Ventilated Enclosure/Paint Booth
Closed Solicitation Posted
- Solicitation number
- W911SG24Q0074
- Agency
- MICC Fort Hood Mission and Installation Contracting Command, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 333413 Industrial and Commercial Fan and Blower and Air Purification Equipment Manufacturing
- PSC
- 4460 Air Purification Equipment
- Place of performance
- Fort Bliss, Texas 79916, United States
- Points of contact
-
- Joseph Flores joseph.a.flores.civ@army.mil (915) 568-7870
- Major Alan Lambert alan.r.lambert4.mil@army.mil (520) 944-3856
Notice details come from SAM.gov. Updated .
About this opportunity
The Department of the Army Materiel Command Mission and Installation Contracting Command at Fort Hood is seeking to procure an air filtration system in the form of a ventilated enclosure or paint booth. The key requirements include an exhaust system with a minimum airflow of 18,000 CFM, multi-stage particulate filtration, a cross-draft negative enclosure, and fire suppression. The system must meet specific design criteria based on ACGIH and ANSI/ASSP standards for cross-sectional airflow velocities. The government will award a firm-fixed-price contract to the responsible offeror whose technically acceptable offer has the lowest evaluated price. Offers are due by July 8, 2024.
This is a small business set-aside acquisition. The ventilated enclosure/paint booth system will be used primarily for removing chemical agent resistant coating (CARC) paint and primer from helicopter components at the Fort Hood facility in El Paso, Texas. The recommended size of the enclosure is 10'H x 18'W x 45'L, with an 18-month supply of replacement filters and 8 lighting fixtures of 10,000 lumens each included. The contract will include a 5-year warranty.
Notice text
2 versions
Update #2 · Latest ·
Product Description
AIR FILTRATION SYSTEM REQUIREMENTS
(VENTILATED ENCLOSURE/PAINT BOOTH)
Many ventilation systems exist and could potentially be used to control the Cr(VI) hazard during aviation maintenance processes. Selection should be done in collaboration with Industrial Hygiene and Safety professionals to ensure the ventilation system meets minimum design criteria.
Defense Centers for Public Health-Aberdeen recommends the following minimum design criteria:
• American Conference of Governmental Hygienists (ACGIH)® Industrial Ventilation Manual Figure VS-75-01 Large Paint Booth: Minimum cross-sectional velocity of 100 feet per minute (fpm) for a large deep booth with a cross-sectional area greater than 150 square feet (ft2). Airless electrostatic and high velocity low pressure spray paint operations require an air velocity of 100 fpm.
• ACGIH® Industrial Ventilation Manual Figure VS-80-01 Abrasive Blasting Room: Cross-sectional minimum velocity of 100 fpm. • American National Standards Institute/American Society of Safety Professionals (ANSI/ASSP) Z9.4-201 I (R2021): Requires a cross-sectional velocity of 100 fpm.
Exhaust System
- 18,000 Cubic Feet per Minute or higher to achieve ACGIH recommended TLVs
- Must verify accurate testing and sampling data that system will provide clean air below the ACGIH TLVs of 0.0002mg/m3
- Multi-stage Particulate filtration exceeds the National Emission Standards for Hazardous Air Pollutants (NESHAP) 319 to ensure Soldiers working outside of the enclosure are not exposed to hexavalent chromium levels in excess of .0002mg/m3.
Enclosure
- Enclosure must be Cross Draft Negative
- Material NFPA 701 Compliant
- Recommend size: 10’H X 18’W X 45”L (based on hangar size and unit requirements)
Fire Suppression
- Dry Chemical to protect both the enclosure and exhaust
- Pre-engineered meeting NFPA 17 Standard for Dry Chemical extinguishing
Replacement Filters
- 18 Month Supply
Lighting
- Eight (8) Lights: 10,000 lumens per light
Warranty
- 5-year warranty
Update #1 ·
Product Description
AIR FILTRATION SYSTEM REQUIREMENTS (VENTILATED ENCLOSURE/PAINT BOOTH)
Many ventilation systems exist and could potentially be used to control the Cr(VI) hazard during aviationmaintenance processes.Selection should be done in collaboration with Industrial Hygiene and Safety professionals to ensure the ventilation system meets minimum design criteria.
Defense Centers for Public Health-Aberdeen recommends the following minimum design criteria:
• American Conference of Governmental Hygienists (ACGIH)® Industrial Ventilation Manual Figure VS-75-01 Large Paint Booth: Minimum cross-sectional velocity of 75 feet per minute (fpm) for a large deep booth with a cross-sectional area greater than 150 square feet (ft2). Airless electrostatic and high velocity low pressure spray paint operations require an air velocity of only 60 fpm.
• ACGIH® Industrial Ventilation Manual Figure VS-80-01 Abrasive Blasting Room: Cross-sectional velocity range of 60-100 fpm.
• American National Standards Institute/American Society of Safety Professionals (ANSI/ASSP) Z9.4-201 I (R2021): Requires a cross-sectional velocity of 80 fpm.
Exhaust System
- 18,000 Cubic Feet per Minute or higher to achieve ACGIH recommended TLVs
- Must verify accurate testing and sampling data that system will provide clean air below the ACGIH TLVs of 0.0002mg/m3
- Exhaust air to be “RETURNED TO BUILDING” as per ANSI Z9.7 (NO ADDITIONAL VENTILATION REQUIREMENTS TO EXISTING STRUCTURES)
- Multi-stage Particulate filtration exceeds the National Emission Standards for Hazardous Air Pollutants (NESHAP) 319
Enclosure
- Enclosure must be Cross Draft Negative
- Material NFPA 701 Compliant
- Recommend size: 10’H X 18’W X 45”L (based on hangar size and unit requirements)
Fire Suppression
- Dry Chemical to protect both the enclosure and exhaust
- Pre-engineered meeting NFPA 17 Standard for Dry Chemical extinguishing
Replacement Filters
- 18 Month Supply
Lighting
- Eight (8) Lights: 10,000 lumens per light
Warranty
- 5-year warranty
Attachments
| File | Type | Posted |
|---|---|---|
| W911SG24Q0074 0003 Conformed.pdf | ||
| W911SG24Q0074 0003 Amendment.pdf | ||
| W911SG24Q0074 0002 Amendment.pdf | ||
| W911SG24Q0074 0002 Conformed.pdf | ||
| Vendor Questions with Answers (Updated 6.27.24).docx | DOCX document | |
| W911SG24Q0074001 Conformed.pdf | ||
| W911SG24Q0074 001 Amendment.pdf | ||
| booth location.pdf | ||
| Vendor Questions with Answers.docx | DOCX document | |
| W911SG24Q0074 (Ventilation Paint System).pdf |
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity