Wetland Reserve Hydrology Restoration -Gibson County, TN - NRCS

Award Notice Posted

Solicitation number
AG-4741-S-15-0004
Agency
Awarded
to Williams Excavating LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-4741-C-15-0003 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Gibson County, Tennessee Humboldt, Tennessee, United States

Notice details come from SAM.gov. Updated .

Notice text

6 versions

Update #6 · Latest ·

North American Green S150BN is the correct ECB to be used for the project.

Construction Specification 6 has been updated under Bid item 11, line 9 and Bid item 22, line 9 with the correct specifications of biodegradable jute net instead of photodegradable polypropylene net listed in the original spec.
The change has been made in bold writing. This change will make the construction plans and construction specification the same.
Revised Construction Specification 6 is attached.

Update #5 ·

All amendments posted April 28, 2015 and and thereafter shall be acknowledged.

Update #4 ·

This amendment is to waive the requirement to acknowledge Amendments 1-18 listed on
www.fbo.gov.

Amendment 1 dated April 28, 2015 (shown as amendment 19 on www.fbo.gov) shall be
acknowledged.


Also, this amendment revises the bid opening date to Wednesday, May 6, 2015 at 1:00 pm CT.

Update #3 ·

Combined Set of Drawings added.


A single file containing the combined sets of drawings was uploaded on April 12, 2015 to replace individual drawing files uploaded on April 7. This was posted as Solicitation 4 in the attachments to this solicitation.


This replaces the files loaded on Amendments 2 - 18.


There is no need to print Amendments 2 -18.


 

Update #2 ·

A Site Showing will be conducted on April 8, 2015 at 9:00 am. local time at the following location:


West Tennessee River Basin Authority - Conference Room
3628 East End Drive
Humboldt, TN 38343


Technical Point of Contact: Jeremy Ruffell, 731-668-0700, ext. 107.


 

Update #1 ·

This notice provides details of an upcoming project prior to advertisement of the solicitation package. The Natural Resources Conservation Service (NRCS) intends to solicit for award of a Firm Fixed Price (FFP) construction contract to enhance wetland functions and restore wetland hydrology on a Wetland Reserve Easement in Gibson County, Tennessee.

Wetland Reserve Easement hydrology restoration work will be constructed on fields 2, 4, and 6 on the northern portion and field 8 on the southern portion of the Jodi Barker WRP easement. The site is located 1.5 miles west of Humboldt in Gibson County, Tennessee. This construction work is intended to restore natural wetland hydrology to the site. This easement is perpetual. Once the site is restored back to a wetland, it will remain in that land use forever providing many benefits to wildlife, flood storage, and water quality.


The construction work in 2015 will involve 4 of the 16 fields within the easement. Work will only be conducted on the open fields north of Highway 152 and one field south of Highway 152. No work will be conducted in wooded fields. Some clearing of trees will be required along the levees that will be breached to allow floodwaters to access the fields. These trees will be placed strategically in the fields to help create habitat.



The estimated magnitude of construction is between $250,000 and $500,000.


The North American Industrial Classification Code (NAICS) applicable to this requirement is 237990, with a small business size standard of $36.5 million. This procurement will be set aside as a 100% small business set-aside.


Performance time is estimated to be 84 Calendar Days.


The Invitation For Bids (IFB) will be available in electronic format only and will be posted on the Federal Business Opportunities (FBO) website at http://www.fbo.gov on or about April 6, 2015 with a closing date of May 5, 2015.


IT IS THE SOLE RESPONSIBILITY OF THE OFEROR TO CHECK THE FBO WEBSITE FOR CHANGES.


Performance and Payment Bonds in the amount of 100% of the awarded bid will be required within 10 days after notice of award. A 20% Bid Guarantee/Bid Bond will be required with each submitted bid.


In order to receive an award regardless of dollar value, you must be registered in "System for Award Management". https://www.sam.gov/portal/public/SAM/

Files

File Type Posted
Abstract_AG-4741-S-15-0004.pdf PDF
RevisedCspec06_Jodi_Barker_WRP_05012015.pdf PDF
Amendment3_ResponsesBarker.pdf PDF
SF_24-98.pdf PDF
Amendment3Cspec06_Jodi_Barker_WRP_04292015.pdf PDF
Amendment3_4_29_2015.pdf PDF
Amendment2RevisedBidSchedule4_29_2015.xlsx XLSX spreadsheet
Amendment2_drawingJodi_Barker_WRE_Sheet_9_of_12.pdf PDF
Amendment2Jodi_Barker_WRE_Sheet_12_of_14.pdf PDF
Amendment2Barker4_29_2015.pdf PDF
Jodi_Barker_WRP_Site_Showing_Question_and_Answers.pdf PDF
Jodi_Barker_North_Site_Showing_Signup_sheets.pdf PDF
Amendment1_4_28_2015.pdf PDF
Pages_fromDrawings5-6.pdf PDF
Pages_from_Pages_from_Drawings4.pdf PDF
Pages17from_drawings.pdf PDF
Pages_from_Drawings7-9.pdf PDF
Page2from_Drawings.pdf PDF
Pages_from_Drawings_21-24.pdf PDF
Pages_drawingsPages26.pdf PDF
Pages_from_Pagesfrom_DrawingsPages_27-29.pdf PDF
Page12of12.pdf PDF
Pagesfrom_drawingsPages_25.pdf PDF
Pages_from_Drawings3.pdf PDF
Page2from_Drawings.pdf PDF
Pages_fromDrawings18-20.pdf PDF
Pages_16_from_drawings.pdf PDF
Pages_from_Drawings13-15.pdf PDF
Covers_Signed_DrawingSet_AllFields_JodiBarkerWRP_03102015.pdf PDF
Pages_from_Drawings10-12.pdf PDF
Pages_from_Drawings3.pdf PDF
TN124Wage_Rates.txt TXT text file
CombinedSpecs_JodiBarker_03092015.pdf PDF
Page1Drawings.pdf PDF
FY15BarkerSolicitation.pdf PDF
Show all 35

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors