About this opportunity

The General Services Administration seeks a firm fixed-price design-build contract to perform water intrusion repairs at the Charles E. Bennett Federal Building in Jacksonville, Florida. Repairs include removing exterior plaza pavers, installing a liquid membrane and structural concrete perimeter beams tapered for drainage, adding new floor drains tied to the existing system, and replacing full-height first floor windows. Proposals will be evaluated on a lowest price technically acceptable basis. The site visit is scheduled for May 12, 2021 and proposals are due June 14, 2021.

This 100% set-aside for small businesses reserves the procurement exclusively for offerors classified under NAICS code 236220, Construction of Commercial and Institutional Buildings, with a size standard of $39.5 million. The estimated value is between $1-5 million to be performed at the Charles E. Bennett Federal Building in Jacksonville, Florida. Base work must incorporate recommendations 1 through 7 from the December 2015 water intrusion study report.

Notice text

5 versions

Update #5 · Latest ·

UPDATE: 6/08/21 See SF30 Amendment 2 included in attachments.  A link to the as-builts was added after the initial posting on 6/08/21. Note: The as-built file is too large (130MB+) to be added to the RFP attachment listing. Access is limited to those with a need to know and intent to bid this project. See link below to request access and provide company name and POC info..

https://drive.google.com/file/d/1baNMaclBAY_mV52Wym6_EMg5Lo7zrtqV/view?usp=sharing 

See solicitation documents to include site visit RSVP information. Site Visit Date: 5/12/21 9:00AM.

Note: Statement of Work is revised from previous versions. 

GSA Public Buildings Service, Acquisition Management Division, Florida Branch (4PQF) 501 E. Polk Street, Suite 805 Tampa, Florida 33602 is issuing subject Request for Proposal (RFP) for a firm fixed price general construction design build contract to perform the work listed below in the project summary. This acquisition is 100% set aside for small  business concerns under NAICS 236220, (size standard $39.5 Million). The magnitude of the procurement is estimated to be between $1,000,000 - $5,000,000.


Project Summary:

Work to be performed under this Design-Build contract involves repairs to correct identified water intrusion points at the plaza level of Charles E. Bennett Federal Building, in Jacksonville, Florida. 

A comprehensive study was performed in December 2015, to identify water intrusion points and to provide conceptual design solutions to correct the problem(s). Repairs shall be designed and performed in general accordance to the recommended conceptual design solution, as identified in the study’s final report (December 23, 2015) as “Option 3R” (Option 3, revised).

Base bid includes Recommendations items 1 – 7 Option 3R as outlined in the attached TTV Survey and generally consists of:

Removing the exterior plaza paver system installation of a liquid membrane coating on existing deck membrane, installation of structural concrete to full height of existing concrete perimeter beams (approximately four inches in depth) tapered to permit proper drainage away from structure, installation of new floor drains at 30ft intervals to tie into existing drain system, replacement of full-height first-floor windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

BASE contract shall include the following recommendations:

1. Modify the existing Plaza Deck areas as follows at a minimum:

Option 3R. (Alternate)
a. Remove all pavers and sand.
b. Install a liquid membrane coating on existing deck membrane.
c. Install structural concrete to full height of existing concrete perimeter beams, approx.. 4 inches thick;
tapered to permit proper drainage away from structure.
d. Install new roof drains at 30ft intervals to tie into existing drain system, Approximately 4ft of piping at each
drain location, taper concrete to allow for adequate flow to the roof drains.
e. Ensure all membrane terminations extend terminations above water plane, utilize liquid applied barrier at all
termination points.
f. Remove all full height windows reinstall windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

#1 All work outlined in Modification option 3R shall be included in the base bid

#2 The survey references Expansion Joints however this is control joints

#3,  #4, #5 Include all sealants for the ground floor and the 1st floor in the base bid

#6 Not Used

#7 Bid Option 1 Include the remainder of all sealant replacement, cleaning, etc.

#8 NIC

Option #1,

If executed, the contractor shall provide all design work necessary for replacing all remaining exterior building sealant systems, including buildings windows, and building’s precast concrete panels. Upon completion and acceptance of the design provide all  materials, labor, Scaffolding, and equipment, to replace the exterior sealant system for all windows, and precast concrete panel joints. All requirements for this work are outlined in the Water Intrusion Analysis Charles E Bennett Federal Building Dated December 23, 2015 prepared by TTV Architects Inc. Include cleaning of all exterior windows, brick, concrete, and stone surfaces, stairs, and sidewalks. Include final window washing. Remove all sealant and backer rods from concrete panel joins and prepare joints for sealant, as described by the sealant and backer rod’s manufacturer-END

See solicitation documents for further requirements. 

Update #4 ·

UPDATE: 6/08/21 See SF30 Amendment 2 included in attachments.  As-builts added to attachments after initial posting on 6/08/21. 

See solicitation documents to include site visit RSVP information. Site Visit Date: 5/12/21 9:00AM.

Note: Statement of Work is revised from previous versions. 

GSA Public Buildings Service, Acquisition Management Division, Florida Branch (4PQF) 501 E. Polk Street, Suite 805 Tampa, Florida 33602 is issuing subject Request for Proposal (RFP) for a firm fixed price general construction design build contract to perform the work listed below in the project summary. This acquisition is 100% set aside for small  business concerns under NAICS 236220, (size standard $39.5 Million). The magnitude of the procurement is estimated to be between $1,000,000 - $5,000,000.


Project Summary:

Work to be performed under this Design-Build contract involves repairs to correct identified water intrusion points at the plaza level of Charles E. Bennett Federal Building, in Jacksonville, Florida. 

A comprehensive study was performed in December 2015, to identify water intrusion points and to provide conceptual design solutions to correct the problem(s). Repairs shall be designed and performed in general accordance to the recommended conceptual design solution, as identified in the study’s final report (December 23, 2015) as “Option 3R” (Option 3, revised).

Base bid includes Recommendations items 1 – 7 Option 3R as outlined in the attached TTV Survey and generally consists of:

Removing the exterior plaza paver system installation of a liquid membrane coating on existing deck membrane, installation of structural concrete to full height of existing concrete perimeter beams (approximately four inches in depth) tapered to permit proper drainage away from structure, installation of new floor drains at 30ft intervals to tie into existing drain system, replacement of full-height first-floor windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

BASE contract shall include the following recommendations:

1. Modify the existing Plaza Deck areas as follows at a minimum:

Option 3R. (Alternate)
a. Remove all pavers and sand.
b. Install a liquid membrane coating on existing deck membrane.
c. Install structural concrete to full height of existing concrete perimeter beams, approx.. 4 inches thick;
tapered to permit proper drainage away from structure.
d. Install new roof drains at 30ft intervals to tie into existing drain system, Approximately 4ft of piping at each
drain location, taper concrete to allow for adequate flow to the roof drains.
e. Ensure all membrane terminations extend terminations above water plane, utilize liquid applied barrier at all
termination points.
f. Remove all full height windows reinstall windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

#1 All work outlined in Modification option 3R shall be included in the base bid

#2 The survey references Expansion Joints however this is control joints

#3,  #4, #5 Include all sealants for the ground floor and the 1st floor in the base bid

#6 Not Used

#7 Bid Option 1 Include the remainder of all sealant replacement, cleaning, etc.

#8 NIC

Option #1,

If executed, the contractor shall provide all design work necessary for replacing all remaining exterior building sealant systems, including buildings windows, and building’s precast concrete panels. Upon completion and acceptance of the design provide all  materials, labor, Scaffolding, and equipment, to replace the exterior sealant system for all windows, and precast concrete panel joints. All requirements for this work are outlined in the Water Intrusion Analysis Charles E Bennett Federal Building Dated December 23, 2015 prepared by TTV Architects Inc. Include cleaning of all exterior windows, brick, concrete, and stone surfaces, stairs, and sidewalks. Include final window washing. Remove all sealant and backer rods from concrete panel joins and prepare joints for sealant, as described by the sealant and backer rod’s manufacturer-END

See solicitation documents for further requirements. 

Update #3 ·

UPDATE: 6/08/21 See SF30 Amendment 2 included in attachments. 

See solicitation documents to include site visit RSVP information. Site Visit Date: 5/12/21 9:00AM.

Note: Statement of Work is revised from previous versions. 

GSA Public Buildings Service, Acquisition Management Division, Florida Branch (4PQF) 501 E. Polk Street, Suite 805 Tampa, Florida 33602 is issuing subject Request for Proposal (RFP) for a firm fixed price general construction design build contract to perform the work listed below in the project summary. This acquisition is 100% set aside for small  business concerns under NAICS 236220, (size standard $39.5 Million). The magnitude of the procurement is estimated to be between $1,000,000 - $5,000,000.


Project Summary:

Work to be performed under this Design-Build contract involves repairs to correct identified water intrusion points at the plaza level of Charles E. Bennett Federal Building, in Jacksonville, Florida. 

A comprehensive study was performed in December 2015, to identify water intrusion points and to provide conceptual design solutions to correct the problem(s). Repairs shall be designed and performed in general accordance to the recommended conceptual design solution, as identified in the study’s final report (December 23, 2015) as “Option 3R” (Option 3, revised).

Base bid includes Recommendations items 1 – 7 Option 3R as outlined in the attached TTV Survey and generally consists of:

Removing the exterior plaza paver system installation of a liquid membrane coating on existing deck membrane, installation of structural concrete to full height of existing concrete perimeter beams (approximately four inches in depth) tapered to permit proper drainage away from structure, installation of new floor drains at 30ft intervals to tie into existing drain system, replacement of full-height first-floor windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

BASE contract shall include the following recommendations:

1. Modify the existing Plaza Deck areas as follows at a minimum:

Option 3R. (Alternate)
a. Remove all pavers and sand.
b. Install a liquid membrane coating on existing deck membrane.
c. Install structural concrete to full height of existing concrete perimeter beams, approx.. 4 inches thick;
tapered to permit proper drainage away from structure.
d. Install new roof drains at 30ft intervals to tie into existing drain system, Approximately 4ft of piping at each
drain location, taper concrete to allow for adequate flow to the roof drains.
e. Ensure all membrane terminations extend terminations above water plane, utilize liquid applied barrier at all
termination points.
f. Remove all full height windows reinstall windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

#1 All work outlined in Modification option 3R shall be included in the base bid

#2 The survey references Expansion Joints however this is control joints

#3,  #4, #5 Include all sealants for the ground floor and the 1st floor in the base bid

#6 Not Used

#7 Bid Option 1 Include the remainder of all sealant replacement, cleaning, etc.

#8 NIC

Option #1,

If executed, the contractor shall provide all design work necessary for replacing all remaining exterior building sealant systems, including buildings windows, and building’s precast concrete panels. Upon completion and acceptance of the design provide all  materials, labor, Scaffolding, and equipment, to replace the exterior sealant system for all windows, and precast concrete panel joints. All requirements for this work are outlined in the Water Intrusion Analysis Charles E Bennett Federal Building Dated December 23, 2015 prepared by TTV Architects Inc. Include cleaning of all exterior windows, brick, concrete, and stone surfaces, stairs, and sidewalks. Include final window washing. Remove all sealant and backer rods from concrete panel joins and prepare joints for sealant, as described by the sealant and backer rod’s manufacturer-END

See solicitation documents for further requirements. 

Update #2 ·

UPDATE: 5/27/21 See SF30 Amendment 1 included in attachments. 

See solicitation documents to include site visit RSVP information. Site Visit Date: 5/12/21 9:00AM.

Note: Statement of Work is revised from previous versions. 

GSA Public Buildings Service, Acquisition Management Division, Florida Branch (4PQF) 501 E. Polk Street, Suite 805 Tampa, Florida 33602 is issuing subject Request for Proposal (RFP) for a firm fixed price general construction design build contract to perform the work listed below in the project summary. This acquisition is 100% set aside for small  business concerns under NAICS 236220, (size standard $39.5 Million). The magnitude of the procurement is estimated to be between $1,000,000 - $5,000,000.


Project Summary:

Work to be performed under this Design-Build contract involves repairs to correct identified water intrusion points at the plaza level of Charles E. Bennett Federal Building, in Jacksonville, Florida. 

A comprehensive study was performed in December 2015, to identify water intrusion points and to provide conceptual design solutions to correct the problem(s). Repairs shall be designed and performed in general accordance to the recommended conceptual design solution, as identified in the study’s final report (December 23, 2015) as “Option 3R” (Option 3, revised).

Base bid includes Recommendations items 1 – 7 Option 3R as outlined in the attached TTV Survey and generally consists of:

Removing the exterior plaza paver system installation of a liquid membrane coating on existing deck membrane, installation of structural concrete to full height of existing concrete perimeter beams (approximately four inches in depth) tapered to permit proper drainage away from structure, installation of new floor drains at 30ft intervals to tie into existing drain system, replacement of full-height first-floor windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

BASE contract shall include the following recommendations:

1. Modify the existing Plaza Deck areas as follows at a minimum:

Option 3R. (Alternate)
a. Remove all pavers and sand.
b. Install a liquid membrane coating on existing deck membrane.
c. Install structural concrete to full height of existing concrete perimeter beams, approx.. 4 inches thick;
tapered to permit proper drainage away from structure.
d. Install new roof drains at 30ft intervals to tie into existing drain system, Approximately 4ft of piping at each
drain location, taper concrete to allow for adequate flow to the roof drains.
e. Ensure all membrane terminations extend terminations above water plane, utilize liquid applied barrier at all
termination points.
f. Remove all full height windows reinstall windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

#1 All work outlined in Modification option 3R shall be included in the base bid

#2 The survey references Expansion Joints however this is control joints

#3,  #4, #5 Include all sealants for the ground floor and the 1st floor in the base bid

#6 Not Used

#7 Bid Option 1 Include the remainder of all sealant replacement, cleaning, etc.

#8 NIC

Option #1,

If executed, the contractor shall provide all design work necessary for replacing all remaining exterior building sealant systems, including buildings windows, and building’s precast concrete panels. Upon completion and acceptance of the design provide all  materials, labor, Scaffolding, and equipment, to replace the exterior sealant system for all windows, and precast concrete panel joints. All requirements for this work are outlined in the Water Intrusion Analysis Charles E Bennett Federal Building Dated December 23, 2015 prepared by TTV Architects Inc. Include cleaning of all exterior windows, brick, concrete, and stone surfaces, stairs, and sidewalks. Include final window washing. Remove all sealant and backer rods from concrete panel joins and prepare joints for sealant, as described by the sealant and backer rod’s manufacturer-END

See solicitation documents for further requirements. 

Update #1 ·

See solicitation documents to include site visit RSVP information. Site Visit Date: 5/12/21 9:00AM.

Note: Statement of Work is revised from previous versions. 

GSA Public Buildings Service, Acquisition Management Division, Florida Branch (4PQF) 501 E. Polk Street, Suite 805 Tampa, Florida 33602 is issuing subject Request for Proposal (RFP) for a firm fixed price general construction design build contract to perform the work listed below in the project summary. This acquisition is 100% set aside for small  business concerns under NAICS 236220, (size standard $39.5 Million). The magnitude of the procurement is estimated to be between $1,000,000 - $5,000,000.


Project Summary:

Work to be performed under this Design-Build contract involves repairs to correct identified water intrusion points at the plaza level of Charles E. Bennett Federal Building, in Jacksonville, Florida. 

A comprehensive study was performed in December 2015, to identify water intrusion points and to provide conceptual design solutions to correct the problem(s). Repairs shall be designed and performed in general accordance to the recommended conceptual design solution, as identified in the study’s final report (December 23, 2015) as “Option 3R” (Option 3, revised).

Base bid includes Recommendations items 1 – 7 Option 3R as outlined in the attached TTV Survey and generally consists of:

Removing the exterior plaza paver system installation of a liquid membrane coating on existing deck membrane, installation of structural concrete to full height of existing concrete perimeter beams (approximately four inches in depth) tapered to permit proper drainage away from structure, installation of new floor drains at 30ft intervals to tie into existing drain system, replacement of full-height first-floor windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

BASE contract shall include the following recommendations:

1. Modify the existing Plaza Deck areas as follows at a minimum:

Option 3R. (Alternate)
a. Remove all pavers and sand.
b. Install a liquid membrane coating on existing deck membrane.
c. Install structural concrete to full height of existing concrete perimeter beams, approx.. 4 inches thick;
tapered to permit proper drainage away from structure.
d. Install new roof drains at 30ft intervals to tie into existing drain system, Approximately 4ft of piping at each
drain location, taper concrete to allow for adequate flow to the roof drains.
e. Ensure all membrane terminations extend terminations above water plane, utilize liquid applied barrier at all
termination points.
f. Remove all full height windows reinstall windows with a resized bottom lite to allow for the installation of a 12 inch concrete curb to support the window assembly above the potential water levels on the plaza deck.

#1 All work outlined in Modification option 3R shall be included in the base bid

#2 The survey references Expansion Joints however this is control joints

#3,  #4, #5 Include all sealants for the ground floor and the 1st floor in the base bid

#6 Not Used

#7 Bid Option 1 Include the remainder of all sealant replacement, cleaning, etc.

#8 NIC

Option #1,

If executed, the contractor shall provide all design work necessary for replacing all remaining exterior building sealant systems, including buildings windows, and building’s precast concrete panels. Upon completion and acceptance of the design provide all  materials, labor, Scaffolding, and equipment, to replace the exterior sealant system for all windows, and precast concrete panel joints. All requirements for this work are outlined in the Water Intrusion Analysis Charles E Bennett Federal Building Dated December 23, 2015 prepared by TTV Architects Inc. Include cleaning of all exterior windows, brick, concrete, and stone surfaces, stairs, and sidewalks. Include final window washing. Remove all sealant and backer rods from concrete panel joins and prepare joints for sealant, as described by the sealant and backer rod’s manufacturer-END

See solicitation documents for further requirements. 

Files

Show all 11

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Water Intrusion Repairs, Charles Bennett Fed Bldg, Jacksonville FL Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors