Stanley Lake Road and Alturas Lake Road Pavement Maintenance Project, Sawtooth NF
Closed Pre-Solicitation Posted
This opportunity was awarded. See the award notice from , or the latest solicitation from .
- Solicitation number
- 1240LT22R0054
- Agency
-
Forest Service
Department of Agriculture
- Responses due
- Set-aside
- Total Small Business
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Stanley, Idaho 83278, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for a pavement maintenance project on Stanley Lake Road and Alturas Lake Road located in the Sawtooth National Forest in Idaho. The USDA Forest Service will reconstruct approximately 1.7 miles of Alturas Lake Road and then chip seal approximately 5.1 miles. Additionally, they will chip seal 4.4 miles of Stanley Lake Road along with other work such as asphalt patching and crack sealing. The solicitation will be awarded on a firm-fixed price basis to the responsible offeror whose offer conforms to all material terms and is lowest in price. The deadline for questions is June 7, 2022.
This will be set aside for total small business concerns. The primary NAICS code is 237310 for highway, street, and bridge construction with a size standard of $39.5 million. There will be a site visit on May 17th. The contract is designated for a period of 60 days beginning after September 5, 2022 with an anticipated value between $1,000,000 and $5,000,000. Offerors must be registered in SAM before award and the solicitation package will be available through SAM.gov on or around May 6, 2022.
Notice text
Presolicitation Notice
Stanley Lake Road and Alturas Lake Road Pavement Maintenance Project, Sawtooth NF
1240LT22R0054
PROJECT DESCRIPTION
This project consists of chip sealing 4.4 miles of Stanley Lake Road as well as the reconstruction of approximately 1.7 miles of Alturas Lake Road and then chip sealing approximately 5.1 miles of double lane road. Other work associated with the project includes asphalt concrete patching, crack sealing, pre-leveling in areas where the existing asphalt is uneven and at road intersections, and striping.
Reconstruction of the road includes but not limited to grinding the existing surface, placing six inches of roadway base mix, compacting and placing three inches of hot mix asphalt for a 24 foot double lane roadway surface.
PROJECT LOCATION
Stanley Lake Road is located approximately 5 miles west of Stanley, Idaho on Highway 21. Alturas Lake
Road is located approximately 22 miles south of Stanley, Idaho on US Highway 93.
Site Visit
May 17th, meet at Stanley Lake at 11 (at the information kiosk near the entrance) and Alturas Lake at 1330
near the intersection with Hwy 93.
Contract Time
The contract time is 60 days beginning after September 5, 2022 (Labor Day).
The magnitude of proposed project is between $1,000,000 and $5,000,000.
Project drawings will be provided as attachments to the Request for Proposal (RFP).
The complete solicitation package will be attached and made available only through SAM.gov, https://sam.gov/content/home on or within 15 days of this notice. Anyone wishing to participate in this proposed procurement must obtain their copy from SAM.gov. Copies will not be mailed from the Contracting Office. All amendments will be posted on SAM.gov. Contractors will be solely responsible for obtaining amendments from this site to update files.
This requirement is being solicited as a Small Business set-aside in accordance with Federal Acquisition Regulation (FAR) 19.5, with the intent to award a Firm-Fixed Price contract. A single award will be made from the solicitation.
All prospective contractors must be registered in the System for Award Management (SAM) database at http:www.sam/gov/ before award of contract; failure to register in the SAM database may cause your firm to be ineligible for the award and removed from consideration.
NAICS: 237310, $39.5M
Notice history
| Notice | Type | Posted |
|---|---|---|
| Stanley Lake Road and Alturas Lake Road Pavement Maintenance Project, Sawtooth NF | Award Notice | |
| Stanley Lake Road and Alturas Lake Road Pavement Maintenance Project, Sawtooth NF | Solicitation | |
| This notice | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Custer Gallatin National Forest Ashland and Sioux Road Maintenance | Region 6 - Pacific Northwest Region | Total Small Business | |
| Access Road Repair National Elk Refuge | — | Total Small Business | |
| Administrative Parking Lot Repairs | Forest Service | Total Small Business | |
| GAOA Brainard Lake Recreation Area Deferred Maintenance | Forest Service | Total Small Business | |
| Jake Rocks Road Reconstruction | Forest Service | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity