Steel Storage Services for LBNF/DUNE US Project
Closed Solicitation Posted
- Solicitation number
- LBNF-343096-JD
- Agency
- Fermi National Accelerator Laboratory Office of Science, Department of Energy
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 493190 Other Warehousing and Storage
- PSC
- M1GD Operation Of Open Storage Facilities
- Place of performance
- United States
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Contract Opportunity involves the provision of storage and handling services for cryostat steel and fastening materials for the Long-Baseline Neutrino Facility (LBNF) Project led by the Fermi Research Alliance, LLC (FRA). The subcontractor will be required to provide personnel, equipment, tools, materials, and supervision for the receipt, handling, storage, and loading of the LBNF materials. The storage services are required for materials that will consist of structural steel, warm skin steel, and fasteners, with an estimated maximum storage need equivalent to 6900 US Tons.
Products and Services to be provided:
- Receipt, handling, storage, and loading of LBNF materials.
- Provision of personnel, equipment, tools, and materials for the storage services.
- Management of a Steel Storage Management System.
- Security services for the stored equipment.
- Inventory management services.
Notice text
3 versions
Update #3 · Latest ·
NOTE: AMENDMENTS 01 AND 02 HAVE BEEN POSTED. SEE ATTACHMENT SECTION FOR DETAILS
Pursuant to its Prime Contract with the U.S. Department of Energy (DOE), the Fermi Research Alliance, LLC (FRA), is leading the Long-Baseline Neutrino Facility (LBNF) Project to enable a world-class program in neutrino physics. Specifically, the LBNF Project (https://lbnf-dune.fnal.gov) provides the infrastructure for the Deep Underground Neutrino Experiment (DUNE) which will consist of two large liquid argon-based neutrino detectors located nearly a mile underground at the Sanford Underground Research Facility (SURF) in Lead, SD.
FRA requires storage and handling services for cryostat steel and fastening materials asssociated with LBNF. The selected Subcontractor will be required to provide all personnel, equipment, tools, materials, and supervision for the necessary steel storage services to provide the receipt, handling, storage, and loading of the LBNF materials. The LBNF project will also require intermittent access for their QA/QC team at the steel storage location.
Steel storage services are required for materials that will consist of structural steel, warm skin steel and fasteners, to be used to construct the LBNF cryostats. The estimated maximum storage needs are equivalent to 6900 US Tons.
The steel storage location shall be located within approximately a 90-mile distance traveling by roadway or a maximum 2-hour one-way trip from Lead, SD.
The Steel Storage location must have an all-weather surface capable of supporting identified loads. The Steel Storage location must have accommodations for dry storage of approximately 550 US tons of fasteners. Material handling equipment intended for use must be capable of handling all materials identified in this RFP under own power and without the assistance of a secondary piece of equipment.
Complete details of the required steel storage services are available by downloading Request for Proposals (RFP) LBNF-343096-JD and its Attachments.
Update #2 ·
NOTE: AMENDMENT 01 HAS BEEN POSTED. SEE ATTACHMENT SECTION FOR DETAILS 08-02-2023
Pursuant to its Prime Contract with the U.S. Department of Energy (DOE), the Fermi Research Alliance, LLC (FRA), is leading the Long-Baseline Neutrino Facility (LBNF) Project to enable a world-class program in neutrino physics. Specifically, the LBNF Project (https://lbnf-dune.fnal.gov) provides the infrastructure for the Deep Underground Neutrino Experiment (DUNE) which will consist of two large liquid argon-based neutrino detectors located nearly a mile underground at the Sanford Underground Research Facility (SURF) in Lead, SD.
FRA requires storage and handling services for cryostat steel and fastening materials asssociated with LBNF. The selected Subcontractor will be required to provide all personnel, equipment, tools, materials, and supervision for the necessary steel storage services to provide the receipt, handling, storage, and loading of the LBNF materials. The LBNF project will also require intermittent access for their QA/QC team at the steel storage location.
Steel storage services are required for materials that will consist of structural steel, warm skin steel and fasteners, to be used to construct the LBNF cryostats. The estimated maximum storage needs are equivalent to 6900 US Tons.
The steel storage location shall be located within approximately a 90-mile distance traveling by roadway or a maximum 2-hour one-way trip from Lead, SD.
The Steel Storage location must have an all-weather surface capable of supporting identified loads. The Steel Storage location must have accommodations for dry storage of approximately 550 US tons of fasteners. Material handling equipment intended for use must be capable of handling all materials identified in this RFP under own power and without the assistance of a secondary piece of equipment.
Complete details of the required steel storage services are available by downloading Request for Proposals (RFP) LBNF-343096-JD and its Attachments.
Update #1 ·
Pursuant to its Prime Contract with the U.S. Department of Energy (DOE), the Fermi Research Alliance, LLC (FRA), is leading the Long-Baseline Neutrino Facility (LBNF) Project to enable a world-class program in neutrino physics. Specifically, the LBNF Project (https://lbnf-dune.fnal.gov) provides the infrastructure for the Deep Underground Neutrino Experiment (DUNE) which will consist of two large liquid argon-based neutrino detectors located nearly a mile underground at the Sanford Underground Research Facility (SURF) in Lead, SD.
FRA requires storage and handling services for cryostat steel and fastening materials asssociated with LBNF. The selected Subcontractor will be required to provide all personnel, equipment, tools, materials, and supervision for the necessary steel storage services to provide the receipt, handling, storage, and loading of the LBNF materials. The LBNF project will also require intermittent access for their QA/QC team at the steel storage location.
Steel storage services are required for materials that will consist of structural steel, warm skin steel and fasteners, to be used to construct the LBNF cryostats. The estimated maximum storage needs are equivalent to 6900 US Tons.
The steel storage location shall be located within approximately a 90-mile distance traveling by roadway or a maximum 2-hour one-way trip from Lead, SD.
The Steel Storage location must have an all-weather surface capable of supporting identified loads. The Steel Storage location must have accommodations for dry storage of approximately 550 US tons of fasteners. Material handling equipment intended for use must be capable of handling all materials identified in this RFP under own power and without the assistance of a secondary piece of equipment.
Complete details of the required steel storage services are available by downloading Request for Proposals (RFP) LBNF-343096-JD and its Attachments.
Attachments
Show all 18
On GovTribe
Work this opportunity on GovTribe
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity