SWSA Cranes Rental

Awarded Award Notice Posted

Solicitation number
N0003018R4001
Agency
Naval Strategic Systems Programs Department of the Navy, Department of Defense
Awarded
to North American Crane & Rigging LLC
Set-aside
No set-aside

Opportunity facts

Contract number
N0003018D0001 Federal IDV award
NAICS code
532490 Other Commercial and Industrial Machinery and Equipment Rental and Leasing
PSC
Not on record

Notice details come from SAM.gov. Updated .

Notice text

8 versions

Update #8 · Latest ·

Added: Sep 17, 2018 4:14 pm. Awarded Vendors: North American Crane & Rigging LLC. Contract Award Dollar Amount: NTE $2,870,000. Contract Award Date: 2018-08-20.

Update #7 ·

See attached amendment 0003 to extend submission date..

Update #6 ·

Please see attached request for proposal documents and accompanying attachments for details.



The purpose of this update is to revise the answer for question #2 and extend the submission date please see amendment 0002 attached.

Added: Mar 29, 2018 5:12 pm Modified: Mar 30, 2018 3:26 pmTrack Changes

Attached amendment 0001, 0002, and submitted questions and their answers are below:



SWSA Cranes Rental Questions and Answers:



1. Question: Could you clarify what, if any, below-the-hook rigging is required? Parts of the RFP suggest that all non-government rigging not required for the assembly or disassembly of cranes should be removed from those cranes. Yet other parts seem to suggest procedures and the need for at least some contractor-provided rigging below-the-hook (for example, above the D-Ring depicted on the MSU drawing). Could you please advise which interpretation is correct?


Answer: Per the Request for Proposal (Page 9) "The crane shall arrive with all necessary gear to operate immediately after all pre-op requirements are met. Cranes shall be stripped of all rigging gear except that gear that is necessary for the transport, erection, and dismantling of the crane itself. Non-Government rigging equipment brought into Government property shall be specifically marked, tagged, or color-coded differently from Government rigging equipment. The rental clock will stop in the case of time associated with stripping the crane of unneeded rigging gear."


The below-the-hook rigging may require contractor provided rigging as specified in the task order. Government providing rigging will be noted in the task order and the remaining gear needed to accomplish the lift will be provided by the contractor. The "non-government rigging not required shall be removed" is in only in reference to the crane assembly or disassembly.
Actual conduct of the weight handling event and the equipment used to accomplish the lift shall adhere to NAVFAC P-307 and NAVORDTESTUINST 11262.1.


2. Question: Is it acceptable to use water weights (in lieu of traditional, solid weights) to perform the load tests required by the Navy? If so, can CCAFS hydrants be used to obtain the water to fill the weights or would the contractor need to truck the water in? Also, if water weights are allowed, would it be permitted to drain the water on premises (i.e. in a catch basin) or would the water need to be transported off-site once the test lift was completed?


Answer: It is acceptable to use water weights to perform load testing as specified in the P-307 Weight Handling Program Management manual. CCAFS hydrants can be used to obtain the water to fill the weights; however, filling will be limited to use of an approximately 1" hose to prevent drop in system wide pressure and to utilize the installed the backflow regulator. After use, the water may be drained at the premises given that no additives have been mixed with the water.


3. Questions: Could you clarify the proper manner of submission for attachment 1? Our current understanding is that it should be submitted six (6) times, each time with the same unit pricing, but with varying quantities conforming to the information set out in the task orders. It also appears that for one of the six submissions, the quantity field is to be left blank. Does this reflect the proper procedure?
Answer: Attachment 1 shall be submitted with the proposal. It shall reflect pricing for each of the 5 years of the contract and will be become a part of the IDIQ upon award. Quantities have not yet been defined, therefor unit pricing shall be listed as suggested in the lines of the spreadsheet (hour, each, crane day). Quantities will be defined at the task order level. Contractors are required to respond to the requested task orders and representative task orders identified in the RFP by submitting an Attachment 1 for each order, which shall reflect the specific lines and quantities needed, however, the unit pricing shall be the same in each Attachment 1.


.

Update #5 ·

Added: Mar 01, 2018 2:28 pm Modified: Mar 30, 2018 3:26 pmTrack Changes

Please see attached request for proposal documents and accompanying attachments for details.


 


The purpose of this update is to revise the answer for question #2 and extend the submission date please see amendment 0002 attached.

Added: Mar 29, 2018 5:12 pm Modified: Mar 30, 2018 3:26 pmTrack Changes

Attached amendment 0001, 0002, and submitted questions and their answers are below:


 


SWSA Cranes Rental Questions and Answers:



1. Question: Could you clarify what, if any, below-the-hook rigging is required? Parts of the RFP suggest that all non-government rigging not required for the assembly or disassembly of cranes should be removed from those cranes. Yet other parts seem to suggest procedures and the need for at least some contractor-provided rigging below-the-hook (for example, above the D-Ring depicted on the MSU drawing). Could you please advise which interpretation is correct?


Answer: Per the Request for Proposal (Page 9) "The crane shall arrive with all necessary gear to operate immediately after all pre-op requirements are met. Cranes shall be stripped of all rigging gear except that gear that is necessary for the transport, erection, and dismantling of the crane itself. Non-Government rigging equipment brought into Government property shall be specifically marked, tagged, or color-coded differently from Government rigging equipment. The rental clock will stop in the case of time associated with stripping the crane of unneeded rigging gear."


The below-the-hook rigging may require contractor provided rigging as specified in the task order. Government providing rigging will be noted in the task order and the remaining gear needed to accomplish the lift will be provided by the contractor. The "non-government rigging not required shall be removed" is in only in reference to the crane assembly or disassembly.
Actual conduct of the weight handling event and the equipment used to accomplish the lift shall adhere to NAVFAC P-307 and NAVORDTESTUINST 11262.1.


2. Question: Is it acceptable to use water weights (in lieu of traditional, solid weights) to perform the load tests required by the Navy? If so, can CCAFS hydrants be used to obtain the water to fill the weights or would the contractor need to truck the water in? Also, if water weights are allowed, would it be permitted to drain the water on premises (i.e. in a catch basin) or would the water need to be transported off-site once the test lift was completed?


Answer: It is acceptable to use water weights to perform load testing as specified in the P-307 Weight Handling Program Management manual. CCAFS hydrants can be used to obtain the water to fill the weights; however, filling will be limited to use of an approximately 1" hose to prevent drop in system wide pressure and to utilize the installed the backflow regulator. After use, the water may be drained at the premises given that no additives have been mixed with the water.


3. Questions: Could you clarify the proper manner of submission for attachment 1? Our current understanding is that it should be submitted six (6) times, each time with the same unit pricing, but with varying quantities conforming to the information set out in the task orders. It also appears that for one of the six submissions, the quantity field is to be left blank. Does this reflect the proper procedure?

Answer: Attachment 1 shall be submitted with the proposal. It shall reflect pricing for each of the 5 years of the contract and will be become a part of the IDIQ upon award. Quantities have not yet been defined, therefor unit pricing shall be listed as suggested in the lines of the spreadsheet (hour, each, crane day). Quantities will be defined at the task order level. Contractors are required to respond to the requested task orders and representative task orders identified in the RFP by submitting an Attachment 1 for each order, which shall reflect the specific lines and quantities needed, however, the unit pricing shall be the same in each Attachment 1.


 

Update #4 ·

Attached amendment 0001 and submitted questions and their answers are below:



SWSA Cranes Rental Questions and Answers:



1. Question: Could you clarify what, if any, below-the-hook rigging is required? Parts of the RFP suggest that all non-government rigging not required for the assembly or disassembly of cranes should be removed from those cranes. Yet other parts seem to suggest procedures and the need for at least some contractor-provided rigging below-the-hook (for example, above the D-Ring depicted on the MSU drawing). Could you please advise which interpretation is correct?


Answer: Per the Request for Proposal (Page 9) "The crane shall arrive with all necessary gear to operate immediately after all pre-op requirements are met. Cranes shall be stripped of all rigging gear except that gear that is necessary for the transport, erection, and dismantling of the crane itself. Non-Government rigging equipment brought into Government property shall be specifically marked, tagged, or color-coded differently from Government rigging equipment. The rental clock will stop in the case of time associated with stripping the crane of unneeded rigging gear."


The below-the-hook rigging may require contractor provided rigging as specified in the task order. Government providing rigging will be noted in the task order and the remaining gear needed to accomplish the lift will be provided by the contractor. The "non-government rigging not required shall be removed" is in only in reference to the crane assembly or disassembly.
Actual conduct of the weight handling event and the equipment used to accomplish the lift shall adhere to NAVFAC P-307 and NAVORDTESTUINST 11262.1.


2. Question: Is it acceptable to use water weights (in lieu of traditional, solid weights) to perform the load tests required by the Navy? If so, can CCAFS hydrants be used to obtain the water to fill the weights or would the contractor need to truck the water in? Also, if water weights are allowed, would it be permitted to drain the water on premises (i.e. in a catch basin) or would the water need to be transported off-site once the test lift was completed?


Answer: Per P-307, Sections 4.7.1 Test Weights: Testing of cranes shall be done with the use of test weights. The use of dynamometers in lieu of lifting test weights is not permitted. Each test weight for crane tests (and for rigging gear tests where test weights are used) shall be marked with a unique identification number and the weight in pounds. The weight marked shall be the actual weight taken from the scale or other measuring device. Solid weights shall be measured using calibrated equipment traceable to the National Institute of Standards and Technology (NIST), with a minimum accuracy of +/- two percent (i.e., indicated weight shall be within +/- two percent of actual weight). Water bag type weights may be used, except for mobile crane and
category 4 crane tests. Water bag type weights shall be used and stored in accordance with OEM recommendations. The metering device/gauge used to determine the amount of water in the bag shall be calibrated annually using equipment traceable to NIST, and shall ensure that the weight has a minimum accuracy of +/- two percent. Alternatively, a load indicating device (LID) meeting the above calibration and accuracy requirements may be used in lieu of a metering device. A list of test weights, with identification numbers and weights shall be retained. The list shall include the type and serial number (or other identifier) of the weighing device(s) used to weigh the test weights. Where a lifting attachment supports multiple test weights (e.g., stacked weights or multiple weights suspended from a padeye), the total capacity shall be marked on the attachment.


3. Questions: Could you clarify the proper manner of submission for attachment 1? Our current understanding is that it should be submitted six (6) times, each time with the same unit pricing, but with varying quantities conforming to the information set out in the task orders. It also appears that for one of the six submissions, the quantity field is to be left blank. Does this reflect the proper procedure?
Answer: Attachment 1 shall be submitted with the proposal. It shall reflect pricing for each of the 5 years of the contract and will be become a part of the IDIQ upon award. Quantities have not yet been defined, therefor unit pricing shall be listed as suggested in the lines of the spreadsheet (hour, each, crane day). Quantities will be defined at the task order level. Contractors are required to respond to the requested task orders and representative task orders identified in the RFP by submitting an Attachment 1 for each order, which shall reflect the specific lines and quantities needed, however, the unit pricing shall be the same in each Attachment 1.


.

Update #3 ·

Added: Mar 29, 2018 5:12 pm

Attached amendment 0001 and submitted questions and their answers are below:


 


SWSA Cranes Rental Questions and Answers:



1. Question: Could you clarify what, if any, below-the-hook rigging is required? Parts of the RFP suggest that all non-government rigging not required for the assembly or disassembly of cranes should be removed from those cranes. Yet other parts seem to suggest procedures and the need for at least some contractor-provided rigging below-the-hook (for example, above the D-Ring depicted on the MSU drawing). Could you please advise which interpretation is correct?


Answer: Per the Request for Proposal (Page 9) "The crane shall arrive with all necessary gear to operate immediately after all pre-op requirements are met. Cranes shall be stripped of all rigging gear except that gear that is necessary for the transport, erection, and dismantling of the crane itself. Non-Government rigging equipment brought into Government property shall be specifically marked, tagged, or color-coded differently from Government rigging equipment. The rental clock will stop in the case of time associated with stripping the crane of unneeded rigging gear."


The below-the-hook rigging may require contractor provided rigging as specified in the task order. Government providing rigging will be noted in the task order and the remaining gear needed to accomplish the lift will be provided by the contractor. The "non-government rigging not required shall be removed" is in only in reference to the crane assembly or disassembly.
Actual conduct of the weight handling event and the equipment used to accomplish the lift shall adhere to NAVFAC P-307 and NAVORDTESTUINST 11262.1.


2. Question: Is it acceptable to use water weights (in lieu of traditional, solid weights) to perform the load tests required by the Navy? If so, can CCAFS hydrants be used to obtain the water to fill the weights or would the contractor need to truck the water in? Also, if water weights are allowed, would it be permitted to drain the water on premises (i.e. in a catch basin) or would the water need to be transported off-site once the test lift was completed?


Answer: Per P-307, Sections 4.7.1 Test Weights: Testing of cranes shall be done with the use of test weights. The use of dynamometers in lieu of lifting test weights is not permitted. Each test weight for crane tests (and for rigging gear tests where test weights are used) shall be marked with a unique identification number and the weight in pounds. The weight marked shall be the actual weight taken from the scale or other measuring device. Solid weights shall be measured using calibrated equipment traceable to the National Institute of Standards and Technology (NIST), with a minimum accuracy of +/- two percent (i.e., indicated weight shall be within +/- two percent of actual weight). Water bag type weights may be used, except for mobile crane and
category 4 crane tests. Water bag type weights shall be used and stored in accordance with OEM recommendations. The metering device/gauge used to determine the amount of water in the bag shall be calibrated annually using equipment traceable to NIST, and shall ensure that the weight has a minimum accuracy of +/- two percent. Alternatively, a load indicating device (LID) meeting the above calibration and accuracy requirements may be used in lieu of a metering device. A list of test weights, with identification numbers and weights shall be retained. The list shall include the type and serial number (or other identifier) of the weighing device(s) used to weigh the test weights. Where a lifting attachment supports multiple test weights (e.g., stacked weights or multiple weights suspended from a padeye), the total capacity shall be marked on the attachment.


3. Questions: Could you clarify the proper manner of submission for attachment 1? Our current understanding is that it should be submitted six (6) times, each time with the same unit pricing, but with varying quantities conforming to the information set out in the task orders. It also appears that for one of the six submissions, the quantity field is to be left blank. Does this reflect the proper procedure?

Answer: Attachment 1 shall be submitted with the proposal. It shall reflect pricing for each of the 5 years of the contract and will be become a part of the IDIQ upon award. Quantities have not yet been defined, therefor unit pricing shall be listed as suggested in the lines of the spreadsheet (hour, each, crane day). Quantities will be defined at the task order level. Contractors are required to respond to the requested task orders and representative task orders identified in the RFP by submitting an Attachment 1 for each order, which shall reflect the specific lines and quantities needed, however, the unit pricing shall be the same in each Attachment 1.


 

Update #2 ·

Please see attached request for proposal documents and accompanying attachments for details..

Update #1 ·

Added: Mar 01, 2018 2:28 pm Please see attached request for proposal documents and accompanying attachments for details.

Attachments

Files attached to this notice, newest first
File Type Posted
N0003018R4001_0003.pdf PDF
N0003018R4001_0002.pdf PDF
N0003018R4001_0001.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF
Attachment_5_-_Representative_Task_Order.pdf PDF
N0003018R4001_SWSA_Cranes_RFP.pdf PDF
Attachment_2_-_NAVFAC_P-307_June_2016.pdf PDF
Attachment_4_-_NOTUINST11262.1A_-_Crane_instruction__Chapter_9.pdf PDF
Attachment_1_-_ELIN_Pricing_rev_1.xlsx XLSX spreadsheet