UT FLAP 30053(1), Navajo Lake Road

Award Notice Posted

Solicitation number
DTFH6815B00028
Agency
Awarded
to Mel Clark, Inc.
Set-aside
No set-aside

Opportunity facts

Contract number
DTFH6816C00019 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Dixie National Forest (SH14) Cedar City, Utah, United States

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

THIS PROJECT IS ADVERTISED ON A FULL AND OPEN BASIS.
PROJECT DETAILS: UT FLAP 30053(1), Navajo Lake Road

Project Location

The UT FLAP Navajo Lake Road (FSR 30053), is located in Kane County, UT within the boundaries of Dixie National Forest on US Forest Service land. The route begins at a junction with SH14 approximately twenty-six miles east of Cedar City and proceeds 5.7 miles along the south side of the lake to the junction with FSR31762. The road provides access to Navajo Lake, multiple campgrounds and summer residences. Scope of the Work

PROJECT DETAILS: This project Navajo Lake Road (FSR 30053), Schedule A and Option X and Y, project proposes paving 5.7 miles of Navajo Lake Road to provide two 11' travel lanes and 4' shoulders from the intersection of SH14 to Forest Service Road 31762 along with paving four (4) existing pullout locations along the alignment
Type of Construction: roadway excavation, grading, drainage improvements, aggregate base, rockery walls, asphalt paving, erosion control, signing and striping, seeding and mulching, and temporary traffic control.

The contracting range for this project is between $5 million to $7 million.

Update #2 ·

THIS IS NOT AN INVITATION FOR BID, PLANS SPECIFICATIONS ARE CURRENTLY NOT AVAILABLE.  THE TENTATIVE ADVERTISEMENT DATE IS FEBRUARY 10, 2016.  THE PROJECT WILL BE ADVERTISED ON A FULL AND OPEN BASIS.

PROJECT DETAILS: UT FLAP 30053(1), Navajo Lake Road

Project Location

The UT FLAP Navajo Lake Road (FSR 30053), is located in Kane County, UT within the boundaries of Dixie National Forest on US Forest Service land. The route begins at a junction with SH14 approximately twenty-six miles east of Cedar City and proceeds 5.7 miles along the south side of the lake to the junction with FSR31762. The road provides access to Navajo Lake, multiple campgrounds and summer residences. Scope of the Work

PROJECT DETAILS: This project Navajo Lake Road (FSR 30053), Schedule A and Option X and Y, project proposes paving 5.7 miles of Navajo Lake Road to provide two 11' travel lanes and 4' shoulders from the intersection of SH14 to Forest Service Road 31762 along with paving four (4) existing pullout locations along the alignment
Type of Construction: roadway excavation, grading, drainage improvements, aggregate base, rockery walls, asphalt paving, erosion control, signing and striping, seeding and mulching, and temporary traffic control.

The contracting range for this project is between $5 million to $7 million.

Update #1 ·

PROJECT DETAILS: UT FLAP 30053(1), Navajo Lake Road

Project Location

The UT FLAP Navajo Lake Road (FSR 30053), is located in Kane County, UT within the boundaries of Dixie National Forest on US Forest Service land. The route begins at a junction with SH14 approximately twenty-six miles east of Cedar City and proceeds 5.7 miles along the south side of the lake to the junction with FSR31762. The road provides access to Navajo Lake, multiple campgrounds and summer residences. Scope of the Work

PROJECT DETAILS: This project Navajo Lake Road (FSR 30053), Schedule A and Option X and Y, project proposes paving 5.7 miles of Navajo Lake Road to provide two 11' travel lanes and 4' shoulders from the intersection of SH14 to Forest Service Road 31762 along with paving four (4) existing pullout locations along the alignment
Type of Construction: roadway excavation, grading, drainage improvements, aggregate base, rockery walls, asphalt paving, erosion control, signing and striping, seeding and mulching, and temporary traffic control.
It is anticipated that this project will be advertised in November 2015 with construction starting around May 4, 2016 and a completion date of October 9, 2016. The contracting range for this project is between $5 million to $7 million.

Files

File Type Posted
BID_TABS_-_UT_FLAP_30053(1).pdf PDF
Bid_Opening_Summary.pdf PDF
A001.pdf PDF
Q-A _3-2.pdf PDF
NLR_Final_Geotechnical_Report.pdf PDF
DTFH6815B00028.pdf PDF
NLR_Plans_Xsections.pdf PDF
NLR_Plans.pdf PDF
NLR_Final_Pavement_Design_Report.pdf PDF
NLR_Final_Hydraulics_Report.pdf PDF