMC - LV Consulting

A-1-b

USCS Classification: SW-SM, well-graded sand with silt

NR

NR

Toughness:

Dry Strength:

NR

NRCementation:

Dilatency: NR firm

As-rec'd water content: NR

9.2 79.5

Consistency:

3"

№ 40

№ 4 ⅜"Sand description:

gray-brown, subangular to subrounded gray-brown, subangular to subrounded

Hardness: NR

Clay Size

№ 200 № 100

№ 10

Particle Size US Standard Sieve Size

Hydrometer Analysis Colloids

Classification of Soils, ASTM D 2487-17 / D 2488-09a October 14, 2021

Coarse

Fine

Medium

Fine

Coarse

GRAVEL

SAND

¾" 1½"Gravel description:

3" 1½" ¾" ⅜" №4 №10 №40 №100 №200

0.010.1110100

P er ce n t P as si n g

S ie ve

Sieve Opening, mm

Particle Size Analysis of Soils

Southern NJ 856‐768‐1001

Central PA 717‐697‐5701

Lehigh Valley 610‐967‐4540115 W Germantown Pk

East Norriton, PA 19401 tel 610-277-0880 fax 610-277-0878

EARTH

ENGINEERING

INCORPORATED

Geotechnical Engineers & Geologists

United States Department of Agriculture

A product of the National Cooperative Soil Survey, a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local participants

Custom Soil Resource Report for

Queens County, New York

Natural Resources Conservation Service

June 30, 2021

Preface Soil surveys contain information that affects land use planning in survey areas.

They highlight soil limitations that affect various land uses and provide information about the properties of the soils in the survey areas. Soil surveys are designed for many different users, including farmers, ranchers, foresters, agronomists, urban planners, community officials, engineers, developers, builders, and home buyers.

Also, conservationists, teachers, students, and specialists in recreation, waste disposal, and pollution control can use the surveys to help them understand, protect, or enhance the environment.

Various land use regulations of Federal, State, and local governments may impose special restrictions on land use or land treatment. Soil surveys identify soil properties that are used in making various land use or land treatment decisions.

The information is intended to help the land users identify and reduce the effects of soil limitations on various land uses. The landowner or user is responsible for identifying and complying with existing laws and regulations.

Although soil survey information can be used for general farm, local, and wider area planning, onsite investigation is needed to supplement this information in some cases. Examples include soil quality assessments (http://www.nrcs.usda.gov/wps/ portal/nrcs/main/soils/health/) and certain conservation and engineering applications. For more detailed information, contact your local USDA Service Center (https://offices.sc.egov.usda.gov/locator/app?agency=nrcs) or your NRCS State Soil Scientist (http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/?

cid=nrcs142p2_053951).

Great differences in soil properties can occur within short distances. Some soils are seasonally wet or subject to flooding. Some are too unstable to be used as a foundation for buildings or roads. Clayey or wet soils are poorly suited to use as septic tank absorption fields. A high water table makes a soil poorly suited to basements or underground installations.

The National Cooperative Soil Survey is a joint effort of the United States Department of Agriculture and other Federal agencies, State agencies including the Agricultural Experiment Stations, and local agencies. The Natural Resources Conservation Service (NRCS) has leadership for the Federal part of the National Cooperative Soil Survey.

Information about soils is updated periodically. Updated information is available through the NRCS Web Soil Survey, the site for official soil survey information.

The U.S. Department of Agriculture (USDA) prohibits discrimination in all its programs and activities on the basis of race, color, national origin, age, disability, and where applicable, sex, marital status, familial status, parental status, religion, sexual orientation, genetic information, political beliefs, reprisal, or because all or a part of an individual's income is derived from any public assistance program. (Not all prohibited bases apply to all programs.) Persons with disabilities who require http://www.nrcs.usda.gov/wps/portal/nrcs/main/soils/health/ http://www.nrcs.usda.gov/wps/portal/nrcs/main/soils/health/ https://offices.sc.egov.usda.gov/locator/app?agency=nrcs http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/?cid=nrcs142p2_053951 http://www.nrcs.usda.gov/wps/portal/nrcs/detail/soils/contactus/?cid=nrcs142p2_053951 alternative means for communication of program information (Braille, large print, audiotape, etc.) should contact USDA's TARGET Center at (202) 720-2600 (voice and TDD). To file a complaint of discrimination, write to USDA, Director, Office of Civil Rights, 1400 Independence Avenue, S.W., Washington, D.C. 20250-9410 or call (800) 795-3272 (voice) or (202) 720-6382 (TDD). USDA is an equal opportunity provider and employer.

Contents Preface How Soil Surveys Are Made Soil Map

Soil Map Legend Map Unit Legend Map Unit Descriptions

Queens County, New York BiAn—Bigapple sandy loam, 0 to 3 percent slopes, non-dredge material.. 14 BzA—Breeze loamy sand, 0 to 3 percent slopes GbA—Greenbelt loam, 0 to 3 percent slopes LaA—Laguardia artifactual coarse sandy loam, 0 to 3 percent slopes LaB—Laguardia artifactual coarse sandy loam, 3 to 8 percent slopes RvA—Riverhead loamy coarse sand, 0 to 3 percent slopes SeA—Secaucus artifactual fine sandy loam, 0 to 3 percent slopes UBAl—Urban land-Bigapple, non-dredge material complex, 0 to 3 percent slopes, low impervious surface UFA—Urban land-Flatbush complex, 0 to 3 percent slopes UFAl—Urban land-Flatbush complex, 0 to 3 percent slopes, low impervious surface UFB—Urban land-Flatbush complex, 3 to 8 percent slopes UFBl—Urban land-Flatbush complex, 3 to 8 percent slopes, low impervious surface UGDl—Urban land-Greenbelt complex, 15 to 25 percent slopes, low impervious surface UoA—Urban land, outwash substratum, 0 to 3 percent slopes

References

How Soil Surveys Are Made Soil surveys are made to provide information about the soils and miscellaneous areas in a specific area. They include a description of the soils and miscellaneous areas and their location on the landscape and tables that show soil properties and limitations affecting various uses. Soil scientists observed the steepness, length, and shape of the slopes; the general pattern of drainage; the kinds of crops and native plants; and the kinds of bedrock. They observed and described many soil profiles. A soil profile is the sequence of natural layers, or horizons, in a soil. The profile extends from the surface down into the unconsolidated material in which the soil formed or from the surface down to bedrock. The unconsolidated material is devoid of roots and other living organisms and has not been changed by other biological activity.

Currently, soils are mapped according to the boundaries of major land resource areas (MLRAs). MLRAs are geographically associated land resource units that share common characteristics related to physiography, geology, climate, water resources, soils, biological resources, and land uses (USDA, 2006). Soil survey areas typically consist of parts of one or more MLRA.

The soils and miscellaneous areas in a survey area occur in an orderly pattern that is related to the geology, landforms, relief, climate, and natural vegetation of the area. Each kind of soil and miscellaneous area is associated with a particular kind of landform or with a segment of the landform. By observing the soils and miscellaneous areas in the survey area and relating their position to specific segments of the landform, a soil scientist develops a concept, or model, of how they were formed. Thus, during mapping, this model enables the soil scientist to predict with a considerable degree of accuracy the kind of soil or miscellaneous area at a specific location on the landscape.

Commonly, individual soils on the landscape merge into one another as their characteristics gradually change. To construct an accurate soil map, however, soil scientists must determine the boundaries between the soils. They can observe only a limited number of soil profiles. Nevertheless, these observations, supplemented by an understanding of the soil-vegetation-landscape relationship, are sufficient to verify predictions of the kinds of soil in an area and to determine the boundaries.

Soil scientists recorded the characteristics of the soil profiles that they studied. They noted soil color, texture, size and shape of soil aggregates, kind and amount of rock fragments, distribution of plant roots, reaction, and other features that enable them to identify soils. After describing the soils in the survey area and determining their properties, the soil scientists assigned the soils to taxonomic classes (units).

Taxonomic classes are concepts. Each taxonomic class has a set of soil characteristics with precisely defined limits. The classes are used as a basis for comparison to classify soils systematically. Soil taxonomy, the system of taxonomic classification used in the United States, is based mainly on the kind and character of soil properties and the arrangement of horizons within the profile. After the soil scientists classified and named the soils in the survey area, they compared the individual soils with similar soils in the same taxonomic class in other areas so that they could confirm data and assemble additional data based on experience and research.

The objective of soil mapping is not to delineate pure map unit components; the objective is to separate the landscape into landforms or landform segments that have similar use and management requirements. Each map unit is defined by a unique combination of soil components and/or miscellaneous areas in predictable proportions. Some components may be highly contrasting to the other components of the map unit. The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The delineation of such landforms and landform segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, onsite investigation is needed to define and locate the soils and miscellaneous areas.

Soil scientists make many field observations in the process of producing a soil map.

The frequency of observation is dependent upon several factors, including scale of mapping, intensity of mapping, design of map units, complexity of the landscape, and experience of the soil scientist. Observations are made to test and refine the soil-landscape model and predictions and to verify the classification of the soils at specific locations. Once the soil-landscape model is refined, a significantly smaller number of measurements of individual soil properties are made and recorded.

These measurements may include field measurements, such as those for color, depth to bedrock, and texture, and laboratory measurements, such as those for content of sand, silt, clay, salt, and other components. Properties of each soil typically vary from one point to another across the landscape.

Observations for map unit components are aggregated to develop ranges of characteristics for the components. The aggregated values are presented. Direct measurements do not exist for every property presented for every map unit component. Values for some properties are estimated from combinations of other properties.

While a soil survey is in progress, samples of some of the soils in the area generally are collected for laboratory analyses and for engineering tests. Soil scientists interpret the data from these analyses and tests as well as the field-observed characteristics and the soil properties to determine the expected behavior of the soils under different uses. Interpretations for all of the soils are field tested through observation of the soils in different uses and under different levels of management.

Some interpretations are modified to fit local conditions, and some new interpretations are developed to meet local needs. Data are assembled from other sources, such as research information, production records, and field experience of specialists. For example, data on crop yields under defined levels of management are assembled from farm records and from field or plot experiments on the same kinds of soil.

Predictions about soil behavior are based not only on soil properties but also on such variables as climate and biological activity. Soil conditions are predictable over long periods of time, but they are not predictable from year to year. For example, soil scientists can predict with a fairly high degree of accuracy that a given soil will have a high water table within certain depths in most years, but they cannot predict that a high water table will always be at a specific level in the soil on a specific date.

After soil scientists located and identified the significant natural bodies of soil in the survey area, they drew the boundaries of these bodies on aerial photographs and

Custom Soil Resource Report identified each as a specific map unit. Aerial photographs show trees, buildings, fields, roads, and rivers, all of which help in locating boundaries accurately.

Soil Map The soil map section includes the soil map for the defined area of interest, a list of soil map units on the map and extent of each map unit, and cartographic symbols displayed on the map. Also presented are various metadata about data used to produce the map, and a description of each soil map unit.

Soil Map

603200 603300 603400 603500 603600 603700 603800 603900 604000 604100 604200 604300 604400 604500 604600 604700

603200 603300 603400 603500 603600 603700 603800 603900 604000 604100 604200 604300 604400 604500 604600 604700

40° 41' 37'' N

6'

4' ' W

40° 41' 37'' N

5'

8' ' W

40° 41' 5'' N

6'

4' ' W

40° 41' 5'' N

5'

8' ' W

N

Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: UTM Zone 18N WGS84 0 300 600 1200 1800

Feet 0 100 200 400 600

Meters Map Scale: 1:7,100 if printed on A landscape (11" x 8.5") sheet.

MAP LEGEND MAP INFORMATION

Area of Interest (AOI) Area of Interest (AOI)

Soils Soil Map Unit Polygons

Soil Map Unit Lines

Soil Map Unit Points

Special Point Features Blowout

Borrow Pit

Clay Spot

Closed Depression

Gravel Pit

Gravelly Spot

Landfill

Lava Flow

Marsh or swamp

Mine or Quarry

Miscellaneous Water

Perennial Water

Rock Outcrop

Saline Spot

Sandy Spot

Severely Eroded Spot

Sinkhole

Slide or Slip

Sodic Spot

Spoil Area

Stony Spot

Very Stony Spot

Wet Spot

Other

Special Line Features

Water Features Streams and Canals

Transportation Rails

Interstate Highways

US Routes

Major Roads

Local Roads

Background Aerial Photography

The soil surveys that comprise your AOI were mapped at 1:12,000.

Please rely on the bar scale on each map sheet for map measurements.

Source of Map: Natural Resources Conservation Service Web Soil Survey URL:

Coordinate System: Web Mercator (EPSG:3857)

Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required.

This product is generated from the USDA-NRCS certified data as of the version date(s) listed below.

Soil Survey Area: Queens County, New York Survey Area Data: Version 10, Jun 11, 2020

Soil map units are labeled (as space allows) for map scales 1:50,000 or larger.

Date(s) aerial images were photographed: Jul 23, 2014—Aug 15, 2014

The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident.

Map Unit Legend

Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI

BiAn Bigapple sandy loam, 0 to 3 percent slopes, non-dredge material

29.1 12.5%

BzA Breeze loamy sand, 0 to 3 percent slopes

10.3 4.4%

GbA Greenbelt loam, 0 to 3 percent slopes

0.0 0.0%

LaA Laguardia artifactual coarse sandy loam, 0 to 3 percent slopes

3.9 1.7%

LaB Laguardia artifactual coarse sandy loam, 3 to 8 percent slopes

12.6 5.4%

RvA Riverhead loamy coarse sand, 0 to 3 percent slopes

2.2 0.9%

SeA Secaucus artifactual fine sandy loam, 0 to 3 percent slopes

2.4 1.0%

UBAl Urban land-Bigapple, non-dredge material complex, 0 to 3 percent slopes, low impervious surface

7.0 3.0%

UFA Urban land-Flatbush complex, 0 to 3 percent slopes

99.7 42.8%

UFAl Urban land-Flatbush complex, 0 to 3 percent slopes, low impervious surface

6.9 3.0%

UFB Urban land-Flatbush complex, 3 to 8 percent slopes

17.5 7.5%

UFBl Urban land-Flatbush complex, 3 to 8 percent slopes, low impervious surface

19.8 8.5%

UGDl Urban land-Greenbelt complex, 15 to 25 percent slopes, low impervious surface

7.0 3.0%

UoA Urban land, outwash substratum, 0 to 3 percent slopes

14.7 6.3%

Totals for Area of Interest 233.2 100.0%

Map Unit Descriptions The map units delineated on the detailed soil maps in a soil survey represent the soils or miscellaneous areas in the survey area. The map unit descriptions, along with the maps, can be used to determine the composition and properties of a unit.

A map unit delineation on a soil map represents an area dominated by one or more major kinds of soil or miscellaneous areas. A map unit is identified and named according to the taxonomic classification of the dominant soils. Within a taxonomic class there are precisely defined limits for the properties of the soils. On the landscape, however, the soils are natural phenomena, and they have the characteristic variability of all natural phenomena. Thus, the range of some observed properties may extend beyond the limits defined for a taxonomic class.

Areas of soils of a single taxonomic class rarely, if ever, can be mapped without including areas of other taxonomic classes. Consequently, every map unit is made up of the soils or miscellaneous areas for which it is named and some minor components that belong to taxonomic classes other than those of the major soils.

Most minor soils have properties similar to those of the dominant soil or soils in the map unit, and thus they do not affect use and management. These are called noncontrasting, or similar, components. They may or may not be mentioned in a particular map unit description. Other minor components, however, have properties and behavioral characteristics divergent enough to affect use or to require different management. These are called contrasting, or dissimilar, components. They generally are in small areas and could not be mapped separately because of the scale used. Some small areas of strongly contrasting soils or miscellaneous areas are identified by a special symbol on the maps. If included in the database for a given area, the contrasting minor components are identified in the map unit descriptions along with some characteristics of each. A few areas of minor components may not have been observed, and consequently they are not mentioned in the descriptions, especially where the pattern was so complex that it was impractical to make enough observations to identify all the soils and miscellaneous areas on the landscape.

The presence of minor components in a map unit in no way diminishes the usefulness or accuracy of the data. The objective of mapping is not to delineate pure taxonomic classes but rather to separate the landscape into landforms or landform segments that have similar use and management requirements. The delineation of such segments on the map provides sufficient information for the development of resource plans. If intensive use of small areas is planned, however, onsite investigation is needed to define and locate the soils and miscellaneous areas.

An identifying symbol precedes the map unit name in the map unit descriptions.

Each description includes general facts about the unit and gives important soil properties and qualities.

Soils that have profiles that are almost alike make up a soil series. Except for differences in texture of the surface layer, all the soils of a series have major horizons that are similar in composition, thickness, and arrangement.

Soils of one series can differ in texture of the surface layer, slope, stoniness, salinity, degree of erosion, and other characteristics that affect their use. On the basis of such differences, a soil series is divided into soil phases. Most of the areas shown on the detailed soil maps are phases of soil series. The name of a soil phase commonly indicates a feature that affects use or management. For example, Alpha silt loam, 0 to 2 percent slopes, is a phase of the Alpha series.

Some map units are made up of two or more major soils or miscellaneous areas.

These map units are complexes, associations, or undifferentiated groups.

A complex consists of two or more soils or miscellaneous areas in such an intricate pattern or in such small areas that they cannot be shown separately on the maps.

The pattern and proportion of the soils or miscellaneous areas are somewhat similar in all areas. Alpha-Beta complex, 0 to 6 percent slopes, is an example.

An association is made up of two or more geographically associated soils or miscellaneous areas that are shown as one…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .