About this opportunity

The Department of Agriculture Forest Service is seeking bids for the Windy Helicopters Stewardship IRSC contract on the Nez Perce-Clearwater National Forest near Riggins, Idaho. The mandatory work includes cutting and removing timber from 169 acres of helicopter logging units, road maintenance on approximately 2 miles of FSR 624 and FSR 517, and road construction to bring haul roads up to standard on FSR 517, 624, 2109, and 9908. The timber is to be scaled and paid as a priced service item due to a deficit timber appraisal. The Service Contract Act wage and labor requirements apply to the timber removal and road maintenance work, while the Davis-Bacon wage and labor requirements apply to the road construction work. A bid bond or other acceptable guarantee of 20% of the construction total is required with the initial offer, and payment/performance bonds of 100% of the construction cost will be required from the awardee.

This is not a set-aside procurement. The NAICS code is likely 115310 - Support Activities for Forestry, and the PSC code is likely 5510 - Lumber, Timber, Raw Materials. There is no mention of potential incumbents or current contractors. The government estimate for the road construction work is between $250,000 and $500,000. The tentative period of performance is from the date of award through October 31, 2027, and the complete solicitation is expected to be posted on SAM.gov around the end of April 2024.

Notice text

Background: The Windy Helicopters Stewardship IRSC shall be awarded under the following authority.

Stewardship Authority:  Section 604 (16 USC 6591c) of Public Law 108-148 as amended by Section 8205 of Public Law 113-79, the Agricultural Act of 2014—Grants the U.S. Forest Service (Government) permanent authority to enter into stewardship contracts or agreements to achieve land management goals for the National Forests or public lands that meet local and rural community needs. Section 8205 supersedes the temporary authority granted to the Forest Service (Government) in section 347 of Public Law 105-277, the Omnibus Consolidated and Emergency Appropriations Act, 1999. 

Project Location. The project area is located on the Salmon River Ranger District of the Nez Perce-Clearwater National Forest near the town of Riggins, Idaho. The project is divided geographically into to separate areas; ‘White Bird Ridge Road’ FSR624 and ‘Seven Devils Road’ FSR517. Both roads area accessed from Highway 95. See attached map.

Description. The Nez Perce-Clearwater National Forest is currently preparing the Windy Helicopters Stewardship IRSC to reduce the risk of, or increase resilience to, insect or disease infestations in the project area and to reduce the wildfire risk to the local communities and surrounding federal lands.  This project is being implemented as a part of the Wildfire Crisis Strategy for the Nez Perce-Clearwater Lower Salmon area.

The following is anticipated for mandatory work items:

Item 1: Cut and remove included timber from 169 acres (4 units) of helicopter logging units. Timber to be cut shall be designated by description and in general is classified as a commercial thin. Minimum sawlog specifications will be 7.0” DBH 8’ piece for sawlog and 5.0” 16’ piece for non-saw. Non-saw timber removal will be required. Whole tree yarding will be required. The timber shall be scaled.  Due to a deficit timber appraisal, this pay item shall be solicited as a priced service item.   Estimated Timber Volume and Species composition is provided in a separate attachment.

Item 2a:  Road maintenance will be required on approximately 2 miles of FSR 624 for the southern units including brushing, blading, and dust abatement for the haul route. Landings will require improvement at locations identified on project map. Note that the upper landing will require a permit with the BLM. Alternate landing locations must be approved by FS prior to construction.

Item 2b:  Road maintenance will be required on FSR 517 for the northern units including, blading, and dust abatement.

The Service Contract Act wage and labor requirements apply to Item 1, 2a and 2b work. 

Item 3:  Road construction shall be required to bring the haul roads up to standard for FSR 517, 624, 2109, and 9908.  Work shall include gravel placement, culvert installation, curve widening and limited road reconditioning.  Commercial source gravel will be used. A complete set of supplemental road construction specifications tiered to Federal Highway Standard Specifications shall be supplied along with signed construction plans.  Davis-Bacon wage and labor requirements apply to Item 3 work.

The Government’s estimate for the road construction work is between $250,000 and $500,000.

Site Visit.  No organized site visit has been planned at this time.  Due to winter conditions, site visits will be coordinated on an individual basis. Over-snow travel may be required.

It is estimated that the complete solicitation with all final maps and attachments shall be posted on sam.gov around the end of April 2024.  The tentative period of performance is estimated to be from date of award through October 31, 2027. 

Construction Bonding:  A bid bond or other acceptable bid guarantee valued at 20% of the construction total price quoted shall be required and submitted with the initial offer.  Bonding shall be required in connection to the value of the construction work only. Payment and Performance bonds valued at 100% of the Item 3 total price shall be required from the contract awardee. 

Files

File Type Posted
WindyHeli_EstTimberVolumeSpeciesTable.docx DOCX document
WindyHelicoptersIRSC_HeliMap.pdf PDF

Notice history

Notice Type Posted
Windy Helicopters Stewardship IRSC - R1, Nez Perce-Clearwater NFs, Salmon River RD Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
End of the World Long Term Stewardship Grangeville, Idaho, United States · NAICS 113310 Forest Service No set-aside
Leverich Helio Stewardship IRSC Montana 59718, United States · NAICS 113310 Forest Service Total Small Business
Pacific Northwest (PNW) Stewardship BPA- Region 6 (OR & WA) - OPEN/CONTINUOUS Portland, Oregon 97204, United States · NAICS 115310 Forest Service No set-aside
Intermountain Stewardship BPA Ogden, Utah 84401, United States · NAICS 115310 Forest Service No set-aside
USFS Wildland Fire Aviation Helicopter Support Services for Hoist and Medical Services United States Forest Service No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors