Sitkoh_RIVER_ATTACHMENT_C_LogComplex Detail.doc

DOC document 93 KB Posted

Attached to
Sitkoh River Stream Restoration Federal contract opportunity
Solicitation number
AG-0116-S-11-0084
Issued by
Department of Agriculture Forest Service R10-Alaska Region

About this file

Attachment C

View the file

Other files for this federal contract opportunity

Other files attached to Sitkoh River Stream Restoration, newest first.
File Type Posted
AG-0116-S-11-0084-_TM-A004.pdf PDF
AG-0116-S-11-0084_FP-A005.pdf PDF
AG-0116-S-11-0084_FP-A004.pdf PDF
AG-0116-S-11-0084-_TM-A003.pdf PDF
AG-0116-S-11-0084-_TM-A002.pdf PDF
AG-0116-S-11-0084_FP-A003.pdf PDF
AG-0116-S-11-0084_TM-A001.pdf PDF
AG-0116-S-11-0084_FP-A002.pdf PDF
AG-0116-S-11-0084_FP-A001.pdf PDF
Sitkoh River Restoration-ADFG comments-final.pdf PDF
P1_SITKOH_RIVER_title_vicin_map_2011_0125.pdf PDF
OMB_Experience Capability Questionnaire.docx DOCX document
WageDetermination_AK100001_042911.pdf PDF
Sitkoh_RIVER_ATTACHMENT_B_LogComplexDetail.docx DOCX document
AG-0116-S-11-0084_T M_051211.pdf PDF
Appendix_A_response_to_Sources Sought Qs_042811.docx DOCX document
P2a_COLOR_SITKOH_RIVER_local_vicin_map_2011_0126.pdf PDF
Sitkoh_river_specs_bg_2011_0210.doc DOC document
P6_CROSS_CHANNEL_LOG_JAM_DETAILS log jam det.pdf PDF
Sitkoh_RIVER_ATTACHMENT_A_DebrisPlacementExample.doc DOC document
P3_river_crossing main river xing.pdf PDF
AG-0116-S-11-0084_FFP_051211.pdf PDF
Appendix B_sitkoh_river_existing_condition_bg_2011_0126.pdf PDF
P4_sitkoh_river_LOG_JAM_crib_DETAILS log jam.pdf PDF
P2b_SITKOH_RIVER_local_vicin_map_2011_0126.pdf PDF
P5_sitkoh_river_channel_DesignBG_2011_0127.pdf PDF
SITKOH_RIVER_ATTACHMENT D_ProjectAreaMap.docx DOCX document
Show all 27

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT C

USDA FOREST SERVICE

TONGASS N.F. CRAIG RD

STRUCTUE: FMF BI SECTION

DATE: 3/20053

DESIGNED BY: BRIAN BAIR

REVIEWED BY: BOB GUBERNICK

Bi-Section View

NOTES:

FMF Formidable Multi-faceted Log Complex

Maximum Scour Depth

Top of Bank / Flood Prone Terrace

Bankfull

Elevation

Direction of Flow

Stream Bed

Elevation

1) Excavate toe log trenches perpendicular to flow and into bank below bed surface at maximum predicted scour depth. 2) Excavate torsion Log trenches 15 &20% to flow and to bed surface elevation. Top of torsion log elevation should exceed 3-5 year discharge return interval elevation. 3) Place weave additional trees, logs, large boulders, slash or root-wads in apex of structure. 4) Place ample slash and small woody debris on the up-stream bank interface of the structure.

File details come from the government source that posted it. Updated .