USCG station castle hill galley ducting and fan replacement

Closed Solicitation Posted

Solicitation number
37020PR230000077
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

Place of performance
Middletown, Rhode Island 02842, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The contractor is required to provide all necessary personnel, equipment, tools, materials, and supervision to remove and replace the existing fan and ducting system at the USCG Station Castle Hill Multi-Mission Building with a code-compliant fan and ducting system. The work includes removal of the existing fan, duct, and exterior vent, installation of new ducting, fabrication of a mount for the new extractor fan, relocation of the junction box, installation of an updraft extractor, and testing for proper operation. The work must be completed within 30 calendar days of contract issuance.

List of products and services to be provided:

  1. Removal of existing fan, duct, and exterior vent.
  2. Installation of new double-wall, smoke-tight ducting from hood to exterior wall.
  3. Fabrication of a mount for new extractor fan on MMB exterior.
  4. Relocation of junction box for new extractor fan.
  5. Installation of an updraft extractor on fabricated mount point.
  6. Testing for proper operation.
  7. Provision of all necessary personnel, equipment, tools, materials, and supervision.
  8. Compliance with all federal and state environmental regulations.
  9. Disposal of removed materials.
  10. Restoration and clean up of all areas disturbed by construction.
  11. Provision of warranty for the work performed.

Notice text

PART 1 – GENERAL

SCOPE:  The Contractor shall provide all personnel, equipment, tools, materials, supervision, and other items and services necessary to remove existing fan and ducting and replace with code compliant fan and ducting in the Multi-Mission Building (MMB).

    1. Work shall include providing all transportation, materials, and labor. The awarded contractor shall complete the following.
      1. Remove existing fan, duct, and exterior vent.
      2. Install new double-wall, smoke-tight ducting from hood to exterior wall.
      3. Fabricate a mount for new extractor fan on MMB exterior.
      4. Relocate junction box for new extractor fan.
      5. Install an updraft extractor on fabricated mount point.

1.1.5    Test for proper operation.

SEE SCOPE OF WORK FOR FULL DETAILS

Files

Similar open opportunities

Opportunity Agency Set-aside Responses due
MXRD 26-0101 Clean HVAC Vents Hanscom AFB, Massachusetts 01731, United States · NAICS 238220 AFLCMC Hanscom AFB Total Small Business
Vent Hood Services Moody AFB, Georgia 31699, United States · NAICS 561790 Air Combat Command Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors