About this opportunity

The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 seeks installation of conduit and Category 6E cabling infrastructure for 39 WiFi access point locations at Central Virginia VA Health Care System in Richmond and Fort Harrison, Virginia, with quotations due May 18, 2026, by 4:00 PM ET. This procurement is an SDVOSB set-aside under Simplified Acquisition Procedures (FAR Part 13).

Place of performance includes Building 500 (basement through 5th floor across sections A–E), Building 507, HAS Trailers T516 A–F, Telehealth Trailers T517 A–G, and Fort Harrison National Cemetery Administration Admin facilities. The contractor must supply all labor, materials, and supervision to install conduit and CAT6 cabling with runs not exceeding 200 feet per location, terminated but not connected to switches. Work is organized in five phases across a 120-calendar-day performance period from notice to proceed, with the majority of work required after 1500 hours daily or weekends due to patient care impacts. A mandatory site visit occurred April 29, 2026, at Central Virginia VA Health Care System.

The NAICS code is 238210 (Electrical Contractors). The estimated construction cost ranges from $100,000 to $250,000. Offerors must be SDVOSB-certified with the SBA at time of offer and award, demonstrate no more than three serious OSHA or EPA violations in the past three years, and maintain an Experience Modification Rate of 1.0 or less. The contract imposes a 75 percent limitation on subcontracting to non-SDVOSB firms for special trade construction, excluding material costs. Quotations must include detailed pricing breakdowns for labor, materials, equipment, overhead, and profit on SF 1442, along with completed VAAR 852.219-75 Limitations on Subcontracting certification. Compliance with Davis-Bacon Act prevailing wage rates, OSHA 30-hour certification for superintendents, Infection Control Risk Assessment protocols, and VA Master Construction Specifications is required. Written questions were due May 4, 2026. Amendment 0003 issued May 12, 2026, provides revised statements of work and architectural drawings clarifying access point locations and implements FAR clause 52.222-90 addressing DEI discrimination compliance.

Notice text

4 versions

Update #4 · Latest ·

04/29/2026 Site Visit Attendance and Photos

52.222-90Â ADDRESSING DEI DISCRIMINATION BY FEDERAL CONTRACTORS (APR 2026) (DEVIATION)

(a)Â Definitions. As used in this clause

Program participation means membership or participation in, or access or admission to: training, mentoring, or leadership development programs; educational opportunities; clubs; associations; or similar opportunities that are sponsored or established by the contractor or subcontractor.

Racially discriminatory diversity, equity, and inclusion (DEI) activities means disparate treatment based on race or ethnicity in the recruitment, employment (e.g., hiring, promotions), contracting (e.g., vendor agreements), program participation, or allocation or deployment of an entity's resources.

(b)Â In connection with the performance of work under this contract, the Contractor agrees as follows:

(1)Â The Contractor will not engage in any racially discriminatory DEI activities;

(2)Â The Contractor will furnish all information and reports, including providing access to books, records, and accounts, as required by the Contracting Officer, for purposes of ascertaining compliance with this clause;

(3)Â In the event of the Contractor's or a subcontractor's noncompliance with this clause, this contract may be canceled, terminated, or suspended in whole or in part, and the Contractor or subcontractor may be declared ineligible for further Government contracts;

(4)Â The Contractor will report any subcontractor's known or reasonably knowable conduct that may violate this clause to the Contracting Officer and take any appropriate remedial actions directed by the Contracting Officer; and

(5)Â The Contractor will inform the Contracting Officer if a subcontractor sues the Contractor and the suit puts at issue, in any way, the validity of this clause.

(6)Â The Contractor recognizes that compliance with the requirements of this clause are material to the Government's payment decisions for purposes of 31 U.S.C. 3729(b)(4).

(c)Â The Contractor must include the substance of this clause, including this paragraph (c), in subcontracts at any tier, including those for commercial products and commercial services, except those where the place of delivery or performance is outside the United States.

(End of clause)

RFI s

Please confirm that the roles of Superintendent and SSHO must be two different individuals.

VA Response: As per 01 35 26 1.9 C of the specifications, the SSHO has [to] be a separate qualified individual from the Prime Contractor s Superintendent and/or Quality Control Manager with duties only as the SSHO.

Is this project an RFP or an IFB?

VA Response: Neither. This is a Request for Quote (RFQ) under FAR Part 13.

Is Submittal Exchange a requirement for this project?

VA Response: Submittals are to be submitted in accordance with section 01 33 24 1.6 SUBMITTAL FORMAT AND TRANSMISSION of the specifications. Submit electronic submittal documents to the COR and cc both the Contracting Officer and Contract Specialist. Email addresses will be provided during the kick-off meeting.

Page 5 of the Solicitation states Exclusions must be clearly stated on the quote . Isn t it against FAR to put exclusions on a bid form? Please confirm if exclusions are permitted and how evaluations between quotes can be performed if some firms provide different exclusions.

VA Response: This is a Request for Quote (RFQ) under FAR Part 13, not an IFB. There is no bid form.

In areas that conduit cannot be placed behind the wall, is surface mounted conduit acceptable?

VA Response: Surface mounted hardware is not the VA standard but may be approved (such as the mall area AP sites) in writing only by the COR when this occurs on a case by case basis.

Are the CAT6 cables to be terminated using CAST6 or RJ-45 s?

VA Response: RJ-45 only.

Where there are hard ceilings, is an outlet box required where the AP device will be installed?

VA Response: No the AP site brackets mount to the existing ceilings or walls, cat6 cables are to be punched through (3-4 inches exposed for connection) and penetration cleanly sealed to prevent space contamination.

Is the VA providing and installing the actual AP devices?

VA Response: Connection to network and AP install is to be accomplished after this AP Site prep project is completed, the VA will handle who accomplishes this.

In the Scope of Work under 507E, 516, and 517 trailers, it states to install watertight ARMORED conduit . Do these locations require armored CAT6 cabling?

VA Response: IAW scope, the conduit is intended to have resistance to water and impact, the cabling can be armored as listed in materials to be provided as required.

The SOW shows to install conduit and cable for 39 WiFi locations, however, the WiFi upgrades Phase 2 sheet shows 29 locations in B500, 1 in B507, 13 in the trailers and 1 in Southpoint, which totals 44. Please advise as to which is correct.

VA Response: Only the 39 listed locations in the SOW are correct.

Is AP17 at Southpoint part of this install?

VA Response: No, Only the 39 listed locations in the SOW are correct.

Where there are multiple AP locations in close proximity, are we allowed to run a larger conduit as the trunk and then run ¾ conduit to the actual locations to save space?

VA Response: Pathways are to be approved on a case by case basis if other than listed, typically multiple cat 6 cables can be pulled in a single conduit, in a tray or larger conduit.

Will ICRA be required and if so, to what extent?

VA Response: An ICRA is always required for work in patient areas that may cause dust/penetrations as this is a hospital the level of ICRA may vary from 1-4 dependent on location and services impacted.

The Solicitation mentions Fort Harrison. Please confirm Fort Harrison is not a part of this project.

VA Response: It is not, Only the 39 listed locations in the SOW are correct.

The Solicitation lists the project number being both 652-22-701 and 652-22-704. So that the quote is correct, which project number should we use?

VA Response: 652-22-701.

How can AP sites in store area (34, 65, 66, 68) be connected to the closet in their check out area? VA Response: Surface mounted white cable molds to match existing and approved through submittal process may be used in this instance due to no interstitial space for pathway.

What do we do with unused conduit, cabling that is on the materials list?

VA Response: Once completed, all unused materials are to be inventoried and turned over to the VA.

Do all of the materials on the SOW required list have to be delivered and inventoried all at once before construction?

VA Response: Not necessarily, it is up to the contractor but expected receipt should match billing line items, or at least by percentages received.

Which Cat 6 cabling is preferred for installation at the VA?

VA Response: Cat 6E.

Second floor AP 66 appears to be already completed, what is the expected location for this AP if it already completed or will it descoped?

VA Response: Second floor AP 66 is to be located on the Hard ceiling portion of the construction area in 2A as shown in provided clarification pdf drawings with these RFI s.

Are all AP sites in building 500 hard ceiling installations?

VA Response: No, but a majority of them are.

For in ground installation are there any extra services required to complete?

VA Response: Yes, professional marking servies required (Such as Accumark) before any digging is permitted, and Identification tape must be used for all in ground installations on the VA campus.

How exact are the stickers in relation to final placement of AP sites?

VA Response: Stickers considered accurate but may be adjusted due to conditions- any change to the placement from where they are indicated will be approved by COR in writing.

Superintendent Requirement- Please confirm whether the project Superintendent is required to be a direct employee of the Prime Contractor, or if a qualified subcontractor employee may fulfill this role.

VA Response: Subcontractor employee may fulfill this role. The Contractor shall furnish in writing the name and contact information of the Project Superintendent who has authority to act on behalf of the Contractor.

Combined Roles (Superintendent / SSHO / QCM)- Please confirm if one individual may serve in multiple roles (Superintendent, SSHO, and/or QCM), provided all qualification and certification requirements are met.

VA Response: As per 01 35 26 1.9 C of the specifications, the SSHO has [to] be a separate qualified individual from the Prime Contractor s Superintendent and/or Quality Control Manager with duties only as the SSHO.

As per 01 45 00 2.4 C of the specifications, [the] CQC System Manager but may also have duties as project superintendent in addition to quality control.

Competent Person Designation- Can the Superintendent also serve as the OSHA Competent Person for this project if properly qualified?

VA Response: The Contractor s Superintendent shall be OSHA-30 certified.

Badging and Access- Are there any citizenship or badging requirements for workers accessing the facility? U.S. citizenship or lawful permanent residency?

VA Response: Contractors are required to verify employment eligibility of all employees assigned to the contract in accordance with FAR 52.222-54 Employment Eligibility Verification, incorporated by reference on page 25. Employees will also require badges in accordance with the facility s security requirements.

Refine Scope- Are you removing the three Aps for Ft. Harrison from this bid as mentioned on the walkthrough?

VA Response: Only the 39 listed locations in the SOW are correct.

CAT 6/Conduit- Do we need to run the category 6 cable in conduit in the lower level (basement) or can it be run in the existing cable tray?

VA Response: A lot of cables seem to be in cable trays already. Cable tray usage can approved in writing on a case by case basis, though this does alleviate the requirement to provide the conduit as listed in the contract.

AP45- Do we need to put the cable for AP45 on Richmond Building 500 - Floor 1 Section D HD/LBS in conduit?

VA Response: The security camera looks to be free-ran already. This is typically not an issue as existing conduit may be used on a case by case basis but must be approved by COR.

Floor Plans- Will you be updating the plans for the change in placement for AP 66, 68, and 35 on the Richmond Building 500 - Floor 1 Section C HD/LBS diagram since those will be moved?

VA Response: A new PDF drawing will be provided showing the updated locations for these sites.

Data Drop- AP12 on Richmond Building 500 - Floor 1 Section C HD/LBS has an existing angle bracket and data drop. Will this data drop still be replaced and at the same location as the existing data drop?

VA Response: This is typically approved but existing conduit and pathways can used with COR approval on a case by case basis.

Accessibility- Does interstitial space exist for floors 1,2,4, and 5 for conduit to be run in?

VA Response: Yes, most spaces in building 500 have some sort of interstitial except in rare occurrences (such as the Lower level or Canteen areas).

Data Drops- Are there any data drop runs that do not require conduit?

VA Response: All data cables must be in a conduit or approved tray/raceway, but armored cabling as listed in the materials to be provided in place of conduit may be approved in writing by the COR.

Conduit- Could sleeves be put in from IT rooms into the drop ceiling space and free run the data drop to the AP location in lieu of conduit?

VA Response: No, all data cables must be in an approved conduit or tray/raceway, unless armored cabling is approved for use.

ICRA Requirements- Do all areas require ICRA standards and HEPA filtration units? If no, which areas require it? If yes, can we utilize the units that the hospital already has on-site?

VA Response: Typically the sites should not require HEPA units but in specific cases such as the OR it is a possible requirement that may include a filtered vacuum for drilling, if containment units are provided by contractor- ICRA requirements are dependent on the areas that they are installed, Contractor must provide HEPA units as required for ICRA compliance.

Armored CAT 6 Cable-The SOW calls for armored CAT6 cable to be used at the outside trailer locations (507E, 516, and 517) and installed in conduit. Is the conduit necessary if we utilize the armored CAT6 cable?

VA Response: The scope of work calls for watertight armored conduit- acceptable materials that are within the Means and methods can approved through submittals if they meet contract and material (moisture and impact resistant) requirements.

Conduit Runs- There seems to be above ground conduits ran between the HAS Trailers T516 already. The SOW calls for digging and trenching the conduit runs at this location. Do the new conduits need to be run underground, or can they be placed above ground like the existing conduits are?

VA Response: On ground conduit runs are not approved, the conduit runs need to be run underground below the frost layer (18 ) in accordance with the Scope of work. An excavation permit is required from Safety Department.

Digging and Trenching- There are conduits running between each trailer at Telehealth Trailers T517 underneath the wooden decking. Can the new conduits be run and attached to the underside of the decking as well, or do we follow the digging and trenching per the SOW?

VA Response: The expected route is in ground but if material approved is specifically weather and impact resistant with a route and suspension under the deck between the trailers- this means and methods can be approved by the COR.

Would the VA consider removing the SDVOSB set aside requirements for the solicitation (including the pay percentage restrictions)?

VA Response: No, SDVOSB will remain the set-aside.

Alternatively, if the prime SDVOSB set aside is kept, would the VA consider removing the additional small business requirements for the sub consulting described in 4.2Â 52.219-14 LIMITATIONS ON SUBCONTRACTING on page 26 of the solicitation (including the pay percentage restrictions)?

VA Response: SDVOSB set aside remains.

Lastly, would the VA remove the requirements for the Davis-Bacon Act and any other mentions of certified payroll?

VA Response: Davis-Bacon Act remains in place; this is a construction related solicitation.

END OF AMENDMENT 36C24626Q0469 0003

Update #3 ·

VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION) (a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that (1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows: (i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6. (ii) [] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (iii) [X] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted. (2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution. (3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following: (i) Referral to the VA Suspension and Debarment Committee; (ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and (iii) Prosecution for violating 18 U.S.C. 1001. (b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed. (c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate. (d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award. Certification: I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror]. Printed Name of Signee:________________________________________ Printed Title of Signee:_________________________________________ Signature:___________________________________________________ Date:_____________________ Company Name and Address:______________________________________ ________________________________________________________________ (End of clause)

Update #2 ·

VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING CERTIFICATE OF COMPLIANCE FOR SERVICES AND CONSTRUCTION (JAN 2023) (DEVIATION)

(a) Pursuant to 38 U.S.C. 8127(l)(2), the offeror certifies that

(1) If awarded a contract (see FAR 2.101 definition), it will comply with the limitations on subcontracting requirement as provided in the solicitation and the resultant contract, as follows:

(i) [] Services. In the case of a contract for services (except construction), the contractor will not pay more than 50% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 50% subcontract amount that cannot be exceeded. Other direct costs may be excluded to the extent they are not the principal purpose of the acquisition and small business concerns do not provide the service as set forth in 13 CFR 125.6.

(ii) [] General construction. In the case of a contract for general construction, the contractor will not pay more than 85% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 85% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(iii) [X] Special trade construction contractors. In the case of a contract for special trade contractors, the contractor will not pay more than 75% of the amount paid by the government to it to firms that are not certified SDVOSBs listed in the SBA certification database as set forth in 852.219 73 or certified VOSBs listed in the SBA certification database as set forth in 852.219 74. Any work that a similarly situated certified SDVOSB/VOSB subcontractor further subcontracts will count towards the 75% subcontract amount that cannot be exceeded. Cost of materials are excluded and not considered to be subcontracted.

(2) The offeror acknowledges that this certification concerns a matter within the jurisdiction of an Agency of the United States. The offeror further acknowledges that this certification is subject to Title 18, United States Code, Section 1001, and, as such, a false, fictitious, or fraudulent certification may render the offeror subject to criminal, civil, or administrative penalties, including prosecution.

(3) If VA determines that an SDVOSB/ VOSB awarded a contract pursuant to 38 U.S.C. 8127 did not act in good faith, such SDVOSB/VOSB shall be subject to any or all of the following:

(i) Referral to the VA Suspension and Debarment Committee;

(ii) A fine under section 16(g)(1) of the Small Business Act (15 U.S.C. 645(g)(1)); and

(iii) Prosecution for violating 18 U.S.C. 1001.

(b) The offeror represents and understands that by submission of its offer and award of a contract it may be required to provide copies of documents or records to VA that VA may review to determine whether the offeror complied with the limitations on subcontracting requirement specified in the contract. Contracting officers may, at their discretion, require the contractor to demonstrate its compliance with the limitations on subcontracting at any time during performance and upon completion of a contract if the information regarding such compliance is not already available to the contracting officer. Evidence of compliance includes, but is not limited to, invoices, copies of subcontracts, or a list of the value of tasks performed.

(c) The offeror further agrees to cooperate fully and make available any documents or records as may be required to enable VA to determine compliance with the limitations on subcontracting requirement. The offeror understands that failure to provide documents as requested by VA may result in remedial action as the Government deems appropriate.

(d) Offeror completed certification/fill-in required. The formal certification must be completed, signed and returned with the offeror s bid, quotation, or proposal. The Government will not consider offers for award from offerors that do not provide the certification, and all such responses will be deemed ineligible for evaluation and award.

Certification:

I hereby certify that if awarded the contract, [insert name of offeror] will comply with the limitations on subcontracting specified in this clause and in the resultant contract. I further certify that I am authorized to execute this certification on behalf of [insert name of offeror].

Printed Name of Signee:________________________________________

Printed Title of Signee:_________________________________________

Signature:___________________________________________________

Date:_____________________

Company Name and Address:______________________________________

________________________________________________________________

(End of clause)

Update #1 ·

INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO OFFEROR

EVALUATION SIMPLIFIED ACQUISITION PROCEDURES FAR PART 13

2.1 EVALUATION PROCEDURE

Subject line must include Solicitation Number, Project Title, Quoter Name.

Example, 36C24626Q0469 652-22-704 WIFI NextGen Upgrades AP Locations | Quoter Name

COMPANY INFORMATION: UIE Number, Cage Code, Tax ID Number, General Contractor s License number and State of Licensure, principle points of contact with addresses, phone numbers and email addresses.

PRICE/COST SCHEDULE: Complete the SF 1442, Blocks 14, 15, 17, 19, 20A, 20B, and 20C to submit the Quote. All sections of the RFQ, excluding Instructions to Offerors and Evaluation Procedures Sections, constitute the model contract.

Quote with breakdown of labor, material, equipment, overhead and profit.

All contract line-item numbers in the price schedule must include a price.

The Government will evaluate quotes by adding all line-item prices - the total of all CLINS will be that sum. The Government will evaluate the price to determine whether it is considered fair and reasonable.

The Quoter shall submit the following information: (For a partnership or joint venture, the following submittal requirements are required for each Contractor who is part of the partnership or joint venture and for the entity itself. EMR shall not be submitted for subcontractors.)

OSHA or EPA Violation(s): Quoters shall provide Summary of Work-Related Injuries and Illnesses, affirming that the Quoters has no more than three serious, or one repeat, or one willful OSHA or EPA violation(s) in the past 3 years.

Experience Modification Rate (EMR): Quoters shall provide documentation to show that the Quoters has an Experience Modification Rate (EMR) of equal to or less than 1.0.

Submit completed certificate VAAR 852.219-75 VA NOTICE OF LIMITATIONS ON SUBCONTRACTING, attached to this solicitation.

EMAIL QUOTATIONS: The statement in block 13a. on page 1 of the SF1442 does not apply to this Request. Quoters shall submit their offer via email to donteana.gibbs@va.gov and aaron.holmes@va.gov by Monday, May 18, 2026, at 4:00PM ET. Only electronic offers will be accepted.

IMPORTANT: Exclusions must be clearly stated on the quote. Any questions concerning the solicitation shall be submitted by 10:00AM ET, Monday, May 4, 2026. Responses will be in posted as an amendment on Sam.gov.

BASIS FOR AWARD

The Government will evaluate the proposed quote to ensure it is fair and reasonable.

Files

File Type Posted
AP Site Location Shifts Canteen Area 1st floor 05122026.pdf PDF
AP Site Location Shifts 2nd floor 05122026.pdf PDF
Revised SOW 05122026.pdf PDF
36C24626Q0469 0003.docx DOCX document
36C24626Q0469 0002.pdf PDF
36C24626Q0469 0001.docx DOCX document
Attachment E - LOS 04202026.docx DOCX document
Attachment E - LOS.docx DOCX document
Attachment D - Wage Determination.pdf PDF
Attachment A - WIFI AP Locations List.pdf PDF
Attachment C - Combined Specifications.pdf PDF
Attachment B - VA ENT Redesign - AP Locations.pdf PDF
36C24626Q0469_1.docx DOCX document
Show all 13

Notice history

Notice Type Posted
Y1DA--652-22-704 WIFI NextGen Upgrades Award Award Notice
This notice Latest solicitation Solicitation
Y1DA--652-22-704 WIFI NextGen Upgrades Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
542-22-700 | EHRM Construct Infrastructure Upgrade | Coatesville, PA | Coatesville, Pennsylvania 19320, United States · NAICS 236220 VA Technology Acquisition Center Service-Disabled Veteran-Owned Small Business
Removal of Abandoned Telecommunications Equipment Washington, District of Columbia 20422, United States · NAICS 238210 Veterans Integrated Service Network 5 Total Small Business
Solicitation for Spokane Cabling. Combination of Firm Fixed Price and Time and Material Services Contract ( Amendment 0001 added 10/23/26) Spokane, Washington 99205, United States · NAICS 238210 Veterans Integrated Service Network 20 Service-Disabled Veteran-Owned Small Business
Loading dock concrete repairs Richmond, Virginia 23249, United States · NAICS 238110 Veterans Integrated Service Network 6 Service-Disabled Veteran-Owned Small Business
613-22-700 | EHRM Infrastructure Upgrades Construction | Martinsburg, WV West Virginia 25405, United States · NAICS 236220 VA Technology Acquisition Center No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity