Maintenance Dredging of the Scarborough River Federal Navigation Project, Scarborough, ME
Closed Pre-Solicitation Posted
Not the latest version. See the latest solicitation from .
- Solicitation number
- W912WJ23B0004
- Agency
-
ENDIST New England
US Army Corps of Engineers, Department of Defense
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237990 Other Heavy and Civil Engineering Construction
- Place of performance
- Scarborough, Maine, United States
Notice details come from SAM.gov. Updated .
About this opportunity
This pre-solicitation notice is for maintenance dredging of the Scarborough River Federal Navigation Project in Scarborough, Maine. The U.S. Army Corps of Engineers, New England District will issue an unrestricted invitation for bids to hydraulically dredge approximately 111,000 cubic yards of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage and place it on Western Beach. Dredging and disposal operations must be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year restrictions. The contractor must meet a production rate of 30,000 cubic yards per 30 calendar days to complete dredging within the specified window. The solicitation and contract documents will be available on or about late May 2022, with questions due by May 18, 2022.
There is no set-aside designation. The NAICS code is 237990 for dredging with a size standard of $37 million. The estimated construction cost is between $1,000,000 and $5,000,000. Approximately 76,000 cubic yards will be dredged with an additional 35,000 cubic yards considered overdepth. Coordination will be required around the Scarborough River's tide ranges that can exceed 10 feet.
Notice text
2 versions
Update #2 · Latest ·
The U.S. Army Corps of Engineers, New England District will be issuing an Unrestricted Invitation for Bids (IFB) procurement for maintenance dredging of the Scarborough River Federal Navigation Project (FNP) located in Scarborough, ME. The NAICS code for the work is 237990 (size standard of $37M). Construction is expected to take approximately 3 to 4 months to complete. The estimated construction cost is between $1,000,000.00 and $5,000,000.00. Any responsible source meeting this standard may submit a bid to be considered by the New England District.
The proposed work consists of hydraulically dredging approximately 111,000 cubic yards (cy) of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage (below Mean Lower Low Water) and placing the material on Western Beach. Sandy shoal material dredged from the project will be pumped approximately 6,000 ft to Western Beach which is just north of the 8-foot entrance channel in Scarborough, ME. Of the 111,000 cy project total approximately 76,000 cy is required dredging with the remaining 35,000 cy considered 1-foot of allowable overdepth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Scarborough River sees tide ranges as high as 10+ feet during normal tide cycles. Dredging and disposal operations will be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year (TOY) restrictions.
In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 30,000 CY per 30 calendar days. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District.
This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about late-May 2023. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the System of Award Management website (https://sam.gov/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at Tyler.S.Maryak@usace.army.mil.
Update #1 ·
The U.S. Army Corps of Engineers, New England District will be issuing an Unrestricted Invitation for Bids (IFB) procurement for maintenance dredging of the Scarborough River Federal Navigation Project (FNP) located in Scarborough, ME. The NAICS code for the work is 237990 (size standard of $37M). Construction is expected to take approximately 3 to 4 months to complete. The estimated construction cost is between $1,000,000.00 and $5,000,000.00. Any responsible source meeting this standard may submit a bid to be considered by the New England District.
The proposed work consists of hydraulically dredging approximately 111,000 cubic yards (cy) of sandy material from the 8-foot entrance channel, 6-foot inner channel, and 6-foot anchorage (below Mean Lower Low Water) and placing the material on Western Beach. Sandy shoal material dredged from the project will be pumped approximately 6,000 ft to Western Beach which is just north of the 8-foot entrance channel in Scarborough, ME. Of the 111,000 cy project total approximately 76,000 cy is required dredging with the remaining 35,000 cy considered 1-foot of allowable overdepth to bring the project back to its authorized dimensions. The work in this area will require significant coordination around the tide as the Scarborough River sees tide ranges as high as 10+ feet during normal tide cycles. Dredging and disposal operations will be performed between November 1, 2023 and March 1, 2024 to meet environmental time of year (TOY) restrictions.
In order to accomplish all dredging requirements within the specified dredging window it is expected that the Contractor will need to meet a production rate of 30,000 CY per 30 calendar days. Environmental coordination and permitting has been completed by the U.S. Army of Engineers, New England District.
This is not an invitation for bids at this time. The solicitation requirements and contract documents to include instructions for submission and the response date will be available on or about late-May 2022. Neither telephonic, mailed nor faxed requests for hard copies of this solicitation will be accepted. The solicitation will only be available online. In order to download the solicitation, offerors must access the System of Award Management website (https://sam.gov/). All responsible sources may submit a bid which shall be considered by the New England District. Additional questions may be emailed to the Contract Specialist at Tyler.S.Maryak@usace.army.mil.
Notice history
| Notice | Type | Posted |
|---|---|---|
| Scarborough River Maintenance Dredging | Solicitation | |
| This notice | Pre-Solicitation | |
| Maintenance Dredging of the Scarborough River Federal Navigation Project, Scarborough, ME | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| Maintenance Dredging of the Isle au Haut Thoroughfare near Isle au Haut, Maine | ENDIST New England | Total Small Business | |
| Annual Maintenance Dredging of Morehead City Inner Harbor | ENDIST Wilmington | No set-aside | |
| FY26 Willapa Harbor Maintenance Dredging | ENDIST Seattle | No set-aside | |
| Pensacola Harbor Navigation Channel Maintenance Dredging | ENDIST Mobile | No set-aside | |
| Sources Sought for FY26 Atlantic Intracoastal Waterway Maintenance Dredging ��������� Select Sites | ENDIST Savannah | No set-aside |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity