Pavement and Structure Foundation Tech Memo
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Tabulation_of_Bids.pdf | ||
| Bid_Summary_after_HUBZone_preference.pdf | ||
| Bid_Opening_Summary.pdf | ||
| Q-A _5-7.pdf | ||
| Q-A _4-27.pdf | ||
| DTFH6814B00023.pdf | ||
| Final_Hydraulics_Memorandum_Combined.pdf | ||
| Skyline_Dr_Gravel_Pit_Exploration.pdf | ||
| D_thru_T_Plan_Sheets.pdf | ||
| C1_to_C42_Plan_Sheets.pdf | ||
| C43_to_C84_Plan_Sheets.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Final
Fremont Lake Road
WY FLAP 23-154(1)
Pavement and Structure Foundation Technical Memorandum
Sublette County, Wyoming
Yeh Project No.: 213-276
July 30, 2014 Prepared for:
Atkins
Attn: Steve Sandvik, P.E.
4701 DTC Boulevard, Suite 700
Denver, Colorado 80237
Prepared by:
Yeh and Associates, Inc.
2000 Clay Street, Suite 200
Denver, Colorado 80211
Phone: 303-781-9590 Fax: 303-781-9583 i
Table of Contents
1. PURPOSE AND SCOPE OF STUDY 1
2. PROJECT LOCATION 1
3. GEOLOGICAL SETTING 1
4. SUBSURFACE INVESTIGATION 1
5. STRUCTURE FOUNDATION INFORMATION 2
6. PAVEMENT DESIGN 2
6.1 TRAFFIC LOADING 2
7. SUBGRADE STRENGTH 3
8. HACP MIX AND BINDER RECOMMENDATIONS 4
List of Figures
FIGURE 1 – LTPPBIND RECOMMENDED BINDER FOR FREMONT LAKE ROAD 5
List of Tables
TABLE 1 PAVEMENT THICKNESS
TABLE 2 TRAFFIC LOADING
TABLE 3 – DESIGN PARAMETERS
List of Appendices
APPENDIX B BORING LOCATION MAP FIELD EXPLORATION METHODS AND RESULTS
APPENDIX C BORING LOG AND SOIL TEST DATA
Fremont Lake Road WY FLAP 23-154(1) Yeh No. 213-276
1. PURPOSE AND SCOPE OF STUDY
The purpose of this investigation is to provide a geotechnical investigation to determine foundation requirements for a box culvert to replace the Surveyor Creek Bridge and to provide a geotechnical investigation to support the pavement design.
2. PROJECT LOCATION
Fremont Lake Road is located in west central Wyoming north of Pinedale in Sublette County in the Bridger-Teton National Forest. This project begins at a point 3.2 miles northeast of Pinedale and continues for 3.7 miles to Half Moon Lake Road, then continues north for 3.3 miles to the overlook past the White Pine Ski area.
3. GEOLOGICAL SETTING
This project is located south east of Fremont Lake which was formed by glacial activity. Almost all of the pavement subgrade consists of glacial till or alluvial material generated from glacial till.
4. SUBSURFACE INVESTIGATION
A total of 28 borings were drilled through the pavement at approximately 1/4 mile intervals for the length of the project. All but two of the borings were drilled to a depth of approximately 3 to
5 feet. The remaining two borings, B-6 and B- 27, were drilled to a depth of approximately 50 feet below the existing pavement surface near the abutments of the existing timber bridge over
Surveyor Creek. A boring location map is presented in Appendix A.
The subgrade soils are very consistent with most of those tested being either silty sand or silty sand with gravel. The AASHTO Classifications of the soils tested were A-2-4(0) or A-1-b(0).
The R-value in accordance with AASHTO T199 was measured on four samples from Fremont
Lake Road. The R-values were, 47, 43, 45, and 39. An R-value of 43 was used to represent the subgrade for pavement design. Boring logs and soil test data is presented in Appendix B.
Thickness measurements of hot asphalt concrete pavement (HACP) were made at each boring location. No aggregate base was observed in the subgrade immediately below the HACP.
Table 1 presents the HACP thickness for each boring.
Table 1 Pavement Thickness
Boring Number
Thickness (inches)
Boring Number
Thickness (inches)
Boring Number
Thickness (inches)
Boring Number
Thickness (inches)
B-1 5 B-8 5 B-15 5 B-22 5
B-2 5 B-9 5 B-16 5 B-23 5
B-3 4 B-10 5 B-17 5 B-24 5
B-4 5 B-11 5 B-18 5 B-25 5
B-5 5 B-12 5 B-19 5 B-26 5
B-6 5 B-13 4 B-20 5 B-27 6
B-7 5 B-14 5 B-21 5 B-28 5
Average = 4.9 inches
5. STRUCTURE FOUNDATION INFORMATION
Boring B-6 and B-27 were drilled to a depth of 50 feet near the Timber Bridge over Surveyor
Creek. Field sampling data indicate the soils vary from medium dense to very dense and the soil classifications encountered were A-1-b(0) or A-2-4(0) and the in-place densities ranged from 122 lbs/ft3 to 137 lbs/ft3 in each boring.
The seismic output from the 2009 AASHTO Guide Specifications for LRFD Seismic Bridge
Design for this area are Class D - "Stiff Soil". The output from the seismic class program is presented in Appendix C.
Based on the soils information from Borings B-6 and B-27, we believe that the box culvert planned to replace the timber bridge at this site can be constructed on properly graded and compacted native soil.
6. PAVEMENT DESIGN
6.1 Traffic Loading
Traffic volume estimates for the years 2013 and 20-year projected traffic volumes were presented in Fremont Lake scoping report completed by Atkins this spring. No breakdown of vehicle classifications were presented in that report. The daily design volume was calculated by determining the average daily volume (ADT) using the 2013 and 2033 volumes. The average daily traffic (ADT) from is 1,237 vehicles. In order to calculate 20-year equivalent single axle loads (ESAL), the percentage of vehicles in each classification presented in Table 2 was assumed. In addition to the individual classification volumes, ESAL loading factors from the
Federal Lands Project Development and Design Manual (PDDM) are also listed in Table 2.
Table 2 Traffic Loading
Vehicle Class
Vehicle Type ESAL Factor
Used % of Volume
Daily Design Volume
2 Passenger Cars 0.0004 43.8 542
3 Pick Ups 0.004 43.8 542
Campers & Trash Trucks 0.5 12.0 148
5-axle Semis 2.0 0.4 5
The resulting Design 20-Year ESAL is 378,717. Complete calculation of the design ESAL is presented in Appendix D.
7. SUBGRADE STRENGTH
Using the equations from NCHRP Study 72-6 a subgrade resilient modulus of 10,475 was calculated from the R-value of 43. This resilient modulus value was used in the AASHTO
Pavement Thickness Design Program DARWin, Version 3.1 which follows the 1993 AASHTO
Pavement Design Guide.
Based on the Skyline Road Project plans from Rio Verde, the pavement is to be widened from the existing 22 foot width to a width of 34.27 feet adding a 6 foot shoulder on one side and a
2.37 foot widening and safety edge on the other. The existing 5 inch pavement is to be pulverized or milled and then spread uniformly from its current width of 22 feet to a new width of
34.27 feet to accommodate widening. Based on the old and new pavement width, the milled pavement will be placed on a prepared subgrade at a thickness of approximately 3 inches.
Then an additional 3 inches of aggregate base course, FHWA FP-03 Grading D (ABC) will be placed on top of the compacted millings and compacted to be ready for a new HACP pavement.
Using strength coefficients from the PDDM, Table 3 lists the design parameters used to design the minimum HACP thickness.
Table 3 – Design Parameters
Design Parameter
Parameter Value
Design Parameter
Parameter Value
HACP 0.4/inch Reliability 75%
ABC 0.12/inch Initial Serviceability 4.2
Pulverized/Milled Material
0.12/inch Terminal
Serviceability 2.0
R-value 43 Overall Deviation 0.44
Resilient Modulus, psi
10,475 Resulting Structural
Number 2.05
Resulting minimum HACP Thickness = 4.0
The resulting pavement section will consist of 3 inches of pulverized material or millings, 3 inches of ABC and 4.0 inches of new HACP on a prepared subgrade using on-site material.
The output from the DARWin pavement thickness program is presented in Appendix E
8. HACP MIX AND BINDER RECOMMENDATIONS
Using the Long Term Pavement Performance program LTPPBIND, the recommended binder to provide 98% reliability against low temperature cracking and rutting for Pinedale, Wyoming is
PG 52-34. The output from that program is presented in Figure 1.
As presented in Figure 1, the recommended binder is PG 52-34. If that binder is not available, a binder meeting the requirements for PG 58-34 is also acceptable.
We recommend that the HACP mix for this project be a nominal 1/2 inch mix, Grading C or E, containing the Performance Graded Binder PG 58-34.
Figure 1 – LTPPBIND Recommended Binder for Fremont Lake Road
Appendix A
BORING LOCATION MAP
Borings spaced at approximately 1/4 mile intervals for entire project length
Boring Location Map North
Project Location
Appendix B
BORING LOGS AND SOIL TEST DATA
Date: 12/1/13Project Number: 213-276
Project: Fremont Lake Road
Legend for Symbols Used on Borehole Logs
Soil Lithology
Lab Test Abbreviations
Sample Types
YEH AND ASSOCIATES, INC.
GEOTECHNICAL ENGINEERING CONSULTANTS
Auger Cuttings Grab Sample Modified California Sampler
Standard Penetration Test
Bedrock Lithology
Asphalt USCS High Plasticity Clay
USCS Low Plasticity Sandy Clay USCS Silty Sand
USCS Poorly-graded Gravelly Sand
USCS Well-graded Sand
USCS Well-graded Gravelly Sand
USCS Well-graded Sand with Clay
USCS Well-graded Sand with Silt
MC-Moisture Content DD-Dry Density #200-Percent Passing #200 Sieve LL-Liquid Limit PL-Plastic Limit PI-Plasticity Index S-Sulfate Content Chl-Chloride Content S/C-Swell/Consolidation UCCS-Unconfined Compressive Strength Re-Resistivity PtL-Point Load Test AASHTO-AASHTO Classification USCS-USCS Classification
* Indicates that gradation analysis was performed, Atterberg limits were not performed, but the USCS classification was applied assuming non plastic characteristics
11/14
0.0 - 0.4 ft. ASPHALT 5 inches.
0.4 - 6.0 ft. silty SAND, brown, moist, medium dense.
Bottom of Hole at 6.0 ft.
MC= 10.6 %
DD= 118.8 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold, snowing
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-01 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
12/21
0.4 - 6.0 ft. silty SAND, brown to dark brown, moist, medium dense.
Bottom of Hole at 6.0 ft.
MC= 4.5 %33
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold, snowing
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-02 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
8/11
0.0 - 0.3 ft. ASPHALT 4 inches.
0.3 - 6.0 ft. silty SAND some organics (tree roots), brown-gray, moist, medium dense.
Bottom of Hole at 6.0 ft.
Fresh live tree roots in MC barrel.
MC= 13.6 %
DD= 105.6 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold, snowing
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-03 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
50/6
0.4 - 5.5 ft. silty SAND, light brown, moist, very dense.
Bottom of Hole at 5.5 ft.
MC= 7.4 %
#200= 30 %
LL= NV
PL= NP
PI= NP
R-Value= 47
AASHTO: A-2-4
USCS: SM
With igneous(?)/quartz gravels
MC= 4.6 %
DD= 120.0 pcf
50/6
Depth Date Time
Total Depth: 5.5 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold & snowing
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-04 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
15/21
0.4 - 6.0 ft. silty SAND, brown, moist, dense.
Bottom of Hole at 6.0 ft.
with igneous/metamorphic(?)
quartz and mica gravels
MC= 2.6 %
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold & snowing
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-05 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
25/20
41/50:3
18/23
9/14/15
14/23/20
17/18/35
0.0 - 0.4 ft. ASPHALT 5 inches.
0.4 - 8.0 ft. silty SAND, brown-gray, moist, dense.
8.0 - 13.0 ft. sandy CLAY, dark brown, wet, hard.
13.0 - 31.0 ft. silty SAND, dark brown to brown-tan, wet, medium dense to dense.
31.0 - 36.0 ft. silty SAND, brown, wet.
Water much higher in second attempt, 3 ft vs 8 ft.
MC= 3.6 %
MC= 6.4 %
DD= 123.9 pcf S/C= -0.9 %
MC= 9 %
DD= 127.8 pcf S/C= -0.6 %
MC= 13.8 %
#200= 9 %
LL= NV
PL= NP
PI= NP
AASHTO: A-1-b (0)
USCS: SW-SM
MC= 13.1 %
#200= 10 %
LL= NV
PL= NP
PI= NP
AASHTO: A-1-b (0)
USCS: SW-SM
8 ft away from original hole, closer to bridge, second attempt to go to 50 ft, 12/12/13
MC= 17.7 %
#200= 10 %
LL= NV
PL= NP
50:3
Depth Date Time
Total Depth: 51.5 ft Ground Elevation:
Location:
Coordinates: N: E:
8.0 ft 12/10/13 11:30 am
3.0 ft 12/12/13 9:30 am
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/12/2013 Drill Bit:
Casing:
Weather: cold, snowy to just plain cold, very cold
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-06 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 2
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
50:6
14/21
35/50:5
10/14/17
36.0 - 40.0 ft. gravelly SAND.
40.0 - 51.5 ft. silty SAND, brown, wet, dense to very dense.
Bottom of Hole at 51.5 ft.
PI= NP
AASHTO: A-1-b (0)
USCS: SW-SM
MC= 11.4 %
DD= 137.3 pcf Slow drilling ~36-40 ft, hitting rocks (quartzite)
MC= 9.2 %
DD= 132.8 pcf
MC= 11.8 %
DD= 124.8 pcf
MC= 18.8 %
#200= 14 %
LL= NV
PL= NP
PI= NP
AASHTO: A-2-4 (0)
USCS: SM
50:5
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-06 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 2 of 2
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
16/19
0.0 - 0.3 ft. ASHPALT 4 inches.
0.3 - 6.0 ft. silty SAND, brown-orange to tan, moist, medium dense.
Bottom of Hole at 6.0 ft.
Coarse sand
MC= 4.4 %
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold, breezy
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-07 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
31/34
0.0 - 0.4 ft. ASPHALT 5 incheS.
0.4 - 6.0 ft. silty SAND, brown to dark brown, damp to moist, very dense.
Bottom of Hole at 6.0 ft.
MC= 7 %
DD= 128.7 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-08 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
0.4 - 4.0 ft. silty SAND, brown, moist.
Bottom of Hole at 4.0 ft.
MC= 6.5 %
#200= 34 %
LL= NV
PL= NP
PI= NP
R-Value= 43
AASHTO: A-2-4 (0)
USCS: SM
Slow to drill 3-4 ft, contains rounded gray sand-clay balls and rounded quartzite gravel
Depth Date Time
Total Depth: 4.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-09 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
12/10
0.4 - 3.5 ft. gravelly SAND, brown, moist.
3.5 - 6.0 ft. silty SAND, dark brown to brown-orange, moist, medium dense.
Bottom of Hole at 6.0 ft.
MC= 7 %
DD= 112.2 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-10 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
18/12
0.4 - 1.5 ft. gravelly SAND, gray - brown.
1.5 - 6.0 ft. silty SAND, brown to light brown, moist, medium dense.
Bottom of Hole at 6.0 ft.
MC= 7.7 %
DD= 118.9 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: sunny & cold, breezy
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-11 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
13/14
0.4 - 6.0 ft. gravelly SAND, brown, moist, medium dense.
Bottom of Hole at 6.0 ft. MC= 6.2 % DD= 114.1 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold, very cold & windy
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-12 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
9/14
0.0 - 0.3 ft. ASPHALT 5 inches.
0.3 - 4.0 ft. SAND, gray to brown.
4.0 - 6.0 ft. sandy CLAY, brown to dark brown, moist, very stiff.
Bottom of Hole at 6.0 ft.
MC= 13.9 %
DD= 109.6 pcf S/C= -0.3 %
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold & windy
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-13 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
7/20
0.4 - 6.0 ft. clayey SAND, brown, moist, loose to medium dense.
Bottom of Hole at 6.0 ft.
MC= 9.6 %
DD= 130.1 pcf S/C= -0.4 %
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold & windy
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-14 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
50:0
0.4 - 5.0 ft. gravelly SAND, brown to gray -brown, moist, very dense.
Bottom of Hole at 5.0 ft.
MC= 7.9 %
#200= 32 %
LL= NV
PL= NP
PI= NP
R-Value= 45
AASHTO: A-2-4 (0)
USCS: SM
Hit rock at 5 ft--> used split spoon
Depth Date Time
Total Depth: 5.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold & windy
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-15 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
18/16/21
0.4 - 6.5 ft. gravelly SAND, brown, moist, dense.
Bottom of Hole at 6.5 ft.
Gravel is gray, subrounded.
MC= 6.6 %
#200= 22 %
LL= NV
PL= NP
PI= NP
AASHTO: A-2-4 (0)
USCS: SM
Depth Date Time
Total Depth: 6.5 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/10/2013 Drill Bit:
Casing:
Weather: cold & windy
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-16 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
0.4 - 3.0 ft. gravelly SAND, dark gray, moist.
Bottom of Hole at 3.0 ft.
MC= 9.4 %
#200= 31 %
LL= NV
PL= NP
PI= NP
AASHTO: A-2-4 (0)
USCS: SM
Depth Date Time
Total Depth: 3.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/10/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold & windy
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-17 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
10/22
0.4 - 6.0 ft. gravelly SAND, brown, moist, dense.
Bottom of Hole at 6.0 ft.
MC= 7.9 %
DD= 115.3 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: very cold (-6F)
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-18 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
0.4 - 5.5 ft. gravelly SAND, light brown to brown, moist, very dense.
Bottom of Hole at 5.5 ft.
gray gravel
MC= 2.4 %
Depth Date Time
Total Depth: 5.5 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold, sun is out
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-19 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
13/14
0.4 - 6.0 ft. gravelly SAND with clay, brown to light brown, moist, medium dense.
Bottom of Hole at 6.0 ft.
MC= 5.3 %
DD= 122.6 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold but sunny
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-20 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
11/11
0.4 - 6.0 ft. gravelly SAND, brown, moist, medium dense.
Bottom of Hole at 6.0 ft.
1st attempt refusal with HSA, tried SS=>refusal.
Moved 5 ft south with SS.
MC= 5.8 %
DD= 114.8 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold & sunny
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-21 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
19/15
0.4 - 6.0 ft. gravelly SAND, brown to light brown, moist, medium dense.
Bottom of Hole at 6.0 ft.
gray quartz gravel
MC= 6.2 %
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold & sunny
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-22 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
9/33
0.4 - 6.0 ft. sandy CLAY with gravel, dark brown, moist, dense.
Bottom of Hole at 6.0 ft.
MC= 12.2 %
DD= 129.2 pcf S/C= -0.2 %
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold & sunny
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-23 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
14/15
0.4 - 6.0 ft. gravelly SAND, brown, moist, medium dense.
Bottom of Hole at 6.0 ft.
MC= 10.8 %
DD= 123.5 pcf S= 0.003 %
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold & sunny
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-24 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
17/35
0.4 - 6.0 ft. gravelly SAND with clay, brown to dark brown, moist, very dense.
Bottom of Hole at 6.0 ft.
MC= 14.8 %
DD= 104.3 pcf
Depth Date Time
Total Depth: 6.0 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold & sunny
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-25 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
0.4 - 2.5 ft. gravelly SAND, brown, moist.
Bottom of Hole at 2.5 ft.
MC= 6.3 %
#200= 24 %
LL= NV
PL= NP
PI= NP
AASHTO: A-1-b (0)
USCS: SM
Refusal at 2.5 ft on two attemps.
Depth Date Time
Total Depth: 2.5 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold & sunny
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-26 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
50:2
17/17
16/30
17/25
36/30
0.0 - 0.5 ft. ASPHALT 6 inches.
0.5 - 13.0 ft. gravelly SAND rock with clay on top at 5 ft, brown to dark brown, moist, dense to very dense.
13.0 - 17.0 ft. clayey SAND, brown, wet, medium dense.
17.0 - 24.0 ft. SAND, brown to light brown, wet, dense.
24.0 - 51.0 ft. SAND, brown, wet, medium dense to very dense.
MC= 13 %
#200= 33 %
LL= NV
PL= NP
PI= NP
AASHTO: A-2-4 (0)
USCS: SM
MC= 10.7 %
MC= 8.9 %
DD= 135.6 pcf S= 0.003 %
MC= 12.3 %
DD= 122.5 pcf
MC= 9.3 %
DD= 134.9 pcf
50:2
Depth Date Time
Total Depth: 51.0 ft Ground Elevation:
Location:
Coordinates: N: E:
12.0 ft 12/11/13
Boring Began: 12/11/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/11/2013 Drill Bit:
Casing:
Weather: cold
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-27 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 2
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
36/15
12/12
35/50:5
Bottom of Hole at 51.0 ft.
MC= 13.5 %
DD= 123.1 pcf
MC= 12.6 %
DD= 123.0 pcf
MC= 14.6 %
DD= 124.0 pcf
MC= 13.4 %
DD= 123.6 pcf
50:6
50:5
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-27 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 2 of 2
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
0.4 - 5.5 ft. gravelly SAND, brown to light brown, moist, very dense.
Bottom of Hole at 5.5 ft.
MC= 3.7 %
DD= 116.3 pcf
50:6
Depth Date Time
Total Depth: 5.5 ft Ground Elevation:
Location:
Coordinates: N: E:
Boring Began: 12/12/2013
Drilling Method: Solid-Stem Auger (4" O.D.)
Drill: CME 55
Driller: Dakota Drilling
Logged By: M. Boyd
Final By: M. Boyd
Inclination: Vertical
Completed: 12/12/2013 Drill Bit:
Casing:
Weather: cold & sunny
Ground Water Notes:
Rock
GEOTECHNICAL ENGINEERING CONSULTANTS
R Q
D
R ec ov er y
Blows per 6 in
YEH AND ASSOCIATES, INC.
R un
S am pl e T yp e
D ep th (f ee t)
E le va tio n (f ee t)
Boring: B-28 Project Number: 213-276 Date: 12/1/13
Field Notes and
Lab Tests
Sheet 1 of 1
Soil Samples
N
Project: Fremont Lake Road
Material Description
Li th ol o gy
B O
R
IN
G L
O G
-2
F
R E
M O
N T
L A
K E
R O
A D
.G P
J Y
E H
A S
S O
C
IA
T E
S .G
D T
/2
3/
Project No: Date: 12/26/2013
Gradation Atterberg Unconf.
Comp.
Strength
(psf)
B1 5 CA 10.6 118.8
B2 5 CA 4.5
B3 5 CA 13.6 105.6
B4 1-5 Bulk 7.4
5 65 30 NV NP NP
47 A-2-4 ( 0 ) SM
B4 5 CA 4.6 120.0
213-276 Project Name:
Sample Location
Sample
Type
Natural Dry
Density
(pcf)
PL
Gravel
> #4
Natural
Moisture
Content
(%) USCSAASHTO
PI
Water
Soluble
Sulfate
% Swell (+) /
Consoli-dation (-) pH
YEH & ASSOCIATES, INC
Fremont Lake Road
Summary of Laboratory Test Results
CLASSIFICATION
Sand
Fines <
#200
LL
R-VALUEBoring
NO.
Depth (ft)
B4 5 CA 4.6 120.0
B5 5 CA 2.6
B6 5 CA 3.6
B6 10 CA 6.4 123.9
-0.9
B6 15 CA 9.0 127.8
-0.6
B6 20 CA 13.8
20 71 9 NV NP NP
A-1-b ( 0 ) SW-SM
B6 25 CA 13.1
16 74 10 NV NP NP
A-1-b ( 0 ) SW-SM
B6 30 CA 17.7
11 79 10 NV NP NP
A-1-b ( 0 ) SW-SM
B6 35 CA 11.4 137.3
B6 40 CA 9.2 132.8
B6 45 CA 11.8 124.8
B6 50 Bulk 18.8
4 82 14 NV NP NP
A-2-4 ( 0 ) SM
Rev 2 - 8/02 Page 1 of 1
Comp.
Strength
(psf)
B7 5 CA 4.4
B8 5 CA 7.0 128.7
B9 1-4 Bulk 6.5
14 52 34 NV NP NP
43 A-2-4 ( 0 ) SM
B10 5 CA 7.0 112.2
B11 5 CA 7.7 118.9
LL
YEH & ASSOCIATES, INC
Summary of Laboratory Test Results
213-276 Project Name: Fremont Lake Road
Sample Location Natural
Moisture
Content
Natural Dry
Density
(pcf) pHBoring
NO.
Depth (ft)
Sample
Type
Gravel
> #4
Sand
Fines <
#200
PL PI
AASHTO USCS
% Swell (+) /
Consoli-dation (-)
R-VALUE
CLASSIFICATIONWater
Soluble
Sulfate
B11 5 CA 7.7 118.9
B12 5 CA 6.2 114.1
B13 5 CA 13.9 109.6
-0.3
B14 5 CA 9.6 130.1
-0.4
B15 1-5 Bulk 7.9
8 60 32 NV NP NP
45 A-2-4 ( 0 ) SM
B16 5 Bulk 6.6
21 57 22 NV NP NP
A-1-b ( 0 ) SM
B17 1-3 Bulk 9.4
17 52 31 NV NP NP
A-2-4 ( 0 ) SM
B18 5 CA 7.9 115.3
B19 5 CA 2.4
B20 5 CA 5.3 122.6
B21 5 CA 5.8 114.8
B22 5 CA 6.2
Comp.
Strength
(psf)
B23 5 CA 12.2 129.2
-0.2
B24 5 CA 10.8 123.5
0.003
B25 5 CA 14.8 104.3
B26 1-2.5 Bulk 6.3
15 61 24 NV NP NP
A-1-b ( 0 ) SM
B27 1-5 Bulk 13.0
8 59 33 NV NP NP
A-2-4 ( 0 ) SM
YEH & ASSOCIATES, INC
Summary of Laboratory Test Results
213-276 Project Name: Fremont Lake Road
Sample Location Natural
Moisture
Content
Natural Dry
Density
(pcf) pH Depth (ft)
Sample
Type
Gravel
> #4
Sand
Fines <
#200
LL PL PI
AASHTO USCS
% Swell (+) /
Consoli-dation (-)
R-VALUE
CLASSIFICATIONWater
Soluble
Sulfate
Boring
NO.
B27 1-5 Bulk 13.0 8 59 33 NV NP NP A-2-4 ( 0 ) SM
B27 15 CA 10.7
B27 20 CA 8.9 135.6
0.003
B27 25 CA 12.3 122.5
B27 30 CA 9.3 134.9
B27 35 CA 13.5 123.1
B27 40 CA 12.6 123.0
B27 45 CA 14.6 124.0
B27 50 CA 13.4 123.6
B28 5 CA 3.7 116.3
Bulk
NV NP NP
39 A-1-b ( 0 ) SMMix (B-16),(B-26)
Appendix C
SEISMIC CLASSIFICATION
Design Maps Summary Report
Building Code Reference Document
Site Coordinates
Site Soil Classification
PGA = 0.118 g As = 0.184 g
SS = 0.258 g SDS = 0.411 g
S1 = 0.091 g SD1 = 0.219 g
User–Specified Input 2009 AASHTO Guide Specifications for LRFD Seism ic Bridge Design (w hich utilizes USGS hazard data available in 2002)
42.9404°N, 109.7963°W
Site Class D – “Stiff Soil”
USGS–Provided Output
Although this inform ation is a product of the U.S. Geological Survey, w e provide no w arranty, expressed or im plied, as to the accuracy of the data contained therein. This tool is not a substitute for technical subject-m atter know ledge.
Page 1 of 1Design Maps Summary Report
1/10/2014http://geohazards.usgs.gov/designmaps/us/summary.php?template=minimal&latitude=42.9...
Appendix D
TRAFFIC LOADING CALCULATIONS
ESAL Calculations for Fremont Lake Road 213-276
ESAL Estimated
Given: Factor % of Daily
Segment 1 - USFS Boundart to Half Moon Lake Class Veh type ESAL Factors Used Volume Volume
Year ADT 2 Passenger Cars 0.0004 0.0008 0.0004 43.8% 542
2008 1075 3 PU 0.0004 0.004 0.004 43.8% 542
2013 1115 1129 5 Campers & Trash Trk 0.3 0.7 0.5 12.0% 148
Projected 2028 1236 1290 9 5-Axle Trucks 2.0 2.3 2 0.4% 5
Projected 2033 1277 1344
100.0% 1237
Segment 2 - Half Moon Lake Road to
Year ADT
2008 1075
2013 1115 1129
Projected 2028 1236 1290
Projected 2033 1277 1344 NEW Traffic Loading 2-6-14
Design ADT Volume = (Year 1 + Year 20)/2
20-Yr Design Vol (ADT) = (1129 + 1344)/2 = 1236.5
Des ESALs 1236.5 X veh % X ESAL Factor X 365 days/yr X 20 Years = Design ESALs
ESAL
Class Veh type Volume Factor days years ESALs
2 Passenger Cars 541.587 0.0004 365 20 1581
3 PU 541.587 0.004 365 20 15814
5 Campers & Trash Trk 148.38 0.5 365 20 541587
9 5-Axle Trucks 4.946 2 365 20 72212
Total ESALs = 631194
Lane Correction factor = 0.6
Total Design ESALs = 378717
Appendix E
PAVEMENT DESIGN PROGRAM OUTPUT
1993 AASHTO Pavement Design
DARWin Pavement Design and Analysis System
A Proprietary AASHTOWare Computer Software Product
Richard Johnson
Flexible Structural Design Module
Fremont Lake Road 213-276
Pulverized/Milled HMA
Flexible Structural Design
18-kip ESALs Over Initial Performance Period 387,717 Initial Serviceability 4.2 Terminal Serviceability 2 Reliability Level 75 % Overall Standard Deviation 0.44 Roadbed Soil Resilient Modulus 9,497 psi Stage Construction 1
Calculated Design Structural Number 2.39 in
Specified Layer Design
Layer
Material Description
Struct Coef.
(Ai)
Drain Coef.
(Mi)
Thickness (Di)(in)
Width
(ft)
Calculated
SN (in)
1 HMA 0.44 1 4 12 1.76
2 Pulverized/Milled HMA 0.12 1 3 12 0.36 3 ABC, Class 6 0.12 1 3 12 0.36
Total - - - 10.00 - 2.48