About this opportunity

The Federal Highway Administration is seeking a contractor to perform pavement reconstruction services for the Madison Wetland Management District Headquarters and United States Fish and Wildlife Service Visitor Center access road and parking lot. The project scope includes constructing a consistent 14-foot roadway section, reconstructing the approach road apron, and completely rebuilding the existing parking lot with updated pavement markings and drainage improvements. Key objectives are to improve safety and mobility for staff and visitors while extending the service life of the access and parking surfaces. This pre-solicitation notice indicates that detailed plans and specifications are not yet available, and a formal invitation for bid has not been issued. The notice was posted on April 29, 2026, with a response deadline of May 14, 2026, allowing potential bidders approximately two weeks to submit questions or expressions of interest.

This procurement carries no set-aside designation, making it open to all qualified contractors. The principal work items include 550 cubic yards of roadway excavation, 200 cubic yards of subexcavation, 600 tons of roadway aggregate, and asphalt concrete pavement installation designed as 3.5 inches of ACP over 4 inches of aggregate base material. The parking lot will feature 18 total parking stalls (8 on the north side with one ADA-accessible space and 10 on the south side), all sized at 10 feet by 20 feet with a uniform 1.75 percent cross slope. No incumbent contractor or specific budget range is identified in this pre-solicitation notice, and potential bidders should monitor for the full solicitation release containing complete specifications and cost estimates.

Notice text

2 versions

Update #2 · Latest ·

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE

PROJECT NUMBER:SD FTFW MADI 10(2) & 9000(1)

PROJECT NAME:REHAB MADISON WMD HQ ROAD

PROJECT DESCRIPTION: 

The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces.

SCOPE OF THE WORK: 

The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74.

The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break.

PRINCIPAL WORK ITEMS:

  • 20401-0000 Roadway Excavation: 550 CUYD
  • 20402-0000 Subexcavation: 200 CUYD
  • 30202-2000 Roadway Aggregate, Method 2: 600 TON
  • 40301-0000 Asphalt Concrete Pavement, 500 TON

ANTICIPATED SCHEDULE: 

Advertisement – May 2026

Award – July 2026

NTP – July 2026

Contract Completion – October 2026

ESTIMATED COST RANGE:  Total estimated cost between $501,000 and $1,000,000.

Update #1 ·

THIS IS NOT AN INVITIATION FOR BID, PLAN AND SPECIFICATIONS ARE NOT AVAILBLE

PROJECT NUMBER:SD FTFW MADI 10(2) & 9000(1)

PROJECT NAME:REHAB MADISON WMD HQ ROAD

PROJECT DESCRIPTION: 

The scope of this project includes pavement reconstruction to the approach road and parking lot for the Madison Wetland Management District (WMD) Headquarters and the United States Fish and Wildlife Service (USFWS) Visitor Center. The designed pavement section is proposed to be 3.5 inches of asphalt concrete pavement (ACP) over 4 inches of aggregate base material. The proposed parking lot will be installed at grade with the adjacent sidewalk and concrete trail. The project will improve safety and mobility for staff and visitors by providing improved access to and parking for the Payne Waterfowl Production Area (WPA). The pavement improvements will also extend the service life of the access road and parking lot wearing surfaces.

SCOPE OF THE WORK: 

The existing two-way, single-lane operation of the access road will be preserved by constructing a consistent 14-foot roadway section. Pavement reconstruction will also address the approach road apron on the left side of the roadway between stations 106+02 and 106+74.

The project also includes full reconstruction of the existing parking lot and the asphalt apron on its east side, which connects to the concrete trail leading to the visitor center’s east entrance. The updated pavement marking layout will provide eight 10-foot by 20-foot parking stalls with one accessible stall on the north side, and ten 10-foot by 20-foot stalls on the south side. The northern edge of the parking area will maintain its existing tie-in elevation with the 6-foot sidewalk, and the parking surface will be regraded to a uniform 1.75% cross slope, removing the existing centerline grade break.

PRINCIPAL WORK ITEMS:

  • 20401-0000 Roadway Excavation: 550 CUYD
  • 20402-0000 Subexcavation: 200 CUYD
  • 30202-2000 Roadway Aggregate, Method 2: 600 TON
  • 40301-0000 Asphalt Concrete Pavement, 500 TON

ANTICIPATED SCHEDULE: 

Advertisement – May 2026

Award – July 2026

NTP – July 2026

Contract Completion – October 2026

ESTIMATED COST RANGE:  Total estimated cost between $700,000 and $2,000,000

Notice history

Notice Type Posted
SD ftfw madi 10(2) & 9000(1) rehab madison WMD HQ road Award Award Notice
SD ftfw madi 10(2) & 9000(1) rehab madison WMD HQ road Latest solicitation Solicitation
This notice Pre-Solicitation
SD ftfw madi 10(2) & 9000(1) rehab madison WMD HQ road Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
MN-FWS tamarac VC parking seal coat NAICS 236220 — Total Small Business
ND OMAD 2025(1) Minuteman Missile Access Road Minot, North Dakota, United States · NAICS 237310 Federal Highway Administration Total Small Business
CO OMAD 300(71) Minuteman Missile Access Cheyenne, Wyoming, United States · NAICS 237310 Federal Highway Administration Total Small Business
OK FW TSM 10(1) NFH Entrance Road and Parking Improvements Tishomingo, Oklahoma 73460, United States · NAICS 237310 Federal Highway Administration Total Small Business
MN fergus falls WMD prking rehab NAICS 541330 — Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors