Thule Air Base, Runway Pavement Replacement, Phase 1, Thule Air Base, Greenland

Award Notice Posted

Solicitation number
W912DS-14-B-0009
Agency
Awarded
to Munck Civil Engineering A / S
Set-aside
No set-aside

Opportunity facts

Contract number
W912DS-14-C-0019 Federal contract award
NAICS code
237310 Highway, Street, and Bridge Construction
PSC
Not on record
Place of performance
Usace District, New York Cenan-CT, 26 Federal Plaza, New York NY 10278 US

Notice details come from SAM.gov. Updated .

Notice text

3 versions

Update #3 · Latest ·

Added: Jul 14, 2014 3:04 pm  

Update #2 ·

Added: Mar 06, 2014 4:55 pm Modified: Apr 15, 2014 3:49 pmTrack Changes

Note: This solicitation and award is restricted in accordance with 10 U.S.C. 2304(c)(4) International Agreement, to Danish and Greenlandic firms ONLY.


Project: Replace Runway Pavement, Phase 1, Thule Air Base, Greenland


Synopsis:
The U.S. Army Corps of Engineers, New York District intends to issue a solicitation package seeking to award a firm-fixed price contract for the construction of the removal and replacement of approximately half (5,000 LF) of the existing asphalt runway pavement. Replacement of materials shall be through to the base course of the existing runway. This is considered to be Phase 1 of a 10,000 LF runway. Phase 1 is anticipated be awarded this calendar year approximately the June /July 2014 timeframe. The project renovations include the replacement of the runway edge lighting and other associated electrical upgrades. The other half of runway shall be kept operational during construction. The Contractor must adhere to height clearances on this active runway at all times. The construction season is short at Thule Air Base and the runway must be completed by the end of the 2015 summer/fall construction season so the full 10,000 foot runway can be used in the Winter & Spring seasons as food, supplies and personnel must be accessible to the Base. It is anticipated that the successful contractor will spend the remainder of the 2014 construction season crushing and preparing the aggregate for use in the following construction season in 2015. The solicitation package shall include an Optional Price Item for replacement / upgrade of the remaining 5,000 LF of runway to be awarded in the following Government fiscal year. The Optional Price Item will be labeled, Phase 2 of the project. Funds for the following fiscal year are anticipated by March 2015.

General Conditions at Thule Air Base: The location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May or October. Additionally, Thule's location demands that all supplies & personnel must be shipped and/or transported, in or out, via air and/or sealift. Thule Air Base is not a commercial air/sea port and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. The region is glaciated and the existing soil is generally permafrost, which exists from 1 to 6 feet below the surface and to a measured depth of 1,600 feet. Average winter temperature is 20 -30 degrees F below zero while average summer temperature is 40-50 degrees F above zero. One annual military cargo sealift departs from Norfolk, Virginia to Thule AB, approximately 1 July. There are two sealifts that go from Copenhagen, Denmark to Thule AB, one in July & one in August. Airlifting any materials or equipment via military aircraft is very expensive and only on an emergency-need basis. The project magnitude for Phase 1 is between $10M-$20M and the total project magnitude, Phase 1 and Phase 2 is between $25,000,000 -$50,000,000. The performance period for Phase 1 shall be approximately 540 calendar days from the issuance of the Notice to Proceed (NTP). The performance period of Phase 2 will extend the construction duration an additional 365 calendar days from 540 to 905 calendar days.


Anticipate the plans and specifications to be posted electronically on or about 30 April 2014 via the Federal Business Opportunity Website at www.fbo.gov, with a bid opening on or about 04 June 2014. Any and all amendments shall be likewise posted. Hard copies will not be available. It is the contractor's responsibility to monitor the FedBizOps web-site for any amendments. Bidders are required to be registered in the System for Award Management (SAM) www.sam.gov . Award will be made to the lowest responsible bidder.


Bids will be opened simultaneously at the Ministry of Foreign Affairs in Copenhagen, Denmark as well as in the Corps of Engineers, New York District office. The exact location and room number will be included in the solicitation. All questions must be submitted in writing via email, fax, or mail to the POC. The media selected for issuance of Synopsis/Solicitation and amendments shall solely be at the discretion of the Government; accordingly, the media utilized for this project shall be the internet. Telephone, email or fax requests for the solicitation will not be accepted or honored. Paper copies of this solicitation and amendments, if any, will not be available or issued. Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the solicitation is issued. Interested parties may download and print the solicitation at no charge from the Federal Business Opportunities (FedBizOpps) website, https://www.fbo.gov.


All vendors who want access to the solicitation must be registered System for Award Management (SAM) located at www.sam.gov, and FedBizOpps. To keep informed of changes, check https://www.fbo.gov frequently. Some contractor tools are as follows; 1. Register to receive notification, and 2. Subscribe to the mailing list for specific solicitation at FedBizOpps https://www.fbo.gov. A hyperlink posted in FedBizOpps will direct vendors to FedBizOpps to download solicitations, plans, specification and amendments. Project specification files and drawings are portable document files (PDF). Prospective contractors must be registered in www.sam.gov prior to award. Lack of registration in SAM will make an offeror ineligible to download the solicitation for award.


Direct all contracting questions to the Contract Specialist, Rippert Roberts III by e-mail at Rippert.P.Roberts@usace.army.mil.


Contracting Office Address: U.S. Army Corps of Engineers, New York District, Room 1843, 26 Federal Plaza, New York, N.Y. 10278-0090


 

Update #1 ·

Added: Mar 06, 2014 4:55 pm Note: This Solicitation and award is restricted in accordance with 10 U.S.C. 2304(C)(4) International agreement to Danish and Greenlandic Firms ONLY.

The U.S. Army Corps of Engineers, New York District intends to issue a solicitation package seeking to award a firm-fixed price contract for the construction of the removal and replacement of the center 170 foot keel portion, of approximately half (5,000 LF) of the existing asphalt runway pavement. Replacement of materials shall be through the upper 6 inches of base course of the existing runway. This is considered to be Phase 1 of a 10,000 LF runway. The project renovations include the replacement of the runway edge lighting, runway threshold bar, other associated electrical upgrades. The other half of runway shall be kept operational during construction. The Contractor must adhere to height clearances on this active runway at all times. The construction season is short at Thule Air Base and the runway must be completed by the end of the 2015 summer/fall construction season so the full 10,000 foot runway can be used in the Winter & Spring seasons as food, supplies and personnel must be accessible to the Base. It is anticipated that the successful contractor will spend the remainder of the 2014 construction season crushing and preparing the aggregate for use in the following construction season in 2015 .

General Conditions at Thule Air Base: The location of Thule Air Base limits exterior work to the months of June through September, although work is sometimes possible in May or October. Additionally, Thule's location demands that all supplies & personnel must be shipped and/or transported, in or out, via air and/or sealift. Thule Air Base is not a commercial air/sea port and there is no other access. Shipping schedules are dictated by Defense contracts, and materials and labor are not available locally. The region is glaciated and the existing soil is generally permafrost, which exists from 1 to 6 feet below the surface and to a measured depth of 1,600 feet. Average winter temperature is 20 -30 degrees F below zero while average summer temperature is 40-50 degrees F above zero. One annual military cargo sealift departs from Norfolk, Virginia to Thule AB, approximately 1 July. There are two sealifts that go from Copenhagen, Denmark to Thule AB, one in July & one in August. Airlifting any materials or equipment via military aircraft is very expensive and only on an emergency-need basis. The project magnitude is between $10,000,000 -$25,000,000. The performance period shall be approximately 540 calendar days from the issuance of the Notice to Proceed (NTP).

Anticipate the plans and specifications to be posted electronically on or about 18 March 2014 via the Federal Business Opportunity Website at www.fbo.gov, with a bid opening on 22 April 2014. The applicable NAICS Code is 237310 Commercial and Institutional Building Construction with a size standard of $33,500,000.00. The SIC Code is 1611. Make certain that the NAICS code of 237310 must be in the System for Award Management. Any and all amendments shall be likewise posted. Hard copies will not be available. It is the contractor's responsibility to monitor the FedBizOps web-site for any amendments. Bidders are required to be registered in the System for Award Management (SAM) www.sam.gov . Award will be made to the lowest responsible bidder.

Bids will be opened simultaneously at the Ministry of Foreign Affairs in Copenhagen, Denmark as well as in the Corps of Engineers, New York District office. The exact location and room number will be included in the solicitation. All questions must be submitted in writing via email, fax, or mail to the POC. The media selected for issuance of Synopsis/Solicitation and amendments shall solely be at the discretion of the Government; accordingly, the media utilized for this project shall be the internet. Telephone, email or fax requests for the solicitation will not be accepted or honored. Paper copies of this solicitation and amendments, if any, will not be available or issued. Plans and specifications will NOT be provided in hard paper copy or CD-ROM format. The solicitation and all amendments for this acquisition will be posted on a secure Government website known as FedBizOpps (www.fbo.gov) once the solicitation is issued. Interested parties may download and print the solicitation at no charge from the Federal Business Opportunities (FedBizOpps) website, https://www.fbo.gov.

All vendors who want access to the solicitation must be registered System for Award Management (SAM) located at www.sam.gov, and FedBizOpps. To keep informed of changes, check https://www.fbo.gov frequently. Some contractor tools are as follows; 1. Register to receive notification, and 2. Subscribe to the mailing list for specific solicitation at FedBizOpps https://www.fbo.gov. A hyperlink posted in FedBizOpps will direct vendors to FedBizOpps to download solicitations, plans, specification and amendments. Project specification files and drawings are portable document files (PDF). Prospective contractors must be registered in www.sam.gov prior to award. Lack of registration in SAM will make an offeror ineligible to download the solicitation for award.

Direct all contracting questions to the Contract Specialist Rippert Roberts III, by e-mail at Rippert.P.Roberts@usace.army.mil .

Contracting Office Address: U.S. Army Corps of Engineers, New York District, Room 1843, 26 Federal Plaza, New York, N.Y. 10278-0090

Files

File Type Posted
Thule_Runway_Phase_I _II.pdf PDF
Amendment_W912DS-14-B-0009-0003.pdf PDF
Plans_-_Phase_1_-_Amendment__2.pdf PDF
Plans_-_Phase_2_-_Amendment__2.pdf PDF
W912DS-14-B-0009-0002.pdf PDF
Appendix_R_-_FY14_-_FY17_Sealift_Rates_-_Amendment__1.pdf PDF
Spec_Section_-_32_11_16_-_Amendment__1.pdf PDF
Appendix_T_-_Fuel_Pricing_and_DLA_info_-_Amendment__1.pdf PDF
W912DS-14-B-0009_AMENDMENT_0001.pdf PDF
Appendix_Q_-_Pacer_Goose_Shipping_Instructions.pdf PDF
Appendix_I_-_Slug_Mgmt_Plan.pdf PDF
Package_1_-_Replace_Runway_Pavement_-_Specs.pdf PDF
Appendix_D_-_HWM_Plan.pdf PDF
Appendix_C_-_Conservation_Mgmt_Plan.pdf PDF
Appendix_O_-_Lead_Paint_Management_Plan.pdf PDF
Appendix_R_-_FY14_ _FY15_Sealift_Rates.pdf PDF
Appendix_E_-_Spill_Prevention-Response_Plan.pdf PDF
Appendix_N_-_Asbestos_Management_Plan.pdf PDF
W912DS-14-B-0009_SOLICITATION.pdf PDF
Appendix_A_-_Active_Landfills.pdf PDF
Appendix_M_-_PCB_Replacement_Plan.pdf PDF
Appendix_G_-_Solid_Waste_Mgmt_Plan.pdf PDF
Package_3_-_Replace_Runway_Pavement_Phase_2_-_Plans.pdf PDF
Appendix_B_-_NFS_Material_Borrow_Site.pdf PDF
Appendix_S_-_DBA_Waiver.pdf PDF
Appendix_J_-_Installation_HAZMAT_Management_Plan.pdf PDF
Package_2_-_Replace_Runway_Pavement_Phase_1_-_Plans.pdf PDF
Appendix_F_-_PPM_Plan.pdf PDF
Appendix_L_-_Affirmative_Proc_Plan.pdf PDF
Appendix_P_-_Shipping_Rates_Gov_Furnished_Transport.pdf PDF
Appendix_K_-_FGS-GL_(Environmental_Protection).pdf PDF
Appendix_H_-_Storm_Water_Mgmt_Plan.pdf PDF
Show all 32

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity