Groundwater Monitoring in Wabasha County, MN
Closed Solicitation Posted
- Solicitation number
- W912ES27QA013
- Agency
-
ENDIST St Paul
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 541380 Testing Laboratories and Services
- Place of performance
- Grand Encampment Placement Site - East of Kellogg, MN along Zumbro River -- 44.310928, -91.956431, Greenfield Township, Minnesota 55945
- Points of contact
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, St. Paul District is soliciting offers for groundwater monitoring services supporting the Grand Encampment Dredge Material Placement Site Unload project, with proposals due November 18, 2026. The solicitation is a total small business set-aside under NAICS 541380, Testing Laboratories and Services, with a size standard of $19 million.
Performance is at Kellogg, MN 55945, along the Zumbro River in Wabasha County. The PSC is F103, Environmental Systems Protection- Water Quality Support. The contractor collects water samples from three monitoring wells and up to four government-selected residential wells before, during, and after active unloading in Spring 2027. During active unloading, samples are also collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. An environmental laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) must analyze all samples for the specified methods and parameters.
Sampling follows three phases. Pre-Placement (Phase 1) samples are collected and tested approximately 90, 60, and 30 days before the active hydraulic transfer of stockpiled dredge materials begins. Active Placement (Phase 2) samples are collected and tested approximately 3, 17, and 31 days after the transfer begins, with options at approximately 45, 59, and 73 days after transfer start. Post-Placement (Phase 3) samples are collected and tested approximately 30, 60, and 90 days after the materials transfer completes. The contractor submits a final sampling and analysis report within 50 days of testing completion.
Amendment 0001 permits absence/presence reporting in place of quantitative MPN results for E. coli. Questions must be submitted in writing through the PIEE Q&A module, and offers must be submitted through the PIEE module.
Notice text
2 versions
Update #2 · Latest ·
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section. --- AMENDMENT 0001 has been added - Amendment 0001 allows Absence/Presence Reporting in place of quantitative MPN Results for both E. coli and total coliform for organic samples.
Update #1 ·
The U.S. Army Corps of Engineers - St. Paul District is seeking a contractor to perform groundwater monitoring services in support of the Grand Encampment Dredge Material Placement Site Unload project along the Zumbro River near Kellogg, MN in Wabasha County. This solicitation is 100% set-aside for small business under NAICS 541380 with a size standard of $19 million. The contractor will collect water samples from three monitoring wells and up to four government-selected residential wells before, during and after the active unloading of the site in Spring 2027. During the active unload phase samples will also be collected from the river upstream of the site and from standing water within the active dredged-material placement/infiltration pit. Water samples will be analyzed by an environmental analytical testing laboratory accredited under the Minnesota Environmental Laboratory Accreditation Program (MNELAP) for all specified methods and parameters. Pre-Placement (Phase 1) samples will be collected and tested approximately 90, 60 and 30 days prior to the start of the active hydraulic transfer of stockpiled dredge materials to the upland placement site. Samples will be collected and tested during Active Placement (Phase 2) approximately 3, 17, and 31 days after the transfer begins, with options for additional sample collection and testing at approximately 45, 59 and 73 days after start of transfer. Post-Placement (Phase 3) samples will be collected and tested approximately 30, 60 and 90 days after the completion of the materials transfer. The contractor will prepare a final sampling and analysis report, submitted within 50 days of testing completion. All questions should be submitted in writing via the PIEE module Q and A section. Offers should be submitted via the PIEE Module. Click the first link in the Attachments/Links section.
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Groundwater Monitoring in Wabasha County, MN | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Sources Sought for Geotechnical Exploration for U.S. Army Corps of Engineers, St. Louis District | ENDIST St Louis | No set-aside | |
| Laboratory Analysis of Water Samples | — | Total Small Business | |
| Mud Mountain Dam Sewage Lagoon Repair | ENDIST Seattle | Total Small Business | |
| Whiteface Campground Well Replacement | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity