Barkley Power Plant Turbine Generator Rehab NOI

Closed Special Notice Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
W912P519B0003
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Place of performance
Kuttawa, Kentucky, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Nashville District published a Special Notice to announce an Industry Review Webinar for the Barkley Power Plant Turbine Generator Rehabilitation project draft technical plans and specifications. The webinar will be held on February 20, 2019 at 11:00 AM Central Time to present the draft documents and seek feedback from potential contractors.

The Special Notice provides contractors the opportunity to review and comment on the draft technical plans and specifications for the Barkley Power Plant Turbine Generator Rehabilitation project prior to solicitation. Contractors must register for the webinar by February 19, 2019 by emailing the point of contact with attendee names and organization CAGE code. Questions may be submitted until March 1, 2019. The overall goal of the project is to increase the maximum output of generators for units 2-4 from 41.52 MW to 46.5 MW by rewinding. Accompanying mechanical systems will also be refurbished to support the new load capacity. No award or compensation will result from participation in the industry review webinar.

Notice text

2 versions

Update #2 · Latest ·

NOTICE OF INTENT TO INCLUDE BRAND NAME OR EQUAL SPECIFICATIONS IN A FUTURE CONTRACT FOR THE BARKLEY POWER PLANT TURBINE GENERATOR REHABILITATION PROJECT


Description(s):
ARMY CORPS OF ENGINEERS-NASHVILLE DISTRICT'S NOTICE OF INTENT TO INCLUDE BRAND NAME OR EQUAL SPECIFICATIONS IN A FUTURE CONTRACT FOR THE BARKLEY POWER PLANT TURBINE GENERATOR REHABILITATION PROJECT IN KUTTAWA, KENTUCKY.
The U.S. Army Corps of Engineers Nashville District (USACE LRN) will be soliciting proposals for a Single Award Firm Fixed Price construction contract to replace four (4) turbine generators at Barkley Power Plant located in Kuttawa, Kentucky.
It is industry standard practice, while designing intricate mechanical and electrical systems, to base design around products that meet the needs of the project based on the standard of quality required and the make and model used as basis of design. As all the components of a system must work together and function as a system, the basis of design of each individual component may change based on substitution. The standard of quality must remain the same as the USACE design.


In addition to a functional system, the products used as the basis of design for the subject project also fit within a specific footprint and are compatible with existing equipment systems in the power plant without major modification.
Competition is only limited to the extent necessary to meet the Government's legitimate needs of this project. Contractors are free to use any product which meets the Government's minimum needs. Other manufacturers may be substituted as long as the standard of quality and characteristics of the substituted manufacturer meet or exceed the standard of quality and characteristics of the basis of design. Reference clause Federal Acquisition Regulation (FAR) 52.236-5, Material and Workmanship.
The Materials and Workmanship clause will be included in the anticipated solicitation and resulting contract. This clause states that: "References in the drawings and specifications to equipment, material, articles, or patented processes by trade name, make, or catalog number, shall be regarded as establishing a standard of quality and shall not be construed as limiting competition." The Contractor may, at its option, use any equipment, material, article, or process that, in the judgment of the Contracting Officer, is determined to be equal through formal evaluation comparison against the specified salient characteristics as provided by the written specifications for each piece of equipment, material, article or process.
For the purposes described herein, the USACE LRN intends to issue a competitive solicitation that will include the brand name or equal items listed below:


No. Manufacturer Item Specification Reference
1 Office Star Models 5560 or 2300 or approved equal 01 50 00; Para 3.5.1.1.c
2 Tractel Tirfor Griphoists or approved equal 05 50 14; Para 1.4.e
3 Crosby Turnbuckles or approved equal 05 50 14; Para 2.1.12
4 Crosby Shackles or approved equal 05 50 14; Para 2.1.13
5 Crosby Swivel Hooks or approved equal 05 50 14; Para 2.1.14
6 Crosby Swivel Hoist Rungs or approved equal 05 50 14; Para 2.1.15
7 PPG Betonel Delux 8574 Bleu or approved equal 09 97 02; Para 3.5
8 Wacker Chemie AG Vinnol H 15/50 or approved equal 09 97 02; Para 2.3.2.2
9 Wacker Chemie AG Vinnol H 15/45 M or approved equal 09 97 02; Para 2.3.2.3
10 NIBCO F-515-CS-F-66-FS or approved equal 22 00 00.00 26; Para 2.5.4.b
11 NIBCO F-515-S6-F-66-FS or approved equal 22 00 00.00 26; Para 2.5.4.c
12 Maxi-Bolt Anchors or approved equal 22 00 00.00 26; Para 2.6
13 Baron Model BA-LV-150 Vacuum Oil Purifier or approved equal 22 00 00.00 26; Para 3.5.2
14 Jerguson Magnicator II Point Level Switch or approved equal 22 00 00.00 26; Para 3.6
15 BSM Pump Rotary Gear Pump 00-Series for 1000 SSU or approved equal 22 00 00.00 26; Para 3.7.1
16 Oilskimmers Inc. Model V6 or approved equal 22 00 00.00 26; Para 3.11
17 Farval CS2000 or approved equal 22 00 00.00 26; Para 3.12
18 ABB RGW6-ST-1 or approved equal 26 05 00.00.26; Para 2.4.3
19 Dwyer Proximity Series CLS2 or approved equal 26 05 00.00.26; Para 2.12
20 Fenwal DETECT-A-FIRE or approved equal 26 05 00.00.26; Para 2.17
21 Yokogawa Model # AXF040C-E1AL1L-BA11-21B/FF1 or approved equal 26 05 00.00.26; Para 2.2
22 Dwyer RTD Model # RTD-646 or approved equal 26 05 00.00.26; Para 2.9
23 Absolute Process Instruments Model # 1420GA-P-HH-U or approved equal 26 05 00.00.26; Para 2.1
24 Weschler Instruments Model # BG-241TC or approved equal 26 05 00.00.26; Para 2.11
25 IDEC Corporation Model # PS5R-D24 or approved equal 26 05 00.00.26; Para 2.13
26 Absolute Process Instruments Model # 1020GA-P-LL-U or approved equal 26 05 00.00.26; Para 2.14
27 Loctite Gasket Eliminator No. 504 or approved equal 48 13 13.02 26; Para 3.10.5
28 Chesterton 1750 or 1760 PTFE/Graphite or approved equal 48 13 13.01 26; Para 2.4.a
29 Garlock Style 1965 PTFE/Graphite or approved equal 48 13 13.01 26; Para 2.4.a
30 Garlock 1333-G Graphite Packing or approved equal 48 13 13.01 26; Para 2.4.b
31 Parker Packing Company Polypak or approved equal 48 13 13.04 26; Para 3.15.3
32 James Walker LoFilm Shallex or approved equal 48 13 13.04 26; Para 3.15.3
33 NIBCO Type T-FP-600N or approved equal 48 13 13.04 26; Para 3.26.3
34 Zep Iron Clad or approved equal 48 13 13.07 26; Para 3.4.6
35 Iris Power Engineering, Inc. Model PDA-IV or approved equal 48 13 16.00 26; Para 2.10.5


This Notice of Intent is not a request for competitive proposals. All responsible sources may identify their interest and submit clearly articulated product information. Product information provided will be considered solely at the discretion of the Government. Responses must be received by 25 September 2019 to be considered.


The Government will not be responsible for any cost incurred in preparation of your response. Submit response and questions to this notice to, Contract Specialist Kristal Jones: Kristal.R.Jones@usace.army.mil.


The posting of this Notice satisfies the provisions set forth at FAR Subpart 5.2., Synopses of Proposed Contract Action.


.

Update #1 ·

Opportunity to Review Draft Technical Plans and Specifications during Industry Review Webinar
The U.S. Army Corps of Engineers (USACE), Nashville District, is conducting an Industry Review Webinar on 20 February 2019 at 11:00 am central time to seek feedback from potential contractors on the Barkley Power Plant Turbine Generator Rehabilitation project.
The intent of the webinar is for the USACE to present Draft Plans and Draft Specifications for industry review. USACE seeks feedback from a contractor's perspective in reference to the Draft Plans and Draft Specifications.
THIS IS NOT A SOLICITATION AND NO CONTRACT WILL BE AWARDED FROM THIS ANNOUNCEMENT.
This is not a solicitation announcement, nor is it an Invitation for Bid (IFB), Request for Proposal (RFP), or Request for Quote (RFQ). No solicitation is currently published. Participation in this conference by any party does not obligate the Government in any contract award. The Government will not pay for the provision of any information, nor will it compensate any respondents for the development of such information. The Government is not responsible for any costs associated with: reviewing the Draft Documents, preparing and submitting comments, or any other efforts towards participation in this conference. Furthermore, the Government is not obligated to compensate respondents for any information received, even if the Draft Documents are revised as a result of a respondent's comment or question. Respondents should refrain from providing proprietary information in the course of the conference, since any information acquired by the Government in this forum will not be treated as proprietary.
The information gathered will be used by the Government to make appropriate acquisition decisions. Replies to responses, comments, or suggestions will not be provided or published.
Scope: The overall goal of this project is to increase the generator maximum output from 41.52 MW to 46.5 MW. This will be accomplished by rewinding units 2, 3, and 4. Unit 1 was rewound in September 2011. All the mechanical system to support this new load will have to be assessed and refurbished. While the units are down for rehabilitation there will be some efforts to upgrade or replace systems associated with the turbine generators.
The following information is provided in this Special Notice:
Event: Industry Review Webinar
Date: 20 February 2019
Time: 11:00 AM Central Time
Webinar Link: https://usace.webex.com/mw3200/mywebex/cmr/cmr.do?siteurl=usace&AT=meet&username=bradley.j.cressman
USA Toll-Free: (877) 873-8017
USA Caller Paid/International Toll: (636) 651-3181
ACCESS CODE: 6382301
Security: 12345
Registration: Please send Lether Robinson, Contract Specialist an email at lether.e.robinson@usace.army.mil if you plan on attending the scheduled Industry Review Webinar no later than 19 February 2019 at 4:00 pm Central Time. The email should contain a list of personnel who will be attending the webinar, organization name and CAGE code for accountability.
Questions: Industry will be given nine (9) calendar days to submit questions to Lether Robinson at lether.e.robinson@usace.army.mil at the conclusion of the Industry Review Webinar. All questions must be submitted to Lether Robinson no later than 01 March 2019 at 4:00 pm Central Time.
.

Files

File Type Posted
Barkley_TG_Industry_Review_Slides.pdf PDF
Newport_News_Reference_Drawings.pdf PDF
Barkley_TG_Draft_TPlans.pdf PDF
Barkley_TG_Draft_TSpecs.pdf PDF
Barkley_Rehab_Draft_Bid_Schedule_V7.xlsx XLSX spreadsheet
GE_Reference_Drawings.pdf PDF
Government_Reference_Drawings.pdf PDF
Trabon_Reference_Drawings.pdf PDF
NEC_Reference_Drawing.pdf PDF

Notice history

Notice Type Posted
Barkley Turbine Generator Rehabilitation Project Award Award Notice
Barkley Turbine Generator Rehabilitation Project Latest solicitation Solicitation
Barkley Turbine Generator Rehabilitation Project Pre-Solicitation
This notice Special Notice
Turbine Generator, Barkley PP - Request for Information Original Pre-Solicitation

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors