Wake Island Air Field Fiber Installation
Closed Pre-Solicitation Posted
- Solicitation number
- FA5215-26-R-9001
- Agency
-
Pacific Air Forces
Air Force, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 238210 Electrical Contractors and Other Wiring Installation Contractors
- Place of performance
- Wake Island, United States
Notice details come from SAM.gov. Updated .
About this opportunity
Pacific Air Forces intends to solicit engineering, furnishing, installation, and testing of 12 strands of single-mode blown fiber optic cable on Wake Island, with a total small business set-aside, and anticipates releasing the solicitation in the near term following a sources sought phase closing July 29, 2026. Work encompasses design, supply, installation into new fiber optic distribution panels, testing, and provision of all equipment, tools, materials, supplies, transportation, labor, supervision, management, housing, food, and incidentals necessary for completion. Place of performance is Wake Island. NAICS classification is 238210 (Electrical Contractors and Other Wiring Installation Contractors), with small business size standard of $45 million. The Air Force is currently conducting market research via sources sought (Solicitation No. FA5215-26-R-9001) to assess contractor availability and inform final acquisition strategy, including evaluation of socioeconomic set-asides (SDVOSB, HUBZone, 8(a), SDB, WOSB) versus full and open small business set-aside. Respondents to the sources sought must submit company information, capabilities packages demonstrating relevant experience and resources, and responses addressing team flexibility, remote staffing capability, prior remote location experience, boat procurement and transportation expertise, and competitive differentiation. Responses are due electronically in unclassified format to Jerald Belford at jerald.belford.2@us.af.mil. All response costs are the responsibility of interested parties.
Notice text
The following description of the requirement is intended to be a summary of the required services and is not intended to be all-inclusive. The contractor shall provide professional services and equipment to successfully engineer, furnish, install and test (EFI&T) 12 new Strands (St) of Single Mode (SM) blown Fiber Optic Cable (FOC) on Wake Island (WI). These fiber strands shall be installed in the new fiber optic distribution panels (FODPs) to be installed by the Contractor. The contractor shall provide all equipment, tools, materials, supplies, transportation, labor, supervision, management, housing, food and other incidentals necessary to meet the requirements as stated in the Statement of Work (SOW).
Files
| File | Type | Posted |
|---|---|---|
| WI Fiber Installation - Sources Sought.pdf |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Sipr LAN drops | Air Force Test Center | Total Small Business | |
| 56 CS FOC to Flightline and Wx Equipment, Luke AFB | Air Education and Training Command | Woman-Owned Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity