Amendment2RevisedBidSchedule4_29_2015.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
Wetland Reserve Hydrology Restoration -Gibson County, TN - NRCS
Solicitation number
AG-4741-S-15-0004
Issued by

About this file

Amendment 2 revised Bid Schedule

View the file

Other files

File Type Posted
Abstract_AG-4741-S-15-0004.pdf PDF
RevisedCspec06_Jodi_Barker_WRP_05012015.pdf PDF
Amendment3_4_29_2015.pdf PDF
SF_24-98.pdf PDF
Amendment3Cspec06_Jodi_Barker_WRP_04292015.pdf PDF
Amendment3_ResponsesBarker.pdf PDF
Jodi_Barker_North_Site_Showing_Signup_sheets.pdf PDF
Amendment2_drawingJodi_Barker_WRE_Sheet_9_of_12.pdf PDF
Amendment2Barker4_29_2015.pdf PDF
Amendment2Jodi_Barker_WRE_Sheet_12_of_14.pdf PDF
Jodi_Barker_WRP_Site_Showing_Question_and_Answers.pdf PDF
Amendment1_4_28_2015.pdf PDF
Pages_fromDrawings5-6.pdf PDF
Pages_from_Pages_from_Drawings4.pdf PDF
Pages17from_drawings.pdf PDF
Pages_from_Drawings7-9.pdf PDF
Page2from_Drawings.pdf PDF
Pages_from_Drawings_21-24.pdf PDF
Pages_drawingsPages26.pdf PDF
Pages_from_Pagesfrom_DrawingsPages_27-29.pdf PDF
Page12of12.pdf PDF
Pagesfrom_drawingsPages_25.pdf PDF
Page2from_Drawings.pdf PDF
Pages_from_Drawings3.pdf PDF
Pages_fromDrawings18-20.pdf PDF
Pages_16_from_drawings.pdf PDF
Pages_from_Drawings10-12.pdf PDF
Pages_from_Drawings13-15.pdf PDF
Covers_Signed_DrawingSet_AllFields_JodiBarkerWRP_03102015.pdf PDF
Pages_from_Drawings3.pdf PDF
TN124Wage_Rates.txt TXT text file
CombinedSpecs_JodiBarker_03092015.pdf PDF
Page1Drawings.pdf PDF
FY15BarkerSolicitation.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

BID SCHEDULE
JODI BARKER WETLAND RESERVE PROGRAM EASEMENT
GIBSON COUNTY, TENNESSEE
February 24, 2015

This bid schedule covers the restoration work on the Jodi Barker Wetland Reserve Program Easement. The easement is located in Gibson County, Tennessee.

Item NumberSpecification NumberUnit Price
ServicesQuantityUnitAmount
Jodi Barker All Fields
1Mobilization & Demobilization81Job$$

2 Construction Surveys 7 1 Job $ $

3 Removal of Water 11 1 Job $ $

Field 2

4 Clearing and Grubbing 2 4.8 Acre $ $

5 Earthfill, Class C, Dike 23 10,066 C.Y. $ $

6 Excavation, Common, Levee Lowering 21 3,066 L.F. $ $

7 Excavation, Common, Shallow Excavation 21 908 C.Y. $ $

8 Structure for Water Control, 18" Aluminum 51 1 Job $ $

9 Structure Removal, Screw Gate Removal 3 1 Job $ $

10 Protective Cover, Vegetation & Mulching 6 5.7 Acre $ $

11 Seeding and Mulching, Erosion Control Blanket 6 9,232 S.Y. $ $

Field 4

12 Clearing and Grubbing 2 2.3 Acre $ $

13 Excavation, Common, Levee Lowering 21 2,131 L.F. $ $

14 Protective Cover, Vegetation & Mulching 6 3.8 Acre $ $

Field 6

15 Clearing and Grubbing 2 4.6 Acres $ $

16 Earthfill, Class C, Dike 23 17,275 C.Y. $ $

17 Excavation, Common, Levee Lowering 21 2,523 L.F. $ $

18 Structure for Water Control 18" Aluminum 51 1 Job $ $

19 Structure for Water Control 24" Aluminum 51 1 Job $ $

20 Structure Removal, Screw Gate and Pipe 3 1 Job $ $

21 Protective Cover, Vegetation & Mulching 6 8.5 Acre $ $

22 Seeding and Mulching, Erosion Control Blanket 6 12,000 S.Y. $ $

23 Rock Riprap, D50= 12" 61 485 Ton $ $

Field 8

24 Clearing and Grubbing 2 2.2 Acre $ $

25 Excavation, Common, Levee Lowering 21 2,006 L.F. $ $

26 Protective Cover, Vegetation & Mulching 6 3.2 Acre $ $

27 Rock Riprap, D50= 12" 61 35 Ton $ $

Fields 10 and 14-16

28 Field 10, 14-16: Moderate Grading, Seeding, and Mulching 6 10 Acre $ $

29 Field 14-16: Smoothing and Temporary Seeding 6 11.9 Acre $ $

30 Earthfill, Class C, Dike 23 100 C.Y. $ $

TOTAL BID $