Sitkoh_RIVER_ATTACHMENT_B_LogComplexDetail.docx

DOCX document 21 KB Posted

Attached to
Sitkoh River Stream Restoration Federal contract opportunity
Solicitation number
AG-0116-S-11-0084
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Attachment B

View the file

Other files for this federal contract opportunity

Other files attached to Sitkoh River Stream Restoration, newest first.
File Type Posted
AG-0116-S-11-0084-_TM-A004.pdf PDF
AG-0116-S-11-0084_FP-A005.pdf PDF
AG-0116-S-11-0084_FP-A004.pdf PDF
AG-0116-S-11-0084-_TM-A003.pdf PDF
AG-0116-S-11-0084-_TM-A002.pdf PDF
AG-0116-S-11-0084_FP-A003.pdf PDF
AG-0116-S-11-0084_TM-A001.pdf PDF
AG-0116-S-11-0084_FP-A002.pdf PDF
AG-0116-S-11-0084_FP-A001.pdf PDF
AG-0116-S-11-0084_T M_051211.pdf PDF
Appendix_A_response_to_Sources Sought Qs_042811.docx DOCX document
P2a_COLOR_SITKOH_RIVER_local_vicin_map_2011_0126.pdf PDF
Sitkoh_river_specs_bg_2011_0210.doc DOC document
P6_CROSS_CHANNEL_LOG_JAM_DETAILS log jam det.pdf PDF
Sitkoh_RIVER_ATTACHMENT_A_DebrisPlacementExample.doc DOC document
P3_river_crossing main river xing.pdf PDF
AG-0116-S-11-0084_FFP_051211.pdf PDF
Appendix B_sitkoh_river_existing_condition_bg_2011_0126.pdf PDF
P4_sitkoh_river_LOG_JAM_crib_DETAILS log jam.pdf PDF
P2b_SITKOH_RIVER_local_vicin_map_2011_0126.pdf PDF
Sitkoh River Restoration-ADFG comments-final.pdf PDF
P1_SITKOH_RIVER_title_vicin_map_2011_0125.pdf PDF
OMB_Experience Capability Questionnaire.docx DOCX document
WageDetermination_AK100001_042911.pdf PDF
P5_sitkoh_river_channel_DesignBG_2011_0127.pdf PDF
SITKOH_RIVER_ATTACHMENT D_ProjectAreaMap.docx DOCX document
Sitkoh_RIVER_ATTACHMENT_C_LogComplex Detail.doc DOC document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT B

Plan View

NOTES:

1) Excavate toe log trenches perpendicular to flow and into bank below bed surface at maximum predicted scour depth. 2) Excavate torsion Log trenches 15 &20% to flow and to bed surface elevation. Top of torsion log elevation should exceed 3-5 year discharge return interval elevation. 3) Place weave additional trees, logs, large boulders, slash or root-wads in apex of structure. 4) Place ample slash and small woody debris on the up-stream bank interface of the structure.

FMF Formidable Multi-faceted Log Complex Direction of Flow 3 & 4 Terrace Riffle Pool Head Maximum Pool Depth Pool Tail Crest

USDA

FOREST

SERVICE

TONGASS N.F. CRAIG RD

STRUCTUE: Channel Rehabilitation

DATE: 3/20053

DESIGNED BY:

BRIAN BAIR

REVIEWED

BY:

BOB GUBERNICK

image1.png

File details come from the government source that posted it. Updated .