Upper Baker Installing Trailer Pads and Utilities

Closed Solicitation Posted

Solicitation number
1240LT26Q0126
Agency
Responses due
Set-aside
Total Small Business

Opportunity facts

PSC
S119 Utilities- Other
Place of performance
Monticello, Utah 84535, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service seeks quotations for installing utility lines, connections, and trailer pads at the Upper Baker Bunkhouse facility in Monticello, Utah, with quotations due July 20, 2026 at 3:00 PM Mountain Time. This is a Total Small Business Set-Aside under NAICS 237110 with a $45.0 million size standard.

Place of performance is Monticello, Utah (133 S Pinion Dr, Monticello, UT 84535). Work includes a 2" HDPE blue poly water line connected to the existing 2" poly line between the meter and bunkhouse with one stop and waste valve within 5 feet of the connection; a 6" main sewer line with 6" to 3" Wye connections to trailer pads maintaining 1/8" to 1/4" per foot drainage slope; and electrical conduit and wiring from a coordinated transformer and drop-down meter to trailer pads. Water and sewer lines must remain 10 feet apart. All utilities must comply with State and San Juan County code and be installed to frost line requirements. The contractor bears responsibility for all utility company communications, permits, and coordination. Option items include trenching and backfilling to 36 inches depth (1,250 linear feet), Grade G road base crushed aggregate surfacing (220 cubic yards), and asphalt apron installation.

Base scope includes mobilization, 400 linear feet electrical conduit and wiring, 400 linear feet water line, 450 linear feet sewer line, transformer and drop-down meter, four 50-amp trailer service hookups, four trailer sewer hookups, and four frost-proof hydrants. Period of performance is 120 days from notice to proceed. Award will be firm fixed price to the lowest evaluated price among technically acceptable quotations; technical acceptability uses an Acceptable/Unacceptable standard with no price-technical tradeoffs. Offers must remain valid for 60 calendar days from receipt. Davis-Bacon prevailing wage rates apply for San Juan County, Utah.

Notice text

This contract is comprised of installing utility lines, connections to existing lines and connections to trailer pads. Utilities included are electrical, water and sewer. Option items included are trenching, providing and spreading gravel and installation of an asphalt apron. Water and Sewer lines and connections must be kept 10ft apart. Contractor must work with and is responsible for all communications, supplies and permits with utility companies associated. All utilities will be installed in compliance with State and/or San Juan County code.

Utilities –

Water - The new water line will be connected to the existing water line between the meter and bunkhouse. Main water line will remain same size as existing line. Existing line is a 2” poly line. New water line will be a 2” HDPE blue Poly and connect to existing. One stop and waste to be installed within 5ft of new and existing line connection.

Sewer – The new sewer line will be connected to the existing sewer line at the bunkhouse. Main line will be 6” with trailer connections being 6” to 3” Wye’s. Drainage must remain between 1/8” – ¼” per ft across the entirety of the line. Must meet state code.

Electrical – A transformer and drop-down meter will need to be coordinated and installed with Empire Electric and conduit and wiring ran from meter to the trailer pads. Contractor will be responsible for determining sizing of conduit and wiring. Must meet state code.

Option Items –

Trenching and Backfilling – Trenching will need to be 36” deep to meet frost line requirements.

                      Crushed Aggregate – Grade G Road Base for the trailer pads and roadway

Files

File Type Posted
C04 SF-1442 1240LT26Q0126.pdf PDF
C04 SOW 1240LT26Q0126.docx DOCX document
C04 Merged Specs 1240LT26Q0126.docx DOCX document
C04 trailer pad 1240LT26Q0126.pdf PDF
C04 Project Map 1240LT26Q0126.pdf PDF
C04 WD San Juan County Utah 1240LT26Q0126.pdf PDF
C04 1240LT26Q0126.docx DOCX document
C04 Utility Plan 1240LT26Q0126.pdf PDF
C04 water details 1240LT26Q0126.pdf PDF

Similar open opportunities

Opportunity Agency Set-aside Responses due
GAOA Kents Lk. CG Reconstruction, Fishlake NF, Utah Beaver, Utah 84713, United States · NAICS 237990 Forest Service Total Small Business
USDA Forest Service - Hebgen Lake District Office Network Cabling and IT Room Improvements West Yellowstone, Montana 59758, United States · NAICS 238210 Forest Service Total Small Business
Loleta Water System Upgrades Marienville, Pennsylvania 16239, United States · NAICS 237110 Forest Service Total Small Business
GAOA Star Meadows MEP Repairs Utility Installations Flathead NF Whitefish, Montana 59937, United States · NAICS 238220 Forest Service Total Small Business
4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming Mc Kinnon, Wyoming 82935, United States · NAICS 237110 Forest Service Total Small Business