This amendment modifies a solicitation for construction services. The U.S. Army Corps of Engineers, Sacramento District, seeks to repair 1,500 feet of a levee in Tracy, California damaged in 2016-2017 flooding through a seepage berm construction project. Work will include clearing vegetation, constructing the berm with levee fill, geotextiles, filter sand and drain rock, installing riprap and fencing, and seeding. The project value is estimated between $5-10 million. The amendment adds specifications sections and wage determinations to the solicitation attachments. Interested contractors must check SAM.gov for updates to the vendor list. The closing date was not provided.

View the file

Other files

File Type Posted
W9123822B0008 - Abstract of Offerors - 20220422.pdf PDF
B08 - W9123822B0008 - Attachment 04 Wage Rate Determination CA20220018 20220401.pdf PDF
B08 - W9123822B0008 - Attachment 09 Specifications Supplemental.pdf PDF
B08 - W9123822B0008 Attachment 04 Wage Determination CA20220018 20220401.pdf PDF
B08 - W9123822B0008 Attachment 07 Specifications Supplemental.pdf PDF
W9123822B0003 A00002 Solicitation Amendment Released.pdf PDF
B08 - Attachment 04 CWRD Sacramento County 2022 4 1.txt TXT text file
B08 - W9123822B0008 Attachment 08 Plans Replacement Pages.pdf PDF
W9123822B0008 Amendment 00001.pdf PDF
B08 - W9123822B0008 - Attachment 04 - Wage Determination CA20220018 - 20220325.pdf PDF
B08 - W9123822B0008 - Attachment 06 - Pre-Award Survey - 20220310.pdf PDF
B07 - Site Visit Agenda - 20220324.pdf PDF
B07 - Site Visit Sign In Sheet - 20220324.pdf PDF
B08 - W9123822B0008 - Attachment 01 - Specifications - 20220118.pdf PDF
B08 - W9123822B0008 - Attachment 05 - Pre-Award Survey - 20220310.pdf PDF
B08 - W9123822B0008 - Attachment 04 - Wage Determination CA20220018 - 20220225.pdf PDF
B08 - W9123822B0008 - Attachment 02 - Plans - 20220215.pdf PDF
B08 - W9123822B0008 - Attachment 03 - Bid Schedule - 202220310.pdf PDF
W91238-22-B-0008 Solicitation.pdf PDF
Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

3. Add Attachment 09 Specif ications Supplemental 2 (Containing only Changes to Attachment 2 Specif ication Replacing Sections: 01 20 00 and 31 11 00)

2. Attachment 04 Wage Determination CA20220018 - 20220401

All other Terms and Conditions remain in effect.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 19-Apr-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X W9123822B0008

X 9B. DATED (SEE ITEM 11)

16-Mar-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

19-Apr-2022

CODE

US ARMY CORPS OF ENGINEERS, SACRAMENTO

CONTRACTING DIVISION

1325 J STREET

SACRAMENTO CA 95814-2922

W91238 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

W9123822B0008

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION 00 01 10 - TABLE OF CONTENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 299 18-JAN-2022 Attachment 2 Plans 19 15-FEB-2022 Attachment 3 Bid Schedule 1 10-MAR-2022 Attachment 4 Attachment 4 CWRD

Sacramento County dated Apr 1 2022

Attachment 5 Redacted Geotechnical Data

29-JUN-2021

Attachment 6 Pre-Award Survey 4 10-MAR-2022 Attachment 7 Attachment 07

Specifications Supplemental

26 13-APR-2022

Attachment 8 Attachment 08 Plans Replacement Pages

9 13-APR-2022

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 299 18-JAN-2022 Attachment 2 Plans 19 15-FEB-2022 Attachment 3 Bid Schedule 1 10-MAR-2022 Attachment 4 Attachment 04 Wage

Determination

20CA20220018

20220401

92 01-APR-2022

Attachment 5 Redacted Geotechnical Data

29-JUN-2021

Attachment 6 Pre-Award Survey 4 10-MAR-2022 Attachment 7 Attachment 07

Specifications Supplemental

26 13-APR-2022

Attachment 8 Attachment 08 Plans Replacement Pages

9 13-APR-2022

Attachment 9 Attachment 09 Specifications Supplemental 2

16 18-APR-2022

W9123822B0008

The following have been modified:

TABLE OF CONTENTS

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Specifications 299 18-JAN-2022 Attachment 2 Plans 19 15-FEB-2022 Attachment 3 Bid Schedule 1 10-MAR-2022 Attachment 4 Attachment 04 Wage

Determination

20CA20220018

20220401

92 01-APR-2022

Attachment 5 Redacted Geotechnical Data

29-JUN-2021

Attachment 6 Pre-Award Survey 4 10-MAR-2022 Attachment 7 Attachment 07

Specifications Supplemental

26 13-APR-2022

Attachment 8 Attachment 08 Plans Replacement Pages

9 13-APR-2022

Attachment 9 Attachment 09 Specifications Supplemental 2

16 18-APR-2022

(End of Summary of Changes)