Scarborough River Maintenance Dredging
Closed Solicitation Posted
- Solicitation number
- W912WJ23B0004
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
Notice details come from SAM.gov. Updated .
About this opportunity
The U.S. Army Corps of Engineers, Engineering District New England seeks to award a firm fixed-price contract to hydraulically dredge approximately 111,000 cubic yards of sandy material from channels and an anchorage in the Scarborough River, Maine and pump it approximately 6,000 feet to a beach for disposal. Dredging and disposal operations must occur between November 1, 2023 and March 1, 2024 to comply with environmental restrictions. Bids were due by July 6, 2023 and will be evaluated for price and technical acceptability.
There is no set-aside designation. The work involves hydraulic dredging services under NAICS code 237990 and PSC code D301. Bids were received from Michels Construction, Inc. at $4,515,757.42, H&L Contracting, LLC at $3,844,100.00, and The Dutra Group at $5,998,000 with an government estimate of $2,759,700.00. Approximately 111,000 cubic yards will be dredged from the Scarborough River and pumped approximately 6,000 feet to Western Beach for disposal between November 2023 and March 2024 in Scarborough, Maine.
Notice text
3 versions
Update #3 · Latest ·
The proposed work consists of hydraulically dredging approximately 111,000 cubic yards (cy) of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage (below Mean Lower Low Water) and placing the material on Western Beach. Sandy shoal material dredged from the project will be pumped approximately 6,000 ft to Western Beach which is just north of the 8-foot entrance channel in Scarborough, ME. Of the 111,000 cy project total approximately 76,000 cy is required dredging with the remaining 35,000 cy considered 1-foot of allowable overdepth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Scarborough River sees tide ranges as high as 10+ feet during normal tide cycles. Dredging and disposal operations will be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year (TOY) restrictions.
Update #2 ·
The proposed work consists of hydraulically dredging approximately 111,000 cubic yards (cy) of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage (below Mean Lower Low Water) and placing the material on Western Beach. Sandy shoal material dredged from the project will be pumped approximately 6,000 ft to Western Beach which is just north of the 8-foot entrance channel in Scarborough, ME. Of the 111,000 cy project total approximately 76,000 cy is required dredging with the remaining 35,000 cy considered 1-foot of allowable overdepth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Scarborough River sees tide ranges as high as 10+ feet during normal tide cycles. Dredging and disposal operations will be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year (TOY) restrictions.
Update #1 ·
The proposed work consists of hydraulically dredging approximately 111,000 cubic yards (cy) of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage (below Mean Lower Low Water) and placing the material on Western Beach. Sandy shoal material dredged from the project will be pumped approximately 6,000 ft to Western Beach which is just north of the 8-foot entrance channel in Scarborough, ME. Of the 111,000 cy project total approximately 76,000 cy is required dredging with the remaining 35,000 cy considered 1-foot of allowable overdepth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Scarborough River sees tide ranges as high as 10+ feet during normal tide cycles. Dredging and disposal operations will be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year (TOY) restrictions.
Please see full solicitation at https://piee.eb.mil/sol/xhtml/unauth/search/oppMgmtLink.xhtml?solNo=W912WJ23B0004.
Files
| File | Type | Posted |
|---|---|---|
| Bid Abstract.pdf | ||
| Amendment 0002.pdf | ||
| Amendment 0001.pdf | ||
| Plans.pdf | ||
| W912WJ23B0004.pdf | ||
| Specs.pdf |
Notice history
| Notice | Type | Posted |
|---|---|---|
| This notice | Solicitation | |
| Maintenance Dredging of the Scarborough River Federal Navigation Project, Scarborough, ME | Pre-Solicitation | |
| Maintenance Dredging of the Scarborough River Federal Navigation Project, Scarborough, ME | Pre-Solicitation |
Similar open opportunities
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity