WY FLAP 23-154(1), Fremont Lake Road

Award Notice Posted

Solicitation number
DTFH6814B00023
Agency
Awarded
to Hooker Creek Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6815C00036 Federal contract award
PSC
Not on record
Place of performance
Freemont Lake Pinedale, Wyoming 82941, United States

Notice details come from SAM.gov. Updated .

Notice text

2 versions

Update #2 · Latest ·

THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.

Project Details: The project includes 6.93 miles of 4R construction on the Fremont Lake Road in Sublette County, Wyoming. The project starts approximately 3 miles from the town of Pinedale, WY.


Schedule A includes construction of the road and the earthwork and aggregate base for a bike path to be constructed parallel to the roadway.  Option X contains pulverization and paving of campground spur roads at the Elkhart Trailhead. Option Y contains pulverization and paving of parking lots at the Elkhart Trailhead.



Schedule A


Includes 138,500CY of roadway excavation; 15,550 tons of aggregate base; 22,000 tons of hot asphalt concrete pavement (HACP); 1100 lf of 18' culvert; 85 feet of 66 inch elliptical culvert; 825 feet of guardrail; seeding and mulching; pavement markings; erosion control.


Option X


Includes erosion control; 4400SY of pulverization; 60 tons of roadway aggregate; 80 tons of HACP.



Option Y


Includes erosion control; 11,000SY of pulverization; 50 tons of roadway aggregate; 1800 tons of HACP




The contracting range for this project is between $5 million and $8 million.

Update #1 ·

THIS IS NOT AN INVITATION FOR BID.  PLANS AND SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.  THE TENATIVE ADVERTISEMENT DATE IS APRIL 13, 2015.  THIS PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.

Project Details: The project includes 6.93 miles of 4R construction on the Fremont Lake Road in Sublette County, Wyoming. The project starts approximately 3 miles from the town of Pinedale, WY.


Schedule A includes construction of the road and the earthwork and aggregate base for a bike path to be constructed parallel to the roadway.  Option X contains pulverization and paving of campground spur roads at the Elkhart Trailhead. Option Y contains pulverization and paving of parking lots at the Elkhart Trailhead.



Schedule A


Includes 138,500CY of roadway excavation; 15,550 tons of aggregate base; 22,000 tons of hot asphalt concrete pavement (HACP); 1100 lf of 18' culvert; 85 feet of 66 inch elliptical culvert; 825 feet of guardrail; seeding and mulching; pavement markings; erosion control.


Option X


Includes erosion control; 4400SY of pulverization; 60 tons of roadway aggregate; 80 tons of HACP.



Option Y


Includes erosion control; 11,000SY of pulverization; 50 tons of roadway aggregate; 1800 tons of HACP




The contracting range for this project is between $5 million and $8 million.

Files

File Type Posted
Tabulation_of_Bids.pdf PDF
Bid_Summary_after_HUBZone_preference.pdf PDF
Bid_Opening_Summary.pdf PDF
Q-A _5-7.pdf PDF
Q-A _4-27.pdf PDF
D_thru_T_Plan_Sheets.pdf PDF
WY_FLAP_23-154(1)_Final_Pavement_Tech_Memo_Fremont_Lake_Road.pdf PDF
C1_to_C42_Plan_Sheets.pdf PDF
Final_Hydraulics_Memorandum_Combined.pdf PDF
Skyline_Dr_Gravel_Pit_Exploration.pdf PDF
DTFH6814B00023.pdf PDF
C43_to_C84_Plan_Sheets.pdf PDF
Show all 12

Notice history

Notice Type Posted
This notice Latest Award Notice
WY FLAP 23-154(1) Fremont Lake Road - Contractor Site Visit Original Award Notice

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors