This document is an Amendment (A001) to a federal solicitation for the Olympic National Park Emergency Relief for Federally Owned (ERFO) Repairs project. The amendment modifies several key sections of the original solicitation, including contract clauses and special contract requirements for turf establishment. Significant changes include revising the contract completion date to 09/03/2025, updating seed application methods, and specifying detailed requirements for hydraulic seeding techniques.
The amendment provides specific technical guidance for turf establishment, such as using hydraulic-type equipment to apply seed at 12.5 pounds of live seed per slurry unit, applying organic slow-release fertilizer with a low nitrogen N-P-K ratio of 7-2-1, and using bonded fiber mulch and biotic soil amendment at prescribed rates. The contractor will receive seed from Olympic National Park to be applied between May 1 and October 15, with precise application instructions including mixing requirements, application techniques, and environmental considerations for slope stabilization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A001 04/24/2025 N/A See Box 14
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056725B000006
9B. DATED (SEE ITEM 11)
03/28/2025
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A
N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
(__ ) is extended, ( x ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D OTHER (Specify type of modification and authority)
N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
WA ERFO NPS OLYM 2022-1 (1), Olympic NPS ERFO Repairs 2022
See page 2.
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Amendment No. A001, dated 04-24-2025 WA ERFO NPS OLYM 2022-1 (1)
Solicitation No. 69056725B000006 Olympic NPS ERFO Repairs 2022
REVISIONS ARE AS FOLLOWS:
CONTRACT CLAUSES
Page C-23. Revises FAR Clause 52.211-10 Commencement, Prosecution, and
Completion of Work (Apr 1984) Alternate I (Apr 1984).
SPECIAL CONTRACT REQUIREMENTS
Page F-10, Section 625, Turf Establishment. Revises Subsections 625.02, 625.03 and
625.07A.
Page F-11, Section 625, Turf Establishment. Revises Subsections 625.07A and 625.08.
ENCLOSURES
Pages:
C-23
F-10 through F-11
C-23
(c) The Contractor will receive notification when the Government posts new information to the Contractor’s record.
(1) If the Contractor asserts in writing within 7 calendar days, to the Government official who posted the information, that some of the information posted to the non-public segment of FAPIIS is covered by a disclosure exemption under the Freedom of Information Act, the Government official who posted the information must within 7 calendar days remove the posting from FAPIIS and resolve the issue in accordance with agency Freedom of Information procedures, prior to reposting the releasable information. The contractor must cite 52.209-9 and request removal within 7 calendar days of the posting to FAPIIS.
(2) The Contractor will also have an opportunity to post comments regarding information that has been posted by the Government. The comments will be retained as long as the associated information is retained, i.e., for a total period of 6 years. Contractor comments will remain a part of the record unless the Contractor revises them.
(3) As required by section 3010 of Pub. L. 111-212, all information posted in FAPIIS on or after April 15, 2011, except past performance reviews, will be publicly available.
(d) Public requests for system information posted prior to April 15, 2011, will be handled under Freedom of Information Act procedures, including, where appropriate, procedures promulgated under E.O. 12600.
52.209-10 – Prohibition on Contracting With Inverted Domestic Corporations (Nov 2015)
(a) Definitions. As used in this clause-- “Inverted domestic corporation means a foreign incorporated entity that meets the definition of an inverted domestic corporation under 6 U.S.C. 395(b), applied in accordance with the rules and definitions of 6 U.S.C. 395(c).
“Subsidiary” means an entity in which more than 50 percent of the entity is owned—
(1) Directly by a parent corporation; or
(2) Through another subsidiary of a parent corporation.
(b) If the contractor reorganizes as an inverted domestic corporation or becomes a subsidiary of an inverted domestic corporation at any time during the period of performance of this contract, the Government may be prohibited from paying for Contractor activities performed after the date when it becomes an inverted domestic corporation or subsidiary. The Government may seek any available remedies in the event the Contractor fails to perform in accordance with the terms and conditions of the contract as a result of Government action under this clause.
(c) Exceptions to this prohibition are located at 9.108-2.
(d) In the event the Contractor becomes either an inverted domestic corporation, or a subsidiary of an inverted domestic corporation during contract performance, the Contractor shall give written notice to the Contracting Officer within five business days from the date of the inversion event.
52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) Alternate I (Apr 1984)
The Contractor shall be required to (a) commence work under this contract within 10 calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 09/29/2025 09/03/2025 subject to such extensions as may be authorized. The time stated for completion shall include final cleanup of the premises.
The completion date is based on the assumption that the successful offeror will receive the notice to proceed by 06/09/2025. The completion date will be extended by the number of calendar days after the above date that the contractor receives the notice to proceed, except to the extent that the delay in issuance of the notice to proceed results from the failure of the contractor to execute the contract and give the required performance and payment bonds within the time specified in the offer.
Revised by Amendment A001
Contract Clauses Project: WA ERFO NPS OLYM 2022-1 (1), Olympic NPS ERFO Repairs 2022
F-10 DIVISION 600
Special Contract Requirements Project: WA ERFO NPS OLYM 2022-1 (1), Olympic NPS ERFO Repairs 2022
Section 625. — TURF ESTABLISHMENT
08/01/14–FP14
Materials
625.02 Add the following:
Biotic Soil Amendment 713.22 715.22
Construction Requirements
625.03 General. Delete the text of this Subsection and substitute the following:
Seed will be furnished by Olympic National Park and applied by the contractor between May 1 and October 15. At least 20 days before starting seeding operations, obtain Government-provided seed according to Subsection 105.02(b).
Apply Turf Establishment Mixture in one application using hydraulic-type equipment according to Subsection 625.07A(b).
625.06 Fertilizer. Delete this Subsection.
625.07 Seeding. Delete this Subsection.
625.07A Turf Establishment, Hydraulic Method. (Added Subsection).
Apply the seed at the rate of 12.5 pounds of live seed per slurry unit.
Apply organic slow-release fertilizer in the hydroseed mix to aid in the establishment of vegetation.
A low nitrogen fertilizer with an N-P-K ratio of 7-2-1 or equivalent will be used that favors native plant establishment over establishment of non-native weedy species.
(a) Turf establishment mixture. The permanent turf Turf establishment mixture is composed of the following components:
Table 625-1 Turf Establishment Mixture
Component Application Rate
Seed 12.5 pounds of live seed per slurry unit
Bonded fiber mulch (BFM) with 9-month minimum life conforming to Subsection 625.08
475 pounds per slurry unit (includes tracer as recommended by the manufacturer)
Biotic Soil Amendment (BSA) conforming to Subsection 713.23
1250 pounds per slurry unit
F-11 DIVISION 600
Special Contract Requirements Project: WA ERFO NPS OLYM 2022-1 (1), Olympic NPS ERFO Repairs 2022
(b) Equipment. Use hydro-type equipment capable of providing a uniform application using water as the carrying agent. Do not use hydro-type equipment with gear driven pumps, which can damage the seed. Equipment must be capable of reaching cut slopes a minimum of 100 feet high. Seed areas inaccessible to seeding equipment by hand.
(c) Application. Do not blend soil amendments before placing in the hydro-type equipment.
Mix and apply the slurry mixture products in accordance with the manufacturer’s recommendations. Apply the slurry mixture within 30 minutes of adding the seed to the slurry mixture. Apply in two applications placing no more than 50 percent of the mixture at any one application. Adjust application rate to avoid sloughing or washing away the mixture on steep slopes. Apply from opposite directions, to ensure the highest level of coverage, effectiveness, and performance. Moisten stabilization areas prior to applying the slurry mixture but do not apply slurry mixture during periods of excessive rainfall.
Apply mulch in a separate application from the seed using hydraulic-type equipment according to Subsection 625.07A(a).
Apply compost conforming to subsection 713.05(e) as topdressing by blower or other appropriate method at a rate 1 to 2 inches in depth.
625.08 Mulching. Delete this Subsection.
625.10 Acceptance. Add the following:
Compost for turf establishment will be evaluated under Subsection 106.02, 106.03, and 106.04.