USACE SPK DBB Construction – Public Law (PL) 84-99 Levee Erosion Repair Site 1151-21 - San Joaquin, California
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- W9123822B0008
- Agency
-
ENDIST Sacramento
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Tracy, California 95304, United States
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Sacramento District is soliciting offers for design-bid-build construction services to repair approximately 1,500 feet of levee erosion along the San Joaquin River in Tracy, California. The scope of work includes removing an existing steel fence, clearing vegetation, and constructing a seepage berm with levee fill, geotextiles, filter sand, drain rock and riprap. Additional requirements are dust control, safety meetings, progress meetings, and completion of all work by November 1, 2022. The solicitation was issued on March 16, 2022 with an initial closing date of April 22, 2022 and all documents are available via SAM.gov.
This procurement is set aside for total small business and has a place of performance in Tracy, California. The primary NAICS code is 237990 and PSC code is Z1PB. The government estimates the contract value to be between $5-10 million to repair 1,500 feet of levee at Site 1151-21 along the San Joaquin River, with construction services required from spring through fall 2022. Interested vendors must self-identify through regular checks of SAM.gov for changes to the pre-solicitation notices and interested vendors list.
Notice text
7 versions
Update #7 · Latest ·
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement for Design-Bid-Build (DBB) construction services to provide levee erosion repair in support of the PL 84-99 program at Site 1151-21 in Tracy, CA.
The anticipateds requirement includes repairing 1,500 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, south of Airport Way in Tracy, CA. Construction is anticipated to include removal an existing steel tube fence, clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside of the levee. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. The project is also anticipated to require dust control measures, morning safety meetings, weekly status and progress meetings.
The Government anticipates construction work will be performed in the Spring, Summer, and Fall of 2022. All work must be complete by 01 November 2022.
The solicitation, plans, and specifications are available for inspection without charge when accessed downloaded from this SAM posting.
In accordance with FAR 36.204(g) the magnitude of construction is estimated to be between $5,000,000 and $10,000,000
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this notice.
PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
SAM Posting Amendment 1: 24March2022 Site Visit Agenda and Sign-In Sheet
SAM Posting Amendment 2: Solicitation Amendment 1
- Revised Specification 00 21 13 to remove “best value” references
- Inclusion of Geotechnical Data Report 1151-21 as Attachment 5. Must be requested from CS, Jennifer Wheelis via DoDSAFE
- Revision to Attachment numbering, Geotechnical Data Report is now Attachment 5 and Pre-Award Survey is now Attachment 6.
- Extend ProjNet submission date from 31March2022 to 05April2022.
- Extend Bid due date from 18April2022 to 19April2022.
SAM Posting Amendment 3: Solicitation Amendment 2
1. Extend Bid Submission to Friday 22 April, 2022 at 1000 with Bid Opening at 1330 PST.
2. Replace Attachment 04 with updated CWRD San Joaquin CA20220018 April 1, 2022.
3. Add Attachment 07 Specifications Supplemental (Containing only Changes to Attachment 02 Specification Sections: 01 20 00, 01 50 00, and 31 05 19).
4. Add Attachment 08 Plans Replacement Pages (Containing Attachment 03 Plans replacements to drawing numbers: CD-101, CD-102, C-103, C-104, C-111, C-112, C-301, C-302 C-501).
5. Revises answer to inquiry 9667869: The vineyard referenced will be removed by the landowner, amended specification and drawings will follow on or around 15 April, in a final amendment.
SAM Posting Amendment 4: Solicitation Amendment 3
- Revised Specification Sections 01 20 00 & 31 11 00 to incorporate revised inquiry 9667869 response provided with prior Solicitation Amendment 3
- Updated Construction Wage Rate Determination CA20220018 dated 01April2022.
All other Terms and Conditions remain unchanged.
SAM Posting Amendment 5: Posting of Abstract of Offerors 20220422
Update #6 ·
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement for Design-Bid-Build (DBB) construction services to provide levee erosion repair in support of the PL 84-99 program at Site 1151-21 in Tracy, CA.
The anticipateds requirement includes repairing 1,500 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, south of Airport Way in Tracy, CA. Construction is anticipated to include removal an existing steel tube fence, clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside of the levee. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. The project is also anticipated to require dust control measures, morning safety meetings, weekly status and progress meetings.
The Government anticipates construction work will be performed in the Spring, Summer, and Fall of 2022. All work must be complete by 01 November 2022.
The solicitation, plans, and specifications are available for inspection without charge when accessed downloaded from this SAM posting.
In accordance with FAR 36.204(g) the magnitude of construction is estimated to be between $5,000,000 and $10,000,000
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this notice.
PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
SAM Posting Amendment 1: 24March2022 Site Visit Agenda and Sign-In Sheet
SAM Posting Amendment 2: Solicitation Amendment 1
- Revised Specification 00 21 13 to remove “best value” references
- Inclusion of Geotechnical Data Report 1151-21 as Attachment 5. Must be requested from CS, Jennifer Wheelis via DoDSAFE
- Revision to Attachment numbering, Geotechnical Data Report is now Attachment 5 and Pre-Award Survey is now Attachment 6.
- Extend ProjNet submission date from 31March2022 to 05April2022.
- Extend Bid due date from 18April2022 to 19April2022.
SAM Posting Amendment 3: Solicitation Amendment 2
1. Extend Bid Submission to Friday 22 April, 2022 at 1000 with Bid Opening at 1330 PST.
2. Replace Attachment 04 with updated CWRD San Joaquin CA20220018 April 1, 2022.
3. Add Attachment 07 Specifications Supplemental (Containing only Changes to Attachment 02 Specification Sections: 01 20 00, 01 50 00, and 31 05 19).
4. Add Attachment 08 Plans Replacement Pages (Containing Attachment 03 Plans replacements to drawing numbers: CD-101, CD-102, C-103, C-104, C-111, C-112, C-301, C-302 C-501).
5. Revises answer to inquiry 9667869: The vineyard referenced will be removed by the landowner, amended specification and drawings will follow on or around 15 April, in a final amendment.
SAM Posting Amendment 4: Solicitation Amendment 3
- Revised Specification Sections 01 20 00 & 31 11 00 to incorporate revised inquiry 9667869 response provided with prior Solicitation Amendment 3
- Updated Construction Wage Rate Determination CA20220018 dated 01April2022.
All other Terms and Conditions remain unchanged.
Update #5 ·
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement for Design-Bid-Build (DBB) construction services to provide levee erosion repair in support of the PL 84-99 program at Site 1151-21 in Tracy, CA.
The anticipateds requirement includes repairing 1,500 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, south of Airport Way in Tracy, CA. Construction is anticipated to include removal an existing steel tube fence, clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside of the levee. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. The project is also anticipated to require dust control measures, morning safety meetings, weekly status and progress meetings.
The Government anticipates construction work will be performed in the Spring, Summer, and Fall of 2022. All work must be complete by 01 November 2022.
The solicitation, plans, and specifications are available for inspection without charge when accessed downloaded from this SAM posting.
In accordance with FAR 36.204(g) the magnitude of construction is estimated to be between $5,000,000 and $10,000,000
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this notice.
PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
SAM Posting Amendment 1: 24March2022 Site Visit Agenda and Sign-In Sheet
SAM Posting Amendment 2: Solicitation Amendment 1
- Revised Specification 00 21 13 to remove “best value” references
- Inclusion of Geotechnical Data Report 1151-21 as Attachment 5. Must be requested from CS, Jennifer Wheelis via DoDSAFE
- Revision to Attachment numbering, Geotechnical Data Report is now Attachment 5 and Pre-Award Survey is now Attachment 6.
- Extend ProjNet submission date from 31March2022 to 05April2022.
- Extend Bid due date from 18April2022 to 19April2022.
SAM Posting Amendment 3: Solicitation Posting 2
1. Extend Bid Submission to Friday 22 April, 2022 at 1000 with Bid Opening at 1330 PST.
2. Replace Attachment 04 with updated CWRD San Joaquin CA20220018 April 1, 2022.
3. Add Attachment 07 Specifications Supplemental (Containing only Changes to Attachment 02 Specification Sections: 01 20 00, 01 50 00, and 31 05 19).
4. Add Attachment 08 Plans Replacement Pages (Containing Attachment 03 Plans replacements to drawing numbers: CD-101, CD-102, C-103, C-104, C-111, C-112, C-301, C-302 C-501).
5. Revises answer to inquiry 9667869: The vineyard referenced will be removed by the landowner, amended specification and drawings will follow on or around 15 April, in a final amendment.
All other Terms and Conditions remain unchanged.
Update #4 ·
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement for Design-Bid-Build (DBB) construction services to provide levee erosion repair in support of the PL 84-99 program at Site 1151-21 in Tracy, CA.
The anticipateds requirement includes repairing 1,500 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, south of Airport Way in Tracy, CA. Construction is anticipated to include removal an existing steel tube fence, clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside of the levee. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. The project is also anticipated to require dust control measures, morning safety meetings, weekly status and progress meetings.
The Government anticipates construction work will be performed in the Spring, Summer, and Fall of 2022. All work must be complete by 01 November 2022.
The solicitation, plans, and specifications are available for inspection without charge when accessed downloaded from this SAM posting.
In accordance with FAR 36.204(g) the magnitude of construction is estimated to be between $5,000,000 and $10,000,000
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this notice.
PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
SAM Posting Amendment 1: 24March2022 Site Visit Agenda and Sign-In Sheet
SAM Posting Amendment 2: Solicitation Amendment 1
- Revised Specification 00 21 13 to remove “best value” references
- Inclusion of Geotechnical Data Report 1151-21 as Attachment 5. Must be requested from CS, Jennifer Wheelis via DoDSAFE
- Revision to Attachment numbering, Geotechnical Data Report is now Attachment 5 and Pre-Award Survey is now Attachment 6.
- Extend ProjNet submission date from 31March2022 to 05April2022.
- Extend Bid due date from 18April2022 to 19April2022.
SAM Posting Amendment 3: Solicitation Posting 2
1. Extend Bid Submission to Friday 22 April, 2022 at 1000 with Bid Opening at 1330 PST.
2. Replace Attachment 04 with updated CWRD Sacramento County dated April 1, 2022.
3. Add Attachment 07 Specifications Supplemental (Containing only Changes to Attachment 02 Specification Sections: 01 20 00, 01 50 00, and 31 05 19).
4. Add Attachment 08 Plans Replacement Pages (Containing Attachment 03 Plans replacements to drawing numbers: CD-101, CD-102, C-103, C-104, C-111, C-112, C-301, C-302 C-501).
5. Revises answer to inquiry 9667869: The vineyard referenced will be removed by the landowner, amended specification and drawings will follow on or around 15 April, in a final amendment.
All other Terms and Conditions remain unchanged.
Update #3 ·
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement for Design-Bid-Build (DBB) construction services to provide levee erosion repair in support of the PL 84-99 program at Site 1151-21 in Tracy, CA.
The anticipateds requirement includes repairing 1,500 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, south of Airport Way in Tracy, CA. Construction is anticipated to include removal an existing steel tube fence, clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside of the levee. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. The project is also anticipated to require dust control measures, morning safety meetings, weekly status and progress meetings.
The Government anticipates construction work will be performed in the Spring, Summer, and Fall of 2022. All work must be complete by 01 November 2022.
The solicitation, plans, and specifications are available for inspection without charge when accessed downloaded from this SAM posting.
In accordance with FAR 36.204(g) the magnitude of construction is estimated to be between $5,000,000 and $10,000,000
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this notice.
PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
SAM Posting Amendment 1: 24March2022 Site Visit Agenda and Sign-In Sheet
SAM Posting Amendment 2: Solicitation Amendment 1
- Revised Specification 00 21 13 to remove “best value” references
- Inclusion of Geotechnical Data Report 1151-21 as Attachment 5. Must be requested from CS, Jennifer Wheelis via DoDSAFE
- Revision to Attachment numbering, Geotechnical Data Report is now Attachment 5 and Pre-Award Survey is now Attachment 6.
- Extend ProjNet submission date from 31March2022 to 05April2022.
- Extend Bid due date from 18April2022 to 19April2022.
Update #2 ·
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement for Design-Bid-Build (DBB) construction services to provide levee erosion repair in support of the PL 84-99 program at Site 1151-21 in Tracy, CA.
The anticipateds requirement includes repairing 1,500 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, south of Airport Way in Tracy, CA. Construction is anticipated to include removal an existing steel tube fence, clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside of the levee. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. The project is also anticipated to require dust control measures, morning safety meetings, weekly status and progress meetings.
The Government anticipates construction work will be performed in the Spring, Summer, and Fall of 2022. All work must be complete by 01 November 2022.
The solicitation, plans, and specifications are available for inspection without charge when accessed downloaded from this SAM posting.
In accordance with FAR 36.204(g) the magnitude of construction is estimated to be between $5,000,000 and $10,000,000
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this notice.
PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.
~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~~
SAM Posting Amendment 1: 24March2022 Site Visit Agenda and Sign-In Sheet
Update #1 ·
The U.S. Army Corps of Engineers (USACE), Sacramento District (SPK), anticipates a potential requirement for Design-Bid-Build (DBB) construction services to provide levee erosion repair in support of the PL 84-99 program at Site 1151-21 in Tracy, CA.
The anticipateds requirement includes repairing 1,500 feet of through and under seepage to rehabilitate the San Joaquin levee in San Joaquin County to pre-flood conditions, due to flood damage in the winter of 2016-2017. The work site, referred to as 1151-21, is located along the San Joaquin River, south of Airport Way in Tracy, CA. Construction is anticipated to include removal an existing steel tube fence, clearing, stripping and grubbing of existing vegetation to construct a seepage berm on the landside of the levee. Materials required for the seepage berm construction may include levee fill, geotextile, filter sand, drain rock, rip rap, seeding, aggregate surfacing, and steel tube barrier fence that match the existing materials. The project is also anticipated to require dust control measures, morning safety meetings, weekly status and progress meetings.
The Government anticipates construction work will be performed in the Spring, Summer, and Fall of 2022. All work must be complete by 01 November 2022.
The solicitation, plans, and specifications are available for inspection without charge when accessed downloaded from this SAM posting.
In accordance with FAR 36.204(g) the magnitude of construction is estimated to be between $5,000,000 and $10,000,000
The ONLY Interested Vendors / Plan Holders / Bidders List is available through SAM.gov. Contractors are responsible for self-identifying as interested vendors and contacting other interested vendors. USACE-SPK will not coordinate partnering arrangements between parties. Contractors should check SAM.gov frequently for changes to the interested vendors list and this notice.
PLEASE NOTE: THIS PROJECT AND/OR THE PROPOSED SOLICITATION AND CONTRACT ACTION MAY BE CHANGED, DELAYED, OR CANCELED AT ANY TIME.
Files
Show all 20
Notice history
| Notice | Type | Posted |
|---|---|---|
| USACE SPK DBB Construction – Public Law (PL) 84-99 Levee Erosion Repair Site 1151-21 - San Joaquin, California | Award Notice | |
| This notice | Solicitation | |
| W9123822B0008 USACE SPK DBB Construction – Public Law (PL) 84-99 Levee Erosion Repair Site 1151-21 - San Joaquin, California | Pre-Solicitation | |
| USACE Levee Repair - San Joaquin County | Pre-Solicitation | |
| USACE Levee Repair - San Joaquin County | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| USACE SPK DBB Construction - Sacramento River East Levee Contract 5 (SREL C5), Sacramento, California | ENDIST Sacramento | Total Small Business | |
| Mill Creek Section 205 Flood Risk Management Improvements | ENDIST Walla Walla | No set-aside | |
| USACE SPK DB Construction - Natomas NPP Named Pumping Plants - Sacramento, CA | ENDIST Sacramento | No set-aside | |
| $465M SPK small business MATOC for DBB/DB construction | ENDIST Sacramento | Total Small Business | |
| Brine pipeline access improvements | ENDIST Los Angeles | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity