USCG station castle hill galley ducting and fan replacement
Closed Solicitation Posted
- Solicitation number
- 37020PR230000077
- Agency
-
Coast Guard
Department of Homeland Security
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 561790 Other Services to Buildings and Dwellings
- PSC
- Z1FD Maintenance Of Dining Facilities
- Place of performance
- Middletown, Rhode Island 02842, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The contractor is required to provide all necessary personnel, equipment, tools, materials, and supervision to remove and replace the existing fan and ducting system at the USCG Station Castle Hill Multi-Mission Building with a code-compliant fan and ducting system. The work includes removal of the existing fan, duct, and exterior vent, installation of new ducting, fabrication of a mount for the new extractor fan, relocation of the junction box, installation of an updraft extractor, and testing for proper operation. The work must be completed within 30 calendar days of contract issuance.
List of products and services to be provided:
- Removal of existing fan, duct, and exterior vent.
- Installation of new double-wall, smoke-tight ducting from hood to exterior wall.
- Fabrication of a mount for new extractor fan on MMB exterior.
- Relocation of junction box for new extractor fan.
- Installation of an updraft extractor on fabricated mount point.
- Testing for proper operation.
- Provision of all necessary personnel, equipment, tools, materials, and supervision.
- Compliance with all federal and state environmental regulations.
- Disposal of removed materials.
- Restoration and clean up of all areas disturbed by construction.
- Provision of warranty for the work performed.
Notice text
PART 1 – GENERAL
SCOPE: The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to remove existing fan and ducting and replace with code compliant fan and ducting in the Multi-Mission Building (MMB).
-
- Work shall include providing all transportation, materials, and labor. The awarded contractor shall complete the following.
-
-
- Remove existing fan, duct, and exterior vent.
- Install new double-wall, smoke-tight ducting from hood to exterior wall.
- Fabricate a mount for new extractor fan on MMB exterior.
- Relocate junction box for new extractor fan.
- Install an updraft extractor on fabricated mount point.
-
1.1.5 Test for proper operation.
SEE SCOPE OF WORK FOR FULL DETAILS
Files
| File | Type | Posted |
|---|---|---|
| SOW_STA_CH_galley_vent (1).pdf | ||
| SF18 REQUEST FOR QUOTATION - REPAIR GALLEY EXHAUST VENTILATION.pdf | ||
| CONSTRUCTION CLAUSES PROVISIONS FAC 2020-08.doc | DOC document | |
| CONSTRUCTION WAGES.txt | TXT text file |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| MXRD 26-0101 Clean HVAC Vents | AFLCMC Hanscom AFB | Total Small Business | |
| Vent Hood Services | Air Combat Command | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity