UT FLAP WEB 10(1) Causey Plans Flat.pdf
PDF 44 MB Posted
- Attached to
- UT FLAP WEB 10(1) Causey Reservoir Access Federal contract opportunity
- Solicitation number
- 6982AF25B000014
About this file
This document is a Summary of Quantities for the UT FLAP WEB 10(1) Causey Reservoir Access project, detailing a federal highway improvement project in Weber County, Utah. The project involves road reconstruction and improvements on multiple roads (Causey Road, Wheat Grass Canyon Road, and Skull Crack Road) with four distinct work schedules: Schedule A (4R improvements on 0.65 miles), Option X (Beaver Creek structure replacement), Option Y (4R improvements on 0.56 miles), and Option Z (3R improvements on 1.39 miles).
The project, managed by the Department of Transportation Federal Highway Administration, is set for full and open competition with a HUBZone price preference. Key technical elements include roadway realignment, intersection improvements, mechanically stabilized earth walls, pavement reconstruction, drainage structures, guardrail installations, traffic control, and environmental mitigation. The work ranges from roadway excavation and asphalt concrete pavement to specialized tasks like survey control, erosion control, and streambed material placement. The project location is in mountainous terrain with elevations between 5,464.75 and 5,779.21 feet, and all road closures must be coordinated with the Boy Scouts of America.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| PRE-SOLICITATION UT FLAP WEB 10(1).pdf | ||
| UT FLAP WEB 10(1) Causey Reservoir Access SCRs.pdf | ||
| PRE-SOLICITATION UT FLAP WEB 10(1).pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CURTIS R SCOTT
Digitally signed by CURTIS R
SCOTT
Date: 2025.08.28 14:49:19 -06'00'
Sheet and Description
B9 B11 B12 B13-B18 S1-S3
Grading Summary
Surfacing Summary
Drainage Summary
Miscellaneous Summary S Sheets BID
SCHEDULE
A0100 15101-0000 MOBILIZATION LPSM ALL
A0120 15214-2000 SURVEY AND STAKING, RETAINING WALL LPSM ALL
A0140 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 5 5
A0160 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 0.654 0.654
A0180 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 1.308 1.308
A0200 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
A0220 15401-0000 CONTRACTOR TESTING LPSM ALL
A0240 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
A0260 15701-0000 SOIL EROSION CONTROL LPSM ALL
A0280 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
A0300 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
A0320 20101-0000 CLEARING AND GRUBBING ACRE 5.48 0.52 6
A0340 20301-1900 REMOVAL OF PIPE CULVERT EACH 4 4
A0360 20301-2400 REMOVAL OF SIGN EACH 2 2
A0380 20302-0700 REMOVAL OF FENCE LNFT 228 12 240
A0400 20302-1200 REMOVAL OF GUARDRAIL LNFT 2868 147 3015
A0420 20401-0000 ROADWAY EXCAVATION CUYD 14560 740 15300
A0440 21101-2000 ROADWAY OBLITERATION, METHOD 2 SQYD 138 17 155
A0460 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2 CUYD 3.9 206.2 24.9 235
A0480 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 CUYD 31.2 2.8 34
A0500 25120-2200 RIPRAP DITCH, METHOD B, CLASS 2 LNFT 560 60 620
A0520 25125-0000 BOULDER EACH 56 9 65
A0540 25501-0000 MECHANICALLY STABILIZED EARTH WALL SQFT 4800 240 5040
A0560 25701-0000 CONTRACTOR FURNISHED WALL DESIGN LPSM ALL
A0580 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 2669 136 2805
A0600 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1695 50 1745
A0620 40601-0000 FOG SEAL TON 3.4 0.1 3.5
A0640 41102-1000 PRIME COAT, METHOD 1 SQYD 7195 360 7555
A0660 41105-0000 BLOTTER TON 11.7 0.3 12
A0680 41201-0000 TACK COAT TON 3.4 0.1 3.5
A0700 60201-0800 24-INCH PIPE CULVERT LNFT 164 8 172
A0720 60201-1000 36-INCH PIPE CULVERT LNFT 98 7 105
A0740 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 4 4
A0760 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 4 4
A0780 60212-0800 ELBOW, 24-INCH EACH 2 2
A0800 60404-0000 CATCH BASIN EACH 2 2
A0820 60602-0700 PIPE ANCHOR ASSEMBLY, 24-INCH EACH 2 2
A0840 60901-0200 CURB, CONCRETE, 4-INCH DEPTH LNFT 574 31 605
A0860 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 2084 106 2190
A0880 60908-1000 PAVED DITCH, ASPHALT SQYD 869 46 915
PAY ITEM
NUMBER
LINE
ITEM
NO.
N
U T\ w eb
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
U
T_ W
EB
_F
LA
P_
_1
_S O
Q _1
_0 8_
_2
5.
xl sm ]S he et
-A ug -2
6:
P M
A M E N D
SUMMARY OF QUANTITIES - Schedule A
Milestone: 100% Estimate Date Completed: 08/27/25 Report Date: 08/27/25
Remarks and/or Determination of Estimated Quantity
Estimated Quantities
ALLOWANCEUNITPAY ITEM DESCRIPTION
PROJECT
B1UT WEB 10(1)
CAUSEY RESERVOIR ACCESS
SHEET
NUMBER
Grading Summary
Surfacing Summary
Drainage Summary
Miscellaneous Summary S Sheets BID
SCHEDULE
A0900 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LNFT 2862.5 87.5 2950
A0920 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 5 5
A0940 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 20
A0960 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH HOUR 20
A0980 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 20
A1000 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER HOUR 20
A1020 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 20
A1040 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 20
A1060 62301-0000 GENERAL LABOR HOUR 40
A1100 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 40
A1120 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES,(BIOLOGIST) LPSM ALL
A1140 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 3.28 0.16 3.44
A1160 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 2.72 0.28 3
A1180 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 2.72 0.28 3
A1200 62901-1200 ROLLED EROSION CONTROL PRODUCT, TYPE 5.A SQYD 40 2 42
A1220 63301-0000 SIGN SYSTEM EACH 9 1 10
A1240 63308-2000 OBJECT MARKER, TYPE 2 EACH 10 2 12
A1260 63308-3000 OBJECT MARKER, TYPE 3 EACH 2 1 3
A1280 63316-1000 REMOVE AND RESET SIGN EACH 1 1 2
A1300 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 2.62 0.38 3
A1320 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR LPSM ALL
A1340 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 8 8
A1360 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 100 100
A1380 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 25 25
A1400 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 12 12
A1420 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 700 700
A1440 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN SQFT 700 700
A1460 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 2400 2400
A1480 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 1200 1200
A1500 63701-0000 FIELD OFFICE EACH 1
A1520 65105-0000 TEMPORARY ROCKFALL PROTECTION LPSM ALL
ALLOWANCE
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
N
U T\ w eb
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
U
T_ W
EB
_F
LA
P_
_1
_S O
Q _1
_0 8_
_2
5.
xl sm ]S he et
2)
SUMMARY OF QUANTITIES - Schedule A
A M E N D
LINE
ITEM
NO.
-A ug -2
6:
P M
Milestone: 100% Estimate Date Completed: 08/27/25 Report Date: 08/27/25
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B2UT WEB 10(1)
CAUSEY RESERVOIR ACCESS
Grading Summary
Surfacing Summary
Drainage Summary
Miscellaneous Summary S Sheets BID
SCHEDULE
X0100 15101-0000 MOBILIZATION LPSM ALL
X0120 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 0.045 0.045
X0140 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 1 1
X0160 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
X0180 15401-0000 CONTRACTOR TESTING LPSM ALL
X0200 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
X0220 15701-0000 SOIL EROSION CONTROL LPSM ALL
X0240 20101-0000 CLEARING AND GRUBBING ACRE 0.35 0.05 0.4
X0260 20301-0300 REMOVAL OF BOX CULVERT EACH 1 1
X0280 20301-2400 REMOVAL OF SIGN EACH 1 1 2
X0300 20302-0700 REMOVAL OF FENCE LNFT 135 10 145
X0320 20303-1600 REMOVAL OF PAVEMENT, ASPHALT SQYD 1227 63 1290
X0340 20815-0000 COFFERDAMS LPSM ALL
X0360 20820-0000 DEWATERING LPSM ALL
X0380 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2 CUYD 6.7 1.3 8
X0400 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 CUYD 69.1 75 5.9 150
X0420 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 354 16 370
X0440 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 115 3 118
X0460 40301-0200 ASPHALT CONCRETE PAVEMENT, TYPE 2 TON 115 3 118
X0480 40601-0000 FOG SEAL TON 0.3 0.1 0.4
X0500 41102-1000 PRIME COAT, METHOD 1 SQYD 587 33 620
X0520 41105-0000 BLOTTER TON 0.9 0.1 1
X0540 41201-0000 TACK COAT TON 0.3 0.1 0.4
X0560 60220-0000 PRECAST REINFORCED CONCRETE BOX CULVERT LNFT 36 36
X0580 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LNFT 125 25 150
X0600 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 4 4
X0620 61901-0000 FENCE LNFT 115 10 125
X0640 61920-2000 REMOVE AND RESET GATE EACH 1 1
X0660 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 10
X0680 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH HOUR 10
X0700 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 10
X0720 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER HOUR 10
X0740 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 10
X0760 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 10
X0780 62301-0000 GENERAL LABOR HOUR 10
X0800 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 10
X0820 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES,(BIOLOGIST) LPSM ALL
X0840 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.22 0.08 0.3
X0860 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.22 0.08 0.3
X0880 63301-0000 SIGN SYSTEM EACH 1 1 2
ALLOWANCE
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
N
U T\ w eb
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
U
T_ W
EB
_F
LA
P_
_1
_S O
Q _1
_0 8_
_2
5.
xl sm ]S he et
3)
SUMMARY OF QUANTITIES - Option X
A M E N D
LINE
ITEM
NO.
-A ug -2
6:
P M
Milestone: 100% Estimate Date Completed: 08/27/25 Report Date: 08/27/25
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B3UT WEB 10(1)
CAUSEY RESERVOIR ACCESS
Grading Summary
Surfacing Summary
Drainage Summary
Miscellaneous Summary S Sheets BID
SCHEDULE
X0900 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 4
X0920 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR LPSM ALL
X0940 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 20 20
X0960 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER LNFT 120 120
X0980 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 300 300
X1000 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 249 16 265
ALLOWANCE
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
N
U T\ w eb
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
U
T_ W
EB
_F
LA
P_
_1
_S O
Q _1
_0 8_
_2
5.
xl sm ]S he et
4)
SUMMARY OF QUANTITIES - Option X
A M E N D
LINE
ITEM
NO.
-A ug -2
6:
P M
Milestone: 100% Estimate Date Completed: 08/27/25 Report Date: 08/27/25
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B4UT WEB 10(1)
CAUSEY RESERVOIR ACCESS
Grading Summary
Surfacing Summary
Drainage Summary
Miscellaneous Summary S Sheets BID
SCHEDULE
Y0100 15101-0000 MOBILIZATION LPSM ALL
Y0120 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 3 3
Y0140 15215-5000 SURVEY AND STAKING, BOX CULVERT EACH 1 1
Y0160 15225-0000 SLOPE, REFERENCE, AND CLEARING AND GRUBBING CONTROL MILE 0.581 0.581
Y0180 15236-2000 SURVEY CONTROL, GRADE FINISHING MILE 1.162 1.162
Y0200 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Y0220 15401-0000 CONTRACTOR TESTING LPSM ALL
Y0240 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Y0260 15701-0000 SOIL EROSION CONTROL LPSM ALL
Y0280 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
Y0300 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
Y0320 20101-0000 CLEARING AND GRUBBING ACRE 3.27 0.73 4
Y0340 20301-1900 REMOVAL OF PIPE CULVERT EACH 3 3
Y0360 20301-2400 REMOVAL OF SIGN EACH 4 4
Y0380 20302-1000 REMOVAL OF FENCE, RAIL LNFT 252 13 265
Y0400 20302-1200 REMOVAL OF GUARDRAIL LNFT 2675 135 2810
Y0420 20401-0000 ROADWAY EXCAVATION CUYD 1642 163 1805
Y0440 20820-0000 DEWATERING LPSM ALL
Y0460 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2 CUYD 17 2 19
Y0480 25101-2300 PLACED RIPRAP, METHOD B, CLASS 3 CUYD 59 6 65
Y0500 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4 CUYD 15.6 4.4 20
Y0520 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1894 96 1990
Y0540 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 1207 38 1245
Y0560 40601-0000 FOG SEAL TON 2.9 0.1 3
Y0580 41102-1000 PRIME COAT, METHOD 1 SQYD 6682 333 7015
Y0600 41105-0000 BLOTTER TON 9.9 0.6 10.5
Y0620 41201-0000 TACK COAT TON 2.9 0.1 3
Y0640 60103-0000 CONCRETE, HEADWALL,(BOX CULVERT) EACH 2 2 Include Wingwalls
Y0660 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT EACH 1 1
Y0680 60103-0180 CONCRETE, HEADWALL FOR 36-INCH PIPE CULVERT EACH 1 1
Y0700 60201-0800 24-INCH PIPE CULVERT LNFT 94 6 100
Y0720 60201-1000 36-INCH PIPE CULVERT LNFT 50 5 55
Y0740 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 2 2
Y0760 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT EACH 1 1
Y0780 60220-4050 12 FEET SPAN, 8 FEET RISE PRECAST REINFORCED CONCRETE BOX CULVERT LNFT 50 4 54
Y0800 60404-0000 CATCH BASIN EACH 1 1
Y0820 60901-1000 CURB, CONCRETE, 12-INCH DEPTH LNFT 2297 113 2410
Y0840 60908-1000 PAVED DITCH, ASPHALT SQYD 534 26 560
Y0860 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS LNFT 3313 167 3480
Y0880 61702-0000 TERMINAL SECTION EACH 5 5
ALLOWANCE
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
N
U T\ w eb
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
U
T_ W
EB
_F
LA
P_
_1
_S O
Q _1
_0 8_
_2
5.
xl sm ]S he et
5)
SUMMARY OF QUANTITIES - Option Y
A M E N D
LINE
ITEM
NO.
-A ug -2
6:
P M
Milestone: 100% Estimate Date Completed: 08/27/25 Report Date: 08/27/25
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B5UT WEB 10(1)
CAUSEY RESERVOIR ACCESS
Grading Summary
Surfacing Summary
Drainage Summary
Miscellaneous Summary S Sheets BID
SCHEDULE
Y0900 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT EACH 1 1
Y0920 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 10
Y0940 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH HOUR 10
Y0960 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 10
Y0980 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER HOUR 10
Y1000 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 10
Y1020 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 10
Y1040 62301-0000 GENERAL LABOR HOUR 10
Y1060 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 10
Y1080 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 10
Y1100 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES,(BIOLOGIST) LPSM ALL
Y1120 62406-0300 PLACING CONSERVED TOPSOIL, 4-INCH DEPTH ACRE 1.56 0.44 2
Y1140 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 0.92 0.08 1
Y1160 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 0.92 0.08 1
Y1180 62901-1200 ROLLED EROSION CONTROL PRODUCT, TYPE 5.A SQYD 41 2 43
Y1200 63301-0000 SIGN SYSTEM EACH 6 2 8
Y1220 63308-2000 OBJECT MARKER, TYPE 2 EACH 6 2 8
Y1240 63308-3000 OBJECT MARKER, TYPE 3 EACH 7 1 8
Y1260 63316-1000 REMOVE AND RESET SIGN EACH 7 3 10
Y1280 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 2.28 0.32 2.6
Y1300 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR LPSM ALL
Y1320 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
Y1340 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 80 80
Y1360 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 25 25
Y1380 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4
Y1400 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 800 800
Y1420 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 400 400
Y1440 64704-1000 MITIGATION, STREAMBED MATERIAL CUYD 155 10 165
ALLOWANCE
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
N
U T\ w eb
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
U
T_ W
EB
_F
LA
P_
_1
_S O
Q _1
_0 8_
_2
5.
xl sm ]S he et
6)
SUMMARY OF QUANTITIES - Option Y
A M E N D
LINE
ITEM
NO.
-A ug -2
6:
P M
Milestone: 100% Estimate Date Completed: 08/27/25 Report Date: 08/27/25
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B6UT WEB 10(1)
CAUSEY RESERVOIR ACCESS
Grading Summary
Surfacing Summary
Drainage Summary
Miscellaneous Summary S Sheets BID
SCHEDULE
Z0100 15101-0000 MOBILIZATION LPSM ALL
Z0120 15210-3000 CENTERLINE, VERIFICATION AND STAKING MILE 1.391 1.391
Z0140 15215-3000 SURVEY AND STAKING, DRAINAGE STRUCTURE EACH 6 6
Z0160 15301-0000 CONTRACTOR QUALITY CONTROL LPSM ALL
Z0180 15401-0000 CONTRACTOR TESTING LPSM ALL
Z0200 15501-0000 CONSTRUCTION SCHEDULE LPSM ALL
Z0220 15701-0000 SOIL EROSION CONTROL LPSM ALL
Z0240 15720-0000 STORM WATER POLLUTION PREVENTION PLAN LPSM ALL
Z0260 15802-0000 WATERING FOR DUST CONTROL LPSM ALL
Z0280 20101-0000 CLEARING AND GRUBBING ACRE 2.58 0.42 3
Z0300 20301-1900 REMOVAL OF PIPE CULVERT EACH 4 4
Z0320 20402-0000 SUBEXCAVATION CUYD 425 75 500
Z0340 25101-2200 PLACED RIPRAP, METHOD B, CLASS 2 CUYD 7.8 2.2 10
Z0360 25101-2400 PLACED RIPRAP, METHOD B, CLASS 4 CUYD 67.2 7.8 75
Z0380 30202-2000 ROADWAY AGGREGATE, METHOD 2 TON 1409 71 1480
Z0400 30302-1000 DITCH RECONDITIONING LNFT 6597 333 6930
Z0420 30402-5200 FULL DEPTH RECLAMATION, METHOD 2, 4-INCH DEPTH SQYD 489 26 515
Z0440 30402-5500 FULL DEPTH RECLAMATION, METHOD 2, 8-INCH DEPTH SQYD 17470 875 18345
Z0460 40301-0100 ASPHALT CONCRETE PAVEMENT, TYPE 1 TON 3950 119 4069
Z0480 40601-0000 FOG SEAL TON 8.2 0.3 8.5
Z0500 41102-1000 PRIME COAT, METHOD 1 SQYD 18545 927 19472
Z0520 41105-0000 BLOTTER TON 27.6 0.8 28.4
Z0540 41201-0000 TACK COAT TON 8.2 0.3 8.5
Z0560 60103-0140 CONCRETE, HEADWALL FOR 24-INCH PIPE CULVERT EACH 2 2
Z0580 60103-0200 CONCRETE, HEADWALL FOR 42-INCH PIPE CULVERT EACH 2 2
Z0600 60201-0800 24-INCH PIPE CULVERT LNFT 107 3 110
Z0620 60201-1100 42-INCH PIPE CULVERT LNFT 106 4 110
Z0640 60201-1200 48-INCH PIPE CULVERT LNFT 30 4 34
Z0660 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT EACH 2 2
Z0680 60210-1200 END SECTION FOR 48-INCH PIPE CULVERT EACH 2 2
Z0700 62201-0200 DUMP TRUCK, 8 CUBIC YARD MINIMUM CAPACITY HOUR 10
Z0720 62201-0550 BACKHOE LOADER, 6 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 24-INCH WIDTH HOUR 10
Z0740 62201-0950 WHEEL LOADER, 3 CUBIC YARD MINIMUM RATED CAPACITY HOUR 10
Z0760 62201-1450 BULLDOZER, 350HP MINIMUM FLYWHEEL POWER HOUR 10
Z0780 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE HOUR 10
Z0800 62201-3350 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY HOUR 10
Z0820 62301-0000 GENERAL LABOR HOUR 10
Z0840 62302-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES HOUR 10
Z0860 62302-1100 SPECIAL LABOR, HIRED SURVEY SERVICES HOUR 10
Z0880 62510-2000 SEEDING, HYDRAULIC METHOD ACRE 2.58 0.42 3
ALLOWANCE
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
N
U T\ w eb
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
U
T_ W
EB
_F
LA
P_
_1
_S O
Q _1
_0 8_
_2
5.
xl sm ]S he et
7)
SUMMARY OF QUANTITIES - Option Z
A M E N D
LINE
ITEM
NO.
-A ug -2
6:
P M
Milestone: 100% Estimate Date Completed: 08/27/25 Report Date: 08/27/25
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B7UT WEB 10(1)
CAUSEY RESERVOIR ACCESS
Grading Summary
Surfacing Summary
Drainage Summary
Miscellaneous Summary S Sheets BID
SCHEDULE
Z0900 62515-2000 MULCHING, HYDRAULIC METHOD ACRE 2.58 0.42 3
Z0920 63301-0000 SIGN SYSTEM EACH 1 1 2
Z0940 63308-2000 OBJECT MARKER, TYPE 2 EACH 6 2 8
Z0960 63308-3000 OBJECT MARKER, TYPE 3 EACH 4 2 6
Z0980 63402-0300 PAVEMENT MARKINGS, TYPE B, SOLID MILE 5.74 0.26 6
Z1000 63501-1000 TEMPORARY TRAFFIC CONTROL, TRAFFIC CONTROL SUPERVISOR LPSM ALL
Z1020 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3 EACH 4 4
Z1040 63502-0700 TEMPORARY TRAFFIC CONTROL, CONE EACH 150 150
Z1060 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM EACH 25 25
Z1080 63502-1600 TEMPORARY TRAFFIC CONTROL, WARNING LIGHT TYPE B EACH 4 4
Z1100 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER HOUR 1000 1000
Z1120 63506-0600 TEMPORARY TRAFFIC CONTROL, PILOT CAR HOUR 400 400
ALLOWANCE
Estimated Quantities
Remarks and/or Determination of Estimated Quantity
N
U T\ w eb
(1
R oa dw ay
\C A D
D _S he et s\ B -S um m
U
T_ W
EB
_F
LA
P_
_1
_S O
Q _1
_0 8_
_2
5.
xl sm ]S he et
8)
SUMMARY OF QUANTITIES - Option Z
A M E N D
LINE
ITEM
NO.
-A ug -2
6:
P M
Milestone: 100% Estimate Date Completed: 08/27/25 Report Date: 08/27/25
PAY ITEM
NUMBER PAY ITEM DESCRIPTION UNIT
PROJECT
B8UT WEB 10(1)
CAUSEY RESERVOIR ACCESS