A001.pdf

PDF 1 MB Posted

Attached to
UT FLAP 30053(1), Navajo Lake Road
Solicitation number
DTFH6815B00028
Issued by

About this file

Amendment A001

View the file

Other files

File Type Posted
BID_TABS_-_UT_FLAP_30053(1).pdf PDF
Bid_Opening_Summary.pdf PDF
Q-A _3-2.pdf PDF
NLR_Final_Geotechnical_Report.pdf PDF
DTFH6815B00028.pdf PDF
NLR_Final_Pavement_Design_Report.pdf PDF
NLR_Plans.pdf PDF
NLR_Plans_Xsections.pdf PDF
NLR_Final_Hydraulics_Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

aaron.sanford Typewritten Text

NOTICE TO BIDDERS

A-iii

Bid Guarantee – Follow the requirements of FAR Clause 52.228-1 Bid Guarantee and Subpart

102.03 of the FP-14. Bid bonds must be originals and have original signatures and corporate seals. Photocopied and faxed copies of bonds will be rejected and cause your bid to be non-responsive.

ATTENTION: Minority, Women-owned, and Disadvantaged Business Enterprises (DBEs). The Department of Transportation (DOT), offers working capital financing and bonding assistance for transportation related contracts. DOT's Bonding Assistance Program (BAP) offers bid, performance and payment bonds on contracts up to $1,000,000. DOT's Short-Term Lending Program (STLP) offers lines of credit to finance accounts receivable. Maximum line of credit is $500,000 with interest at the prime rate. For further information, call (800) 532-1169. Internet address:

http://osdbuweb.dot.gov.

The Contractor is fully responsible to verify that all data is correct when an offer is submitted.

Failure to properly update your data may cause the offer to be rejected.

Request for Technical Information – Questions relative to the plans and SCRs for this solicitation will only be accepted in writing (see Item 9 on Page A-3).

TECHNICAL QUESTIONS REGARDING THIS SOLICITATION WILL NOT BE

ACCEPTED AFTER 4 P.M. ON MARCH 1, 2016

Questions for this solicitation can be submitted to CFLContracts@dot.gov. Questions and answers will be posted at http://www.fbo.gov

Modifications to Bids - Bids may be modified or withdrawn by regular mail, electronic commerce (email) or facsimile, if such notice is received prior to the time specified for receipt of bids. The Government will not be responsible for ANY failure attributable to the transmission or receipt of electronic commerce (email) or facsimile data.

For all modifications, we STRONGLY ENCOURAGE you to resubmit the entire bid schedule with a unit price and amount for every bid item, and a Schedule Total. See FAR Provision 52.214-5, Submission of Bids. Modifications which make the bid ambiguous, indefinite, or uncertain as to any essential requirement of the contract will cause the bid to be rejected as nonresponsive.

FAX Number to submit modifications to bids for this project is (720) 963-336

Email Address to submit modifications to bids for this project is cflcontracts@dot.gov

II. Post Award Information.

Subcontracting - FAR Clause 52.219-8, Utilization of Small Business Concerns states that Prime Contractors afford small business concerns, veteran-owned small business concerns, service-disabled veteran-owned small business concerns, HUBZone small business concerns, small disadvantaged business concerns, and women-owned small business concerns the maximum practicable opportunity to participate in performing contracts let by any Federal agency.

Amendment A001 March 3, 2016 http://osdbuweb.dot.gov/ mailto:CFLContracts@dot.gov http://www.fbo.gov/

C-8

52.204-19 – Incorporation by Reference of Representations and Certifications. (DEC 2014)

The Contractor’s representations and certifications, including those completed electronically via the System for Award Management (SAM), are incorporated by reference into the contract.

(End of clause)

52.209-6 Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (DEC 2010)

52.211-10 Commencement, Prosecution, and Completion of Work. (APR 1984) -

The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the notice to proceed, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than {Refer to Subsection 108.01 of the SCRs}. The time stated for completion shall include final cleanup of the premises.

52.211-12 Liquidated Damages - Construction. (SEP 2000)

(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of (see FP-14 section 108) for each calendar day of delay until the work is completed or accepted.

(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.

52.211-13 Time Extensions. (SEP 2000)

52.211-18 Variation in Estimated Quantity. (APR 1984)

52.214-26 Audit and Records - Sealed Bidding. (OCT 2010)

52.214-27 Price Reduction for Defective Certified Cost or Pricing Data -Modifications - Sealed Bidding. (AUG 2011)

52.214-28 Subcontractor Certified Cost or Pricing Data - Modifications - Sealed Bidding. (OCT 2010)

52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data - Modifications. (OCT 2010)

Amendment A001 March 3, 2016

B9

ROCKERY SUMMARY

AMENDMENT A001

1 3/3/16 Revised station, plastic pipe quantity and notes.

REVISED: March 3, 2016

STATE PROJECT

A

M p w p r o je c tw is e .c h m .c o m D

E N

D o c u m e n ts C

F L

H D T

O

N

A V

A J O L

A K

E R

D

W o r k i n P r o g r e s s N

L R W

I P R o a d w a y C

A D

D S h e e ts B S u m m B

R C

K S u m N

L R .d g n

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

FEDERAL HIGHWAY ADMINISTRATION

U.S. DEPARTMENT OF TRANSPORTATION

REVISED:

DETAIL

U.S. CUSTOMARY DETAIL

DETAIL APPROVED FOR USE

U s e r t p h il li p

NUMBER

SHEET

UT UT FLAP 30053(1)

D

E S I G

N S

U B

M I T

T A

L S e p te m b e r

Untitled
B09_RCKSumNLR.PDF
B09_RCKSumNLR
References
2, PW_WORKDIR:d0365963
NLR_BDR_Master.dgn
Text1:
Text2:
0: 1
1: 5
Text3:
0: A001
1: 3/3/2016
2:
0:
1: UT FLAP 30053(1)
Text4:
0:
0: FEDERAL HIGHWAY ADMINISTRATION

CENTRAL FEDERAL LANDS HIGHWAY DIVISION

12300 WEST DAKOTA AVENUE, SUITE 360

LAKEWOOD, COLORADO 80228

ATTENTION: Joe Wilson 1:

1:
0:
Text6:
0: DTFH6815B00028
1: February 10, 2016
2:
3:
Check Box7:
0: Yes
2: Yes
1:
0:
0: Off
1: Off
2: Off
Check Box9:
1: Off
2: Off
0:
0: Off
1: Off
Text10: 0 *
Text11:
0:
1:
Text12: See Below *
Text13: Invitation for Bid

Remove Page A-iii and replace with attached page A-iii dated March 3, 2016.

Remove Page C-8 and replace with attached page C-8 dated March 3, 2016.

Plan Sheets Remove Plan Sheet B9 and replace with attached Plan Sheet B9 dated March 3, 2016.

Remove Plan Sheet G2 and replace with attached Plan Sheet G2 dated March 3, 2016.

NOTE: When printing revised sheets, turn on 'Document and Markups' in the Print Properties menu to illustrate changes on hard copy print.

*FAILURE TO ACKNOWLEDGE THIS AMENDMENT IN ITEM 19 OF THE SF 1442 BY THE DESIGNATED DATE AND HOUR SPECIFIED IN THE SOLICITATION MAY RESULT IN REJECTION OF YOUR BID (REFER TO SF-1442, PAGE A-2, OF THE SOLICITATION)

Text14:
0:
1:
Text15:
1:
0:
1:
0:
0:
1:
Text16:
0:
1:
Text17:
Text5:
0: 6905001
1:
Check Box1:
0: Yes
1: Off

File details come from the government source that posted it. Updated .