Q-A _3-2.pdf

PDF 114 KB Posted

Attached to
UT FLAP 30053(1), Navajo Lake Road
Solicitation number
DTFH6815B00028
Issued by

View the file

Other files

File Type Posted
BID_TABS_-_UT_FLAP_30053(1).pdf PDF
Bid_Opening_Summary.pdf PDF
A001.pdf PDF
NLR_Final_Geotechnical_Report.pdf PDF
DTFH6815B00028.pdf PDF
NLR_Final_Pavement_Design_Report.pdf PDF
NLR_Plans.pdf PDF
NLR_Plans_Xsections.pdf PDF
NLR_Final_Hydraulics_Report.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DTFH6815B00028 Revised 3/2/16 UT FLAP 30053(1) – Navajo Lake Road

2/19/16

QUESTION #1

The Drawings, sheet C5, C6, C7, C14, C15, and C18 indicate the installation of Class 2 Rip Rap Lined Ditch and to refer to Detail C251-50. However this detail is for the Placed Riprap at Culvert Outlets. Do you have a specific detail for the Riprap Ditch?

Response: See sheet A6.

2/23/16

QUESTION #2

Also is there a water source that will be made available to the contractors? Can we draw from the lake or use the existing 2” water source?

Response: No, Contractor is responsible for providing all water needed for the contract.

2/29/16

QUESTION #3

On sheet B9 Rockery summary note states; “for estimating purposes, it is assumed the majority of the rockeries will be generated from the onsite material.” Is this true? Typically you would see a deduction made on sheet B8 Grading summary to the waste item. Furthermore the final Geotech report does not state or elude to that size and type of rock anywhere on the project. Please advise weather or not the note on B9 is correct and if so what deduction to make to sheet B8 waste item.

Response: Rockery is a unit price item of work. The Contractor may use materials within the Project Right-of-Way that meets the material Specifications or the Contractor may provide the material that meets the material Specifications from offsite sources. There are amounts of rock materials within the Project Right-of-Way that may meet the material Specifications; however, no evaluation of these materials was performed as part of the preliminary design or geotechnical investigations. Potential Bidders can visually observe these materials at the Project site.

3/1/16

QUESTION #4

Will the table 703-3 in the SCR’s be used for all 30101-0000 AGGREGATE BASE line items?

Response: No, Table 703-3 is for Surface Course Aggregate, see Table 703-2.

QUESTION #5

Granular Rock Backdrain (sheet G2) refers to subsection 703.3(c) of the SCR’s. This subsection is not in the SCR’s or the FP-14’s. Please advise.

Response: See amendment A001.

3/2/16

QUESTION #6

The Rockery Summary on sheet B9 seems to have a typo that is affecting all the quantities.

Response: See amendment A001.