WA erfo NPS olym 2022‐1 (1), olympic NPS erfo repairs 2022
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 69056725B000006
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Washington, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration (FHWA) is seeking a small business contractor to perform emergency road and flood repairs along approximately 0.04 miles of North Shore Road in Olympic National Park, Washington. The project, designated as WA ERFO NPS OLYM 2022-1(1), involves comprehensive roadway rehabilitation including roadway excavation, bank stabilization, erosion control, aggregate placement, and environmental mitigation activities. Key contract requirements include construction survey, temporary traffic control, riprap placement, and extensive revegetation efforts using specific native plantings like willow and cottonwood stakes. The solicitation (No. 69056725B000006) will evaluate bids based on competitive pricing, with the current Engineer's Estimate set at $1,010,550.00. Bidders must be registered in the System for Award Management (SAM), submit a bid bond, and comply with Davis-Bacon wage rates, with the bid opening scheduled for April 29, 2025, at 2:00 p.m. with both in-person and virtual attendance options.
The contract is designated as a total small business set-aside with a contract value ranging between $700,000 and $2,000,000. Four contractors submitted bids, with Ecogrind Site Solutions, LLC presenting the lowest bid at $951,150.00, significantly below the Engineer's Estimate. The project is located in Jefferson County, Washington, with a fixed completion date of September 3, 2025, and will be performed under the Federal Highway Administration's standard construction specifications (FP-14). Work will include critical infrastructure improvements such as placing untreated timber piles, streambed material, and coarse woody debris to stabilize the creek bank, along with comprehensive erosion control and revegetation strategies. The project falls under the Highway, Street, and Bridge Construction NAICS category (237310) and will require precise implementation of environmental and engineering specifications detailed in the extensive project documentation.
Notice text
4 versions
Update #4 · Latest ·
WFL Project WA ERFO NPS OLYM 2022-1 (1), Olympic NPS ERFO Repairs 2022
See attachments for full requirement.
Amendment A001 Posted_04/24/2025
Bid Summary Posted_04/29/2025
Bid Tabulation Posted_04/30/2025
Update #3 ·
WFL Project WA ERFO NPS OLYM 2022-1 (1), Olympic NPS ERFO Repairs 2022
See attachments for full requirement.
Amendment A001 Posted_04/24/2025
Bid Summary Posted_04/29/2025
Update #2 ·
WFL Project WA ERFO NPS OLYM 2022-1 (1), Olympic NPS ERFO Repairs 2022
See attachments for full requirement.
Amendment A001 Posted_04/24/2025
Update #1 ·
WFL Project WA ERFO NPS OLYM 2022-1 (1), Olympic NPS ERFO Repairs 2022
See attachments for full requirement.
Files
Show all 11
Notice history
| Notice | Type | Posted |
|---|---|---|
| WA erfo NPS olym 2022‐1 (1), olympic NPS erfo repairs 2022 | Award Notice | |
| This notice | Solicitation | |
| WA erfo NPS olym 2022‐1 (1), olympic NPS erfo repairs 2022 | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| WA ERFO NPS OLYM 2022-1(3), OLYMPIC NPS ERFO REPAIRS 2022 Road 107 MP 0.3 TO 0.5 & MP 0.8 | Federal Highway Administration | No set-aside | |
| WA NP OLYM 12(8), Hurricane Ridge Rockfall Mitigation MP 9.4 | Federal Highway Administration | Total Small Business | |
| Acadia National Park | Federal Highway Administration | Total Small Business | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity