U. S. Army Europe - Information Technology Training (ITT) Program
Awarded Award Notice Posted
- Solicitation number
- ID03180005
- Agency
- Federal Acquisition Service General Services Administration
- Awarded
- to Global Knowledge Training LLC
- Set-aside
- No set-aside
Opportunity facts
- Contract number
- 47QFMA18D0001 Federal IDV award
- NAICS code
- 611430 Professional and Management Development Training
- PSC
- Not on record
- Place of performance
- Germany: Wackernheim, Wiesbaden, Kaiserslautern, Stuttgart, and Vilseck, Italy: Vicenza APO-AE, Non-U.S. 09014 Germany
Notice details come from SAM.gov. Updated .
Notice text
33 versions
Update #33 · Latest ·
Awarded Vendors: Global Knowledge Training, LLC.. Contract Award Dollar Amount: $45,000,000.00. Contract Award Date: 2018-09-10.
Update #32 ·
Amendment 11 Dated 6-13-2018: The purpose of amendment 11 is to:
A. Incorporate the revised RFP dated 06/13/2018 to correct quantity discrepancies in section B with the Pricing Template.
B. Time and Date of Offers Remains Unchanged.
Amendment 10 Dated 06-01-2018: The amendment acknowledges Amendments 1-9. This amendment revises section L.3 proposals instructions of the RFP "Amendment 10 RFP." This amendment incorporates Government responses to Industry questions. Time and date for receipt of offers remains unchanged.
Amendment 09 Dated 05-24-2018: The solicitation suspension is lifted. The time and date for receipt of offerors is established at 06/15/2018 at 4:00PM EST. Questions for this RFP are revised to 05/31/2018 at 2:00 PM EST. All past performance questionnaires may be submitted. All questionnaires received during the suspension will be acknowledged.
Amendment 08 Dated 5-16-2018: The following ammendment is issued to extend the close date to 5-25-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 07 Dated 5-8-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #31 ·
Added: Dec 20, 2017 9:32 am
Modified: Jun 13, 2018 2:30 pmTrack Changes
Amendment 11 Dated 6-13-2018: The purpose of amendment 11 is to:
A. Incorporate the revised RFP dated 06/13/2018 to correct quantity discrepancies in section B with the Pricing Template.
B. Time and Date of Offers Remains Unchanged.
Amendment 10 Dated 06-01-2018: The amendment acknowledges Amendments 1-9. This amendment revises section L.3 proposals instructions of the RFP “Amendment 10 RFP.” This amendment incorporates Government responses to Industry questions. Time and date for receipt of offers remains unchanged.
Amendment 09 Dated 05-24-2018: The solicitation suspension is lifted. The time and date for receipt of offerors is established at 06/15/2018 at 4:00PM EST. Questions for this RFP are revised to 05/31/2018 at 2:00 PM EST. All past performance questionnaires may be submitted. All questionnaires received during the suspension will be acknowledged.
Amendment 08 Dated 5-16-2018: The following ammendment is issued to extend the close date to 5-25-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 07 Dated 5-8-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #30 ·
Amendment 10 Dated 06-01-2018: The amendment acknowledges Amendments 1-9. This amendment revises section L.3 proposals instructions of the RFP "Amendment 10 RFP." This amendment incorporates Government responses to Industry questions. Time and date for receipt of offers remains unchanged.
Amendment 09 Dated 05-24-2018: The solicitation suspension is lifted. The time and date for receipt of offerors is established at 06/15/2018 at 4:00PM EST. Questions for this RFP are revised to 05/31/2018 at 2:00 PM EST. All past performance questionnaires may be submitted. All questionnaires received during the suspension will be acknowledged.
Amendment 08 Dated 5-16-2018: The following ammendment is issued to extend the close date to 5-25-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 07 Dated 5-8-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #29 ·
Added: Dec 20, 2017 9:32 am
Modified: Jun 01, 2018 9:47 amTrack Changes
Amendment 10 Dated 06-01-2018: The amendment acknowledges Amendments 1-9. This amendment revises section L.3 proposals instructions of the RFP “Amendment 10 RFP.” This amendment incorporates Government responses to Industry questions. Time and date for receipt of offers remains unchanged.
Amendment 09 Dated 05-24-2018: The solicitation suspension is lifted. The time and date for receipt of offerors is established at 06/15/2018 at 4:00PM EST. Questions for this RFP are revised to 05/31/2018 at 2:00 PM EST. All past performance questionnaires may be submitted. All questionnaires received during the suspension will be acknowledged.
Amendment 08 Dated 5-16-2018: The following ammendment is issued to extend the close date to 5-25-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 07 Dated 5-8-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #28 ·
Amendment 09 Dated 05-24-2018: The solicitation suspension is lifted. The time and date for receipt of offerors is established at 06/15/2018 at 4:00PM EST. Questions for this RFP are revised to 05/31/2018 at 2:00 PM EST. All past performance questionnaires may be submitted. All questionnaires received during the suspension will be acknowledged.
Amendment 08 Dated 5-16-2018: The following ammendment is issued to extend the close date to 5-25-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 07 Dated 5-8-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #27 ·
Added: Dec 20, 2017 9:32 am
Modified: May 24, 2018 10:26 amTrack Changes
Amendment 09 Dated 05-24-2018: The solicitation suspension is lifted. The time and date for receipt of offerors is established at 06/15/2018 at 4:00PM EST. Questions for this RFP are revised to 05/31/2018 at 2:00 PM EST. All past performance questionnaires may be submitted. All questionnaires received during the suspension will be acknowledged.
Amendment 08 Dated 5-16-2018: The following ammendment is issued to extend the close date to 5-25-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 07 Dated 5-8-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #26 ·
Amendment 08 Dated 5-16-2018: The following ammendment is issued to extend the close date to 5-25-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 07 Dated 5-8-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #25 ·
Added: Dec 20, 2017 9:32 am
Modified: May 16, 2018 8:57 amTrack Changes
Amendment 08 Dated 5-16-2018: The following ammendment is issued to extend the close date to 5-25-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 07 Dated 5-8-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #24 ·
Amendment 07 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #23 ·
Added: Dec 20, 2017 9:32 am
Modified: May 08, 2018 11:50 amTrack Changes
Amendment 07 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-18-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #22 ·
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #21 ·
Added: Dec 20, 2017 9:32 am
Modified: May 02, 2018 10:39 amTrack Changes
Amendment 06 Dated 5-2-2018: The following ammendment is issued to extend the close date to 5-11-2018 to prevent the soliciation from closing. The solicitation remains suspended.
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #20 ·
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #19 ·
Added: Dec 20, 2017 9:32 am
Modified: Apr 13, 2018 11:53 amTrack Changes
Amendment 05 Dated 4-13-2018: A protest to the solicitation has been received. The solicitation is suspended until further notice; however, the time and date for receipt of offers will be extended until the protest is concluded.
Any past performance questionnaires received after the receipt of the protest will not be acknowledged until the protest is concluded.
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #18 ·
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #17 ·
Added: Dec 20, 2017 9:32 am
Modified: Apr 09, 2018 3:08 pmTrack Changes
Amendment 04 Dated 4-9-18: The following amendment extends the RFP to 05/04/2018.
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #16 ·
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #15 ·
Added: Dec 20, 2017 9:32 am
Modified: Mar 30, 2018 5:19 pmTrack Changes
Amendment 03 Dated 3-30-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #14 ·
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #13 ·
Added: Dec 20, 2017 9:32 am
Modified: Mar 28, 2018 9:27 amTrack Changes
Amendment 02 Dated 03-28-18: The following amendment is issued to incorporate a revised PWS.
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #12 ·
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #11 ·
Added: Dec 20, 2017 9:32 am
Modified: Mar 23, 2018 3:51 pmTrack Changes
Amendment 01 Dated 3-23-18: The following amendment is issued to incorporate a revised PWS and Government responses to Industry questions.
The Government intends to award on initial proposals. The Government, however, reserves the right to conduct discussions if the Contracting Officer (CO) determines them to be necessary, and in the best interests of the Government. In such case, if the CO determines that the number of proposals that would otherwise be competitive from a price and best value standpoint exceeds the number at which an efficient competition can be conducted, the CO will limit the number of proposals to be considered, to the greatest number that will permit an efficient competition among the most highly evaluated proposal packages.
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #10 ·
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #9 ·
Added: Dec 20, 2017 9:32 am
Modified: Mar 15, 2018 12:21 pmTrack Changes
Edit: 3-15-2018: The pro-proposal conference will be virtual. The meeting can be attended via the following link: https://meet.gsa.gov/r6s00bbrcac3/
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #8 ·
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #7 ·
Added: Dec 20, 2017 9:32 am
Modified: Mar 14, 2018 1:19 pmTrack Changes
Edit: 3-14-2018: Attached is the Request for Proposal (RFP). Please see the RFP for instructions. Questions for this RFP are due by 4:00 PM EST on 3/21/2018 to kevin.flynn@gsa.gov.
Pre-Proposal Conference:
Date: 03/21/2018
Time: 08:30 AM EST
Purpose:
• To explain the RFP instructions and attachments.
• Answer questions directly related to the RFP and attachments.
• No technical questions are permitted.
• Results of the pre-proposal conference will not be provided.
• Offerors who choose not to attend do so at their own risk.
-----
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #6 ·
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
.
Update #5 ·
Added: Dec 20, 2017 9:32 am
Modified: Feb 07, 2018 3:09 pmTrack Changes
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Edit: 02-07-2018: Attached is the synopsis of the requirement.
Update #4 ·
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster..
Update #3 ·
Added: Dec 20, 2017 9:32 am
Modified: Feb 07, 2018 2:53 pmTrack Changes
Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Edit: 02-07-2018: Attached are the industry day documents and roster.
Update #2 ·
Please read the attached PDF for Request for Information and details about Industry Day in Germany. .
Update #1 ·
Added: Dec 20, 2017 9:32 am Please read the attached PDF for Request for Information and details about Industry Day in Germany.
Attachments
| File | Type | Posted |
|---|---|---|
| Amendment_11.zip | ZIP file | |
| Amendment_10.zip | ZIP file | |
| AMD_03.zip | ZIP file | |
| ID03180005_AE-ITT_PWS_22_March_2018_FINAL_v2.pdf | ||
| AMD_01.zip | ZIP file | |
| RFP_3-14-2018.zip | ZIP file | |
| Synopsis_AE-ITT.pdf | ||
| FOR_RELEASE.zip | ZIP file | |
| ID03180005_Request_for_Information-Industry_Day_in_Germany_V4.pdf | ||
| ID03180005_Request_for_Information-Industry_Day_in_Germany_V3.pdf | ||
| Government_Responses.xlsx | XLSX spreadsheet | |
| Draft_PWS-RFI.pdf | ||
| ID03180005_Request_for_Information-Industry_Day_in_Germany_V2.pdf | ||
| Draft_PWS-RFI.pdf | ||
| ID03180005_Request_for_Information-Industry_Day_in_Germany.pdf |
Show all 15
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity