Sitkoh River Stream Restoration

Awarded Award Notice Posted

Solicitation number
AG-0116-S-11-0084
Agency
Region 10 - Alaska Region Forest Service, Department of Agriculture
Awarded
to Aqua Terra Restoration LLC
Set-aside
Total Small Business

Opportunity facts

Contract number
AG-0116-C-11-0080 Federal contract award
NAICS code
237990 Other Heavy and Civil Engineering Construction
PSC
Not on record
Place of performance
Located on the Sitka Ranger District on Chichagof Island along the False Island road system in Southeast Alaska. Chichagof Island, Alaska, United States

Notice details come from SAM.gov. Updated .

Notice text

Added: Apr 22, 2011 6:29 pm The purpose of this proposed solicitation is Restoration work including furnishing all materials, equipment and labor required to rehabilitate 1 mile of stream corridor and the adjoining floodplain.  Work includes clearing, excavation, material (rock, logs, rootwads, etc.) gathering, material haul, reconstruction of roads, construction of access roads, installation and removal of drainage structures, construction of log and rock structures, hauling, placement of borrow materials, and dewatering.  This will include instream work.

Primary construction and work activities take place along the Sitkoh River and the adjacent roadways.  Material gathering sites are located along FDR 7540 and its adjacent spurs within 1 mile of their junction with FDR 7540 from approximately MP 8 to MP 14.  Materials will also be gathered along FDR 7553 and its adjacent spurs within 1 mile of their junction with FDR 7553 between approximately MP 0.0 to MP 2 on FDR 7553.  Existing log stockpile is located adjacent to the False Island sort yard near the marine facility.  Instream work will occur in and along the Sitkoh River adjacent to FDR 7540 between MP 8 to MP 13.5 and FDR 7553 from MP 0 to MP1.

The anticipated performance period is between the end of June and early August. 

The solicitation will be posted on FedBizOpps website on or about May 9th, 2011.  Offers will be due approximately 30 calendar days after the solicitation date.

AUTOMATIC NOTIFICATION: By registering to receive notification on posted synopses, you will be automatically notified via email of any changes to the project. To register, select Register to Receive Notification and follow the steps. Follow the same procedure for EACH project. PLAN HOLDERS LISTS: The Interested Vendors List (IVL) has replaced the plan Holders Lists that was previously available with solicitation packages. Access the IVL for all projects through the FedBizOpps website. To register as an interested vendor, select Register as an Interested Vendor and follow the steps. Follow this procedure for EACH project of interest. Use the Register as Interested Vendor option to add your company name to the IVL and then view or print the IVL by selecting View List of Interested Vendors for each project.<><>


In order to receive any contract award, Vendors must be registered in the Central Contractor Registration (CCR) and Online Representations and Certifications Application (ORCA). To register your firm in the CCR system, go to: http://www.ccr.gov or by calling 1-888-227-2423 or 269-961-5757. To register your firm in the ORCA system, go to: http://www.bpn.gov.
The USDA is an equal opportunity provider and employer.

Attachments

Files attached to this notice, newest first
File Type Posted
AG-0116-S-11-0084-_TM-A004.pdf PDF
AG-0116-S-11-0084_FP-A005.pdf PDF
AG-0116-S-11-0084_FP-A004.pdf PDF
AG-0116-S-11-0084-_TM-A003.pdf PDF
AG-0116-S-11-0084_FP-A003.pdf PDF
AG-0116-S-11-0084-_TM-A002.pdf PDF
AG-0116-S-11-0084_FP-A002.pdf PDF
AG-0116-S-11-0084_TM-A001.pdf PDF
AG-0116-S-11-0084_FP-A001.pdf PDF
P5_sitkoh_river_channel_DesignBG_2011_0127.pdf PDF
SITKOH_RIVER_ATTACHMENT D_ProjectAreaMap.docx DOCX document
Sitkoh_RIVER_ATTACHMENT_C_LogComplex Detail.doc DOC document
AG-0116-S-11-0084_FFP_051211.pdf PDF
Appendix B_sitkoh_river_existing_condition_bg_2011_0126.pdf PDF
P4_sitkoh_river_LOG_JAM_crib_DETAILS log jam.pdf PDF
P2b_SITKOH_RIVER_local_vicin_map_2011_0126.pdf PDF
Sitkoh River Restoration-ADFG comments-final.pdf PDF
P1_SITKOH_RIVER_title_vicin_map_2011_0125.pdf PDF
OMB_Experience Capability Questionnaire.docx DOCX document
WageDetermination_AK100001_042911.pdf PDF
Sitkoh_RIVER_ATTACHMENT_B_LogComplexDetail.docx DOCX document
AG-0116-S-11-0084_T M_051211.pdf PDF
Appendix_A_response_to_Sources Sought Qs_042811.docx DOCX document
P2a_COLOR_SITKOH_RIVER_local_vicin_map_2011_0126.pdf PDF
Sitkoh_river_specs_bg_2011_0210.doc DOC document
P6_CROSS_CHANNEL_LOG_JAM_DETAILS log jam det.pdf PDF
Sitkoh_RIVER_ATTACHMENT_A_DebrisPlacementExample.doc DOC document
P3_river_crossing main river xing.pdf PDF
Show all 28

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity