Third Port Improvements Project located in Ft. Eustis, VA.

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest special notice from .

Solicitation number
W9123622B2017
Agency
ENDIST Norfolk US Army Corps of Engineers, Department of Defense
Responses due
Set-aside
No set-aside

Opportunity facts

NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Y1KF Construction Of Dredging Facilities
Place of performance
Fort Eustis, Virginia 23604, United States

Notice details come from SAM.gov. Updated .

About this opportunity

The Norfolk District of the Army Corps of Engineers is seeking bids for the Third Port Improvements Project at Fort Eustis, Virginia. The scope of work includes removing three existing piers and replacing them with new piers to accommodate five new vessels, replacing deteriorating bulkheads, relocating a mooring pile line, and dredging the area for the new piers and mooring lines. Interested parties should monitor the PIEE website for the solicitation's release in June 2022, which will utilize sealed bid procedures and have a definitive responsibility criteria. The construction period of performance is approximately 365 days from notice to proceed.

There is no set-aside designation for this procurement. The project is estimated to have a value between $10-25 million. Key work will include new sewer, bilge, and electrical lines to service five new vessels at the new piers, dredging the creek bottom to a depth of 17 feet with an allowance for one additional foot, and hydraulically placing dredged materials in the nearby Fort Eustis Dredged Material Management Area. Interested offerors are advised to monitor the PIEE website in June 2022 for full solicitation details.

Notice text

The Norfolk District, Corps of Engineers is contemplating a firm-fixed-price contract for the 3rd Port Improvements project sponsored by Joint Base Langley-Eustis. The main objective of the project is to remove three existing piers and replace with three new piers that will accommodate five new vessels, MSV (L), to replace deteriorating bulkheads from pier 8 through pier 14, where the new finger piers will be located, remove a mooring pile line located along the northern edge of the current maintenance dredging prism and re-align the line further east, away from encroaching land, and dredge in the area if the new finger piers and mooring pile lines. The utilities for the vessels will be updated as well to accommodate the requirements of the new vessels. The new utility work will include new sanitary sewer (SS) lines from the new pier locations over to the nearest SS manhole, new bilge lines that will run from the new pier locations up to an existing holding tank, and new electrical distribution lines and transformers will be required to provide shore power to the new vessels. Dredging of the creek bottom in the finger piers to a depth of 17 feet will be required. Up to one (1) foot of over depth will be allowed. Dredging shall be accomplished by mechanical and/or hydraulic means and methods with dredged material hydraulically placed by pipeline into the nearby upland placement site, Fort Eustis Dredged Material Management Area (FEDMMA).

Attachments

Files attached to this notice, newest first
File Type Posted
Pre-Solicitaton Notice_ 3rd Port Improvements_06062022.pdf PDF

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Third Port Improvements Project located in Ft. Eustis, VA. Award Award Notice
Third Port Improvements Project located in Ft. Eustis, VA. Latest special notice Special Notice
Third Port Improvements Project located in Ft. Eustis, VA. Solicitation
Third Port Improvements Project located in Ft. Eustis, VA. This notice Pre-Solicitation
3rd Port Improvements Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity