wa-ep-olym2022-1--1_control-points.xlsx

XLSX spreadsheet 41 KB Posted

Attached to
WA ERFO NPS OLYM 2022‐1 (1), OLYMPIC NPS ERFO REPAIRS 2022
Solicitation number
69056725B000006
Issued by

About this file

This Excel file contains survey control point data for the WA ERFO NPS OLYM 2022-1(1) project, a National Park Service (NPS) Emergency Relief for Federally Owned (ERFO) Repairs project at Big Creek Culvert. The document specifies precise geospatial survey information including six control points with detailed coordinate data, using the Washington North State Plane Coordinate System (NAD83 2011) and vertical datum NAVD88 GEOID18. The survey was conducted in April 2023, with final adjustments made on 4/18/2023, and uses international foot units for project measurements. Each control point is marked with specific identifiers (23201-23206) and includes state plane coordinates, geographic coordinates, elevations, combined factors, and physical marker descriptions such as "5/8" iron rod with FHWA aluminum cap" or "hub & tack".

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Information

Information
1.This file transfers the Survey Control point list (in Excel format) to an Excel plan sheet. Open the point list files in Excel. Select the tab at the bottom of the worksheet and drag it to this spreadsheet. It will become a new tab. Place the name of this tab in the "Data Location" block below. The Survey Control point list will appear.
2.If extra sheets are needed, copy the original plan sheet by holding the left mouse button on the worksheet's tab (below) and hold the <CTRL>key. A mini sheet with a plus sign should appear. Drag this and drop it to the desired location.
Common Sheet Information
Insert the following values. They will appear on every sheet.
State:Note: If there is more than one project number, use <ALT><ENTER> to insert page break for additional lines.
Project:WA ERFO NPS OLYM 2022-1(1)
NPS PMIS /

Drawing No:

Designed by:WFLHD_Survey
Date:1/1904
Checked by:WFLHD_Survey
Date:1/1904
First sheet #:D.11.0
Title block text:SURVEY CONTROL
Show Totals?TRUE
Data location:Page 1Worksheet found
Data begins in col:A
Min. rows/table53.0
Base sheet name:Sheet6rows w/dataOK - no spaces in data
Max. row/table406data rowsWarnings:
40rows/table
PROJECT :NPS ERFO Repairs 2022 Big Creek Culvert

DATE OF FIELD WORK :April 2023

DATE OF FINAL ADJUSTMENT :4/18/2023

COORDINATE SYSTEM : Washington North SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.0000

CADD COORDINATE SYSTEM :WA83/2011-NIF NSRS11(NAD83/2011) Washington, North Zone, International foot

PROJECT UNITS : International Foot

Sheet Names
Input the names of the worksheets in the order you would like the sheets numbered.
Worksheet NameSheetHeader rowSheet NumberNotes
SheetD.131OK
Sheet (2)UndefinedFALSE1
Sheet (3)UndefinedFALSE1
Sheet (4)UndefinedFALSE1
Sheet (5)UndefinedFALSE1
Sheet (6)UndefinedFALSE1
Sheet (7)UndefinedFALSE1
Sheet (8)UndefinedFALSE1
Sheet (9)UndefinedFALSE1
Sheet (10)UndefinedFALSE1
Sheet (11)UndefinedFALSE1
Sheet (12)UndefinedFALSE1
Sheet (13)UndefinedFALSE1
Sheet (14)UndefinedFALSE1
Sheet (15)UndefinedFALSE1
Sheet (16)UndefinedFALSE1
Sheet (17)UndefinedFALSE1
Sheet (18)UndefinedFALSE1
Sheet (19)UndefinedFALSE1
Sheet (20)UndefinedFALSE1
Total Sheets:10sheets missing

Revised: 15 June 2015

Sheet

Sheet Information
Sheet num:D.1Filename0
Sheet name:Sheetc:\pw-work\d0602870\[Big_Creek_controlsheet.xlsx]Sheet
Reference:Time
21-Jan-2025 2:44 PM
Begin Column:ABCDEFGHI

PROJECT :NPS ERFO Repairs 2022 Big Creek Culvert DATE OF FIELD WORK :April 2023 DATE OF FINAL ADJUSTMENT :4/18/2023 COORDINATE SYSTEM : Washington North SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.0000

CADD COORDINATE SYSTEM :WA83/2011-NIF NSRS11(NAD83/2011) Washington, North Zone, International foot PROJECT UNITS : International Foot

STATE PLANE COORDINATESGEO COORDINATES
3.0POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTIONNOTE:
23201209267.514918303.871279.62247°32'09.896004"N123°45'26.485172"W208.64360.99998349695/8" ir w/fhwa alum cap1.To precisely check distances between points as measured on the ground, inverse the state plane coordinates and divide the computed distance by a mean combined factor of the two points.
23202209359.933918542.561278.64047°32'10.896932"N123°45'23.060215"W207.69160.99998349365/8" ir w/fhwa alum cap
23203209409.701918737.123279.71347°32'11.460665"N123°45'20.254279"W208.7750.9999834143hub&tack
23204209437.137918877.078278.96547°32'11.783678"N123°45'18.231237"W208.03410.9999834339hub&tack
23205209460.958919079.808279.15547°32'12.094541"N123°45'15.291968"W208.23370.99998340925/8" ir w/fhwa alum cap
23206209535.536919396.157281.46647°32'12.948496"N123°45'10.726061"W210.56090.99998325645/8" ir w/fhwa alum cap
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000
00.0000.0000.000000

PROJECT :NPS ERFO Repairs 2022 Big Creek Culvert DATE OF FIELD WORK :April 2023

DATE OF FINAL ADJUSTMENT :4/18/2023

COORDINATE SYSTEM : Washington North SPCS NAD83 2011 VERTICAL DATUM : Orthometric elevations based on the NAVD88 GEOID18

EPOCH DATE : 2010.0000

CADD COORDINATE SYSTEM :WA83/2011-NIF NSRS11(NAD83/2011) Washington, North Zone, International foot

PROJECT UNITS : International Foot

PROJECT COORDINATESGEO COORDINATES
POINT
NUMBERNORTHEASTELEVATIONLATITUDELONGITUDEELLIPSOID
HEIGHTCOMBINED
FACTORDESCRIPTION
23201209267.514918303.871279.62247°32'09.896004"N123°45'26.485172"W208.6440.999983505/8" ir w/fhwa alum cap
23202209359.933918542.561278.64047°32'10.896932"N123°45'23.060215"W207.6920.999983495/8" ir w/fhwa alum cap
23203209409.701918737.123279.71347°32'11.460665"N123°45'20.254279"W208.7750.99998341hub&tack
23204209437.137918877.078278.96547°32'11.783678"N123°45'18.231237"W208.0340.99998343hub&tack
23205209460.958919079.808279.15547°32'12.094541"N123°45'15.291968"W208.2340.999983415/8" ir w/fhwa alum cap
23206209535.536919396.157281.46647°32'12.948496"N123°45'10.726061"W210.5610.999983265/8" ir w/fhwa alum cap