Y1DA--EHRM Infrastructure Upgrades Data Center Construction - St. Louis JB - Project 657-21-709JB
Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest special notice from .
- Solicitation number
- 36C77625B0008
- Agency
-
VA Technology Acquisition Center
Headquarters, Department of Veterans Affairs
- Responses due
- Not on record
- Set-aside
- Service-Disabled Veteran-Owned Small Business
Opportunity facts
- NAICS code
- 236220 Commercial and Institutional Building Construction
- Place of performance
- St. Louis (Jefferson Barracks) VA Medical Center St. Louis, MO 63125, United States
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of Veterans Affairs (VA), Veterans Health Administration (VHA) is seeking a general contractor to perform EHRM Infrastructure Upgrades Data Center Construction at the St. Louis VA Medical Center located in Jefferson Barracks. The project involves constructing a new data center in the basement of Building 56, which will replace the existing data center in Building 1. The scope includes comprehensive infrastructure improvements such as electrical work, power systems, lighting, UPS installation, building management system interfaces, HVAC assessment, new space construction, fire suppression systems, communication infrastructure, physical security, and fiber connectivity. The solicitation will be issued as an Invitation for Bid (IFB) in March 2025 and will be evaluated according to procedures outlined in the full solicitation document. All questions regarding the project must be submitted in writing via email to thomas.council@va.gov, with telephone inquiries explicitly prohibited.
The contract is designated exclusively for Service-Disabled Veteran-Owned Small Business (SDVOSB) firms, with offers from other business types being ineligible for consideration. The project falls under NAICS code 236220 with a size standard of $45 million, and the estimated construction magnitude ranges between $5-10 million. The total period of performance is approximately 240 calendar days from the issuance of the Notice to Proceed. Prospective contractors must be prepared to provide all necessary labor, tools, materials, equipment, and supervision to complete the data center relocation and infrastructure upgrade project. The solicitation will be conducted in accordance with Federal Acquisition Regulation (FAR) Part 14, and the work will be performed at 1 Jefferson Barracks Dr., St. Louis, MO 63125.
Notice text
Page 1 of 1
INTRODUCTION:
The Department of Veterans Affairs (VA), Veterans Health Administration (VHA), Program Contracting Activity Central (PCAC) anticipates soliciting bids and subsequently awarding a single Firm-Fixed-Price contract for the Design-Bid-Build EHRM Infrastructure Upgrades Data Center Construction project at the St. Louis VA Medical Center (VAMC) located at 1 Jefferson Barracks Dr., St. Louis, MO 63125.
PROJECT DESCRIPTION:
The St. Louis (Jefferson Barracks) VAMC is seeking a general contractor to furnish all labor, tools, materials, equipment, and supervision to construct a new EHRM Data Center in the Basement of Bldg. 56. The current data center in Bldg. 1 will be relocated to Bldg. 56. The scope of this project includes but not limited to the following infrastructure improvements: Electrical (power (normal, emergency), lighting), Bonding, UPS, Building Management System interfaces, assess for new HVAC, new space construction (walls, doors, finishes), fire suppression system, communication infrastructure (new Data outlets, patch panels, Cat 6A cable), physical security, fiber infrastructure backbone connectivity to MDA.
ADMINISTRATIVE:
The solicitation will be issued as a Invitation for Bid (IFB) conducted in accordance with FAR Part 14 and will be evaluated in accordance with the procedures listed in the solicitation. The solicitation will be advertised as a total Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside. Offers received from other than SDVOSB concerns will not be considered. The applicable North American Industry Classification System (NAICS) code is 236220 with a size standard of $45 million. The solicitation will be issued in March of 2025. The period of performance is approximately 240 calendar days from the issuance of the Notice to Proceed. In accordance with VAAR 836.204, the magnitude of construction is between $5,000,000 and $10,000,000. This notice is not a request for competitive offers. All questions must be submitted in writing to the issuing office via email to: thomas.council@va.gov. Telephone calls will not be accepted.
Files
| File | Type | Posted |
|---|---|---|
| 36C77625B0008.docx | DOCX document |
Notice history
| Notice | Type | Posted |
|---|---|---|
| Y1DA--EHRM Infrastructure Upgrades Data Center Construction - St. Louis JB - Project 657-21-709JB | Award Notice | |
| Y1DA--EHRM Infrastructure Upgrades Data Center Construction - St. Louis JB - Project 657-21-709JB | Special Notice | |
| Y1DA--EHRM Infrastructure Upgrades Data Center Construction - St. Louis JB - Project 657-21-709JB | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Z2DA--FY27 EHRM | 657-21-702JC EHRM Training And Administrative Space Construction - St Louis John Cochran | VA Technology Acquisition Center | Service-Disabled Veteran-Owned Small Business | |
| 540-22-700 | EHRM Infrastructure Upgrades Construction | Clarksburg WV | VA Technology Acquisition Center | Service-Disabled Veteran-Owned Small Business | |
| Veterans Affairs St. Louis Health Care System (VASTLHCS) John Cochran (JC) Hospital in St. Louis, Missouri | ENDIST Kansas City | No set-aside | |
| Z2DA--657-24-102JC - Prepare Site for New PET/CT, Room A011D | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business | |
| Z2DA--657-27-103JB, FCA Replace Building 51 Roof, JB | Veterans Integrated Service Network 15 | Service-Disabled Veteran-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity