About this opportunity

The U.S. Department of the Interior (DOI), U.S. Geological Survey has a requirement for the rehabilitation and preventative maintenance of three groundwater wells at the UMESC facility in La Crosse, Wisconsin. This requirement is being issued as a Request for Quote (RFQ) under Solicitation Number 140G0224Q0090. The contract will be awarded to the vendor whose quote, conforming to the RFQ, is determined to be the most advantageous to the government using the policies and procedures for simplified commercial item acquisitions in FAR Part 12 and FAR 13.5. Key dates include a quotation due date of May 17, 2024 and a question submission deadline of May 15, 2024.

This solicitation is set aside for small businesses under NAICS code 237110 - Water and Sewer Line and Related Structures Construction. The period of performance is from June 1, 2024 through May 31, 2029, with a base year and four one-year option periods. Pricing is required on a per-well basis, with quantities of three wells for the base year and one well per option year for the optional televising and rehabilitation services. The place of performance is the UMESC facility in La Crosse, Wisconsin.

Notice text

4 versions

Update #4 · Latest ·

Amendment 0003 Extends the Quotation due date to May 17, 2024 at 5:00 ED with Q&A due May 15, 2024 at 12:00 ED.

Update #3 ·

Amendment 0002 provides Questions and Answers Received:

Question 1: To confirm, PM services is for 3 wells each year and does not include removal of the well pumps correct?

Answer: PM Services (covering all 3 wells for each year of service performed) are as follows per the Statement of Work:

1. Preventative Maintenance Services
2. Inspection of components: Valves, Pump Base, Airlines, Etc.
3. Report on Existing Pump Performance, Comparison with Design
4. Pump Vibration Inspection/ Assessment
5. Recording of Motor Electrical Data (Running Amps, Voltage)
6. Changing of Motor Oil and Gear Drive Lubricants
7. Repacking of Stuffing Box
8. Provide pump installation sheets and hydraulic data sheets UMESC facility Technical Liaison (TL).

Should the performance of these services require removal of the well pumps, then well pump removal shall be included as part of the work.


Question 2. To confirm, in the base year only Well #3 is to be televised but optional additional years 1-4 TV would include all 3 wells so those would be Qty. 3 for bidding purposes?

Answer: Camera inspection services for option years would be for one of the wells in that option period. This would be a separate option should the Government choose to televise one of the wells in a given option year.

Question 3. It will be necessary to remove the well pump to televise. Should the cost to remove the pump and then reinstall the pump be included in the Camera Inspection line item or in the optional motor & pump rehabilitation line item?

Answer: Should be in the camera inspection line item. Provide separate pricing within the line item for the motor/pump removal and well televising.

Question 4. The optional well cleaning/rehabilitation line item would be per well with a qty of 3 for bidding purposes each year?

Answer: Pricing for well cleaning/rehabilitation shall be per well with a qty of 1 per year for bidding purposes.

Question 5. The optional well cleaning/rehabilitation line item include will also require pump removal and inspection. Should this be included in this line item or in the motor & pump rehabilitation line item?

Answer: Should be in the camera inspection line item. Provide separate pricing within the line item for the motor/pump removal and well televising.

Question 6. The optional motor & pump rehabilitation line item would again be Qty. 3 for each year correct?

Answer: Pricing for well cleaning/rehabilitation shall be per well with a qty of 1 per year for bidding purposes.

Question 7. The optional motor & pump rehabilitation line item should include pump reinstallation correct?

Answer: Yes, motor & pump rehabilitation shall include reinstallation of the motor and pump

Question 8. The optional motor & pump rehabilitation does not include and repairs as those would be determined after inspection correct?

Answer: Correct

Update #2 ·

Amendment 0001 provides clarifications on the evaluation factors requirements:

"Question: Factor 1 - Past Performance: I would like to inquire about the past performance requirements. Is it permissible to submit the past performances of our subcontractors, or are we restricted to submissions from the prime contractor only?

Answer: You may provide past performance information for both the contractor and subcontractors. Please indicate any teaming arrangements with subcontractors in the contractor's proposal.

Question: Factor 2 - Qualifications: Is it allowable for the personnel designated for onsite work to be employed by our subcontractor, or must they be directly employed by the prime contractor?

Answer: You may provide qualifications for both the contractor and subcontractors. Any teaming arrangements with subcontractors should be noted in the contractor's proposal."


Update #1 ·

1) This Synopsis/Solicitation Notice is to announce the U.S. Department of Interior (DOI), U.S. Geological Survey has a requirement for REHABILITATIN AND PREVENTATIVE MAINTENANCE OF WELLS in accordance with the attached solicitation.

2) The synopsis/solicitation number is 140G0224Q0090 and is being issued as a Request for Quote (RFQ).

3) The award for this requirement shall be made using the policies in the Federal Acquisition Regulations (FAR) Part 12, Acquisition of Commerical Items, and in conjunction with the policies and procedures for solicitation, evaluation, and award prescribed in FAR 13.5 Simplified Procedures for Certain Commerical Items, as appropriate for this acquisition. Award shall be made to the vendor whose quote, conforming to this RFQ is determined to be the most advantageous to the government.

4) This solicitation is a SET ASIDE for Small Businesses. The associated NAICS 237110 - Water and Sewer Line and Related Structures Construction.

5) A copy of this solicitation may be accessed by clicking "Attachments/Links".

6) All requirements for preparation, submission, and receipt of quotes are contained in this solicitation and shall be adhered to.

7) All questions and quote must be emailed to the Contracting Officer, Beth Wilson at bwilson@usgs.gov.

Attachments

Files attached to this notice, newest first
File Type Posted
Sol_140G0224Q0090_Amd_0003.pdf PDF
Sol_140G0224Q0090_Amd_0002.pdf PDF
Sol_140G0224Q0090_Amd_0001.pdf PDF
Attachment_A_Wage_Determination.pdf PDF
Sol_140G0224Q0090.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Umesc well PM Award Award Notice
Umesc well PM This notice · Latest solicitation Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity