Scarborough River Maintenance Dredging

Closed Solicitation Posted

Solicitation number
W912WJ23B0004
Agency
Responses due
Set-aside
No set-aside

Opportunity facts

Notice details come from SAM.gov. Updated .

About this opportunity

The U.S. Army Corps of Engineers, Engineering District New England seeks to award a firm fixed-price contract to hydraulically dredge approximately 111,000 cubic yards of sandy material from channels and an anchorage in the Scarborough River, Maine and pump it approximately 6,000 feet to a beach for disposal. Dredging and disposal operations must occur between November 1, 2023 and March 1, 2024 to comply with environmental restrictions. Bids were due by July 6, 2023 and will be evaluated for price and technical acceptability.

There is no set-aside designation. The work involves hydraulic dredging services under NAICS code 237990 and PSC code D301. Bids were received from Michels Construction, Inc. at $4,515,757.42, H&L Contracting, LLC at $3,844,100.00, and The Dutra Group at $5,998,000 with an government estimate of $2,759,700.00. Approximately 111,000 cubic yards will be dredged from the Scarborough River and pumped approximately 6,000 feet to Western Beach for disposal between November 2023 and March 2024 in Scarborough, Maine.

Notice text

3 versions

Update #3 · Latest ·

The proposed work consists of hydraulically dredging approximately 111,000 cubic yards (cy) of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage (below Mean Lower Low Water) and placing the material on Western Beach. Sandy shoal material dredged from the project will be pumped approximately 6,000 ft to Western Beach which is just north of the 8-foot entrance channel in Scarborough, ME. Of the 111,000 cy project total approximately 76,000 cy is required dredging with the remaining 35,000 cy considered 1-foot of allowable overdepth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Scarborough River sees tide ranges as high as 10+ feet during normal tide cycles. Dredging and disposal operations will be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year (TOY) restrictions.

Update #2 ·

The proposed work consists of hydraulically dredging approximately 111,000 cubic yards (cy) of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage (below Mean Lower Low Water) and placing the material on Western Beach. Sandy shoal material dredged from the project will be pumped approximately 6,000 ft to Western Beach which is just north of the 8-foot entrance channel in Scarborough, ME. Of the 111,000 cy project total approximately 76,000 cy is required dredging with the remaining 35,000 cy considered 1-foot of allowable overdepth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Scarborough River sees tide ranges as high as 10+ feet during normal tide cycles. Dredging and disposal operations will be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year (TOY) restrictions.

Update #1 ·

The proposed work consists of hydraulically dredging approximately 111,000 cubic yards (cy) of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage (below Mean Lower Low Water) and placing the material on Western Beach. Sandy shoal material dredged from the project will be pumped approximately 6,000 ft to Western Beach which is just north of the 8-foot entrance channel in Scarborough, ME. Of the 111,000 cy project total approximately 76,000 cy is required dredging with the remaining 35,000 cy considered 1-foot of allowable overdepth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Scarborough River sees tide ranges as high as 10+ feet during normal tide cycles. Dredging and disposal operations will be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year (TOY) restrictions.

Please see full solicitation at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912WJ23B0004.

Files

File Type Posted
Bid Abstract.pdf PDF
Amendment 0002.pdf PDF
Amendment 0001.pdf PDF
Plans.pdf PDF
W912WJ23B0004.pdf PDF
Specs.pdf PDF

Notice history

Notice Type Posted
This notice Latest solicitation Solicitation
Maintenance Dredging of the Scarborough River Federal Navigation Project, Scarborough, ME Pre-Solicitation
Maintenance Dredging of the Scarborough River Federal Navigation Project, Scarborough, ME Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine NAICS 237990 ENDIST New England Total Small Business
Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM26011) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Mississippi River Southwest Pass and Calcasieu River Bar Channel Hopper Dredge Contract (OM25011) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside
Annual Maintenance Dredging of Morehead City Inner Harbor Morehead City, North Carolina, United States · NAICS 237990 ENDIST Wilmington No set-aside
Mississippi River, Baton Rouge to Gulf, Southwest Pass Hopper Dredge Contract No. 8-2026 (OM26008) Plaquemine, Louisiana, United States · NAICS 237990 ENDIST New Orleans No set-aside

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors