UT FLAP SLA 10(1) Mill Creek Canyon Road
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 6982AF24B000015
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Millcreek, Utah, United States
- Points of contact
-
- Douglas Whitcomb cflacquisitions@dot.gov (202) 366-4000
- Laura Slauter cflcontracts@dot.gov (202) 366-4000
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Department of Transportation's Federal Highway Administration is seeking bids for the UT FLAP SLA 10(1) Mill Creek Canyon Road project. The project aims to improve safety, access to recreational opportunities, and protect natural resources along Mill Creek Canyon Road in Utah's Uinta-Wasatch-Cache National Forest. The work involves reconstructing and widening 4.5 miles of the road, improving parking and trailhead areas, and installing drainage improvements and utility infrastructure. Key requirements include clearing and grubbing, extensive earthwork, retaining wall construction, and asphalt paving. Proposals are due by September 19, 2024, and this will be a full and open competition with no set-aside designation.
The estimated project size includes 31.6 acres of clearing and grubbing, 53,500 cubic yards of roadway excavation, 5,500 cubic yards of special rock embankment, 3,100 square feet of rockery retaining wall, 9,000 square feet of soil nail retaining wall, and 25,000 tons of aggregate base. The project does not name any incumbent contractors, and no specific award value or budget range is provided in the notice.
Notice text
THIS IS NOT A REQUEST FOR BID – PLANS AND SPECIFICATIONS ARE NOT AVAILABLE
SOLICITATION TYPE: FULL AND OPEN COMPETITION
PROJECT NUMBER: UT FLAP SLA 10(1)
PROJECT NAME: Mill Creek Canyon Road
PROJECT DESCRIPTION:
Mill Creek Canyon Road provides access to recreational sites in the Uinta-Wasatch-Cache National Forest from 3800 S. Wasatch Boulevard to the Upper Big Water Trailhead. The purpose of the project is to improve safety, improve access to high quality recreational opportunities, and protect the water and wildlife resources through natural resources best practices. Mill Creek Canyon Road is located within Salt Lake County in northern Utah. The majority of the road is located within the Unita-Wasatch-Cache National Forest but is maintained by Salt Lake County.
The project consists of reconstruction and widening of Mill Creek Canyon Road from Big Water Trailhead to Elbow Fork (3.1 miles) to a 20-foot paved width and from Elbow Fork to Winter Gate (1.4 miles) to 24-foot paved width. Improve pertinent picnic area parking and trailhead areas, including, Big Water Trailhead, Alexander Basin, Clover Springs Picnic Area, Fir Crest Picnic Area, Elbow Fork, and Winter Gate (Maple Cove) parking/trailheads.
To complete the proposed widening and realignment, timber removal, rock and soil cuts and fills, profile adjustments, curve widening, ditch reconstruction, retaining walls, culvert replacement, asphalt surfacing, erosion control, singing, and pavement markings are expected. Due to the mountainous terrain, significant boulders and areas with noted seepage or soft subgrade will be encountered. The project also includes drainage improvements consisting of extending existing box culverts with headwalls and wingwalls, replacement of the White Bridge box culvert, installation of a new Mill Creek box culvert, ditch or curb and gutter establishment, vegetated swales, and water quality basins. The project also includes installation of parking area vault toilets and 3-inch diameter electrical conduit and 2-inch diameter communications conduit with pull boxes below the roadway to support future utilities. An estimated eight retaining walls are proposed along the road or at parking areas to stabilize steep slopes and minimize the overall disturbance footprint.
PRINCIPAL WORK ITEMS:
- 20101-0000 Clearing and Grubbing, 31.6 ACRE
- 20401-0000 Roadway Excavation: 53,500 CUYD
- 25201-0000 Special Rock Embankment 5,500 CUYD
- 252201-0000 Rockery (Retaining Wall) 3,100 SQFT
- 25902-0000 Soil Nail Retaining Wall 9,000 SQFT
- 30101-0000 Aggregate Base: 25,000 TON
- 40101-5600 Asphalt Concrete Pavement, Gyratory Mix, ½-Inch or ¾-Inch Nominal Maximum Size Aggregate, 0.3 to <3 Million ESAL: 11,500 TON
- 60201-Various – CMP: 1,425 LNFT
- 60220-0000 Precast Reinforced Concrete Box Culvert: 140 LNFT
- 63501-0000 Temporary Traffic Control: LPSM
ANTICIPATED SCHEDULE:
Advertisement – September 2024
Award – October 2024
NTP – January 2025
Winter Shutdown – November 2025 to April 2026
Contract Completion – October 2026
ESTIMATED COST RANGE:
Schedule A estimated total cost is between $20,000,000 and $30,000,000
NON-MANDATORY PRE-BID SITE VISIT:
Representatives from the Federal Highway Administration (FHWA) will conduct a meeting on Tuesday, October 8, 2024, from 9:00 a.m. to approximately 1:00 p.m. FHWA will provide a brief project presentation, a driving tour stopping at various locations to present design elements along the route and be available to answer questions for the balance of the time period.
Access to the project roadways are not restricted to the public during the site visit, please provide your own transportation and personal protective equipment. Tour stopping locations have limited parking, please consolidate vehicles to the extent practical.
Interested parties will meet at the Maple Grove Picnic Area/Winter Gate of Mill Creek Canyon Road, approximately 4.7 miles east of the intersection of Wasatch Blvd and 3800S (Mill Creek Canyon Road) Mill Creek, UT, at 9:00 a.m.
If you would like to attend the pre-bid meeting, please email to cflcontracts@dot.gov by Friday, October 4, 2024.
Notice history
| Notice | Type | Posted |
|---|---|---|
| UT FLAP SLA 10(1) Mill Creek Canyon Road | Award Notice | |
| UT FLAP SLA 10(1) Mill Creek Canyon Road | Solicitation | |
| This notice | Pre-Solicitation | |
| UT FLAP SLA 10(1) Mill Creek Canyon Road | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| UT NP ARCH 100(2) Bridges on Delicate Arch Road | Federal Highway Administration | No set-aside | |
| GAOA Tony Grove Dam Spillway Capacity & Seismic Mitigation, Uinta/Wasatch/Cache National Forest | Forest Service | Total Small Business | |
| ID FLAP KOOTEN 8450(1), Yellowstone Trail Road, Segment 1 | Federal Highway Administration | No set-aside | |
| BRCA 310427 Southbound Shuttle Stop | National Office | No set-aside | |
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity