This notice seeks a firm fixed-price construction contract to replace water distribution lines in phases 7 and 8 at Rocky Mountain National Park headquarters in Colorado. The National Park Service Intermountain Region will award the contract to replace 4-inch and 6-inch waterlines with 6-inch, 4-inch and 2-inch high-density polyethylene lines. Additional work includes installing hydrants, valves, service lines, drainage, and repairing disturbed pavement. Responses are due by December 31, 2021 and award will be made on April 18, 2022 to a responsible small business using a best value tradeoff evaluation.

The contract is set aside for total small businesses only, with a NAICS code of 237110 for water and sewer line construction and a size standard of $39.5 million. The estimated value is between $1 million and $5 million to be completed within 270 days from the notice to proceed on April 18, 2022 through February 4, 2023. The location of contract performance will be at Rocky Mountain National Park headquarters approximately 3 miles southwest of Estes Park, Colorado.

Notice text

EO14042 ROMO HQE WATERLINE REHAB PHASE 7 & 8
(1) Date: November 24, 2021

(2) Product or Service Code: Z2NE

(3) Contracting Office Address:
National Park Service Regional Office Serving Interior Regions 6, 7 & 8
Lakewood Major Acquisition Buying Office
12795 West Alameda Parkway
PO Box 25287
Denver, CO 80225-0287

(4) Subject:
REHAB WATER DISTRIBUTION SYSTEM
HEADQUARTERS EAST
PHASE 7 & 8
TORTILLA FLATS & SUNDANCE CIRCLE
PMIS NO. 240839 & 306571

(5) Proposed Solicitation Number: 140P1221R0014

(6) Closing Response Date: December 31, 2021

(7) Contact Point or Contracting Officer: Marcia Fox

(8) Description
PROJECT DESCRIPTION / SUMMARY:
The Work consists of the following:

Base Contract: The Work includes replace existing 4-inch and 6-inch waterline with 6-inch, 4-
inch and 2-inch high density polyethylene (HDPE) by open trench methods. Work includes
furnishing and installation of fire hydrants, valves, and appurtenances, extending new service lines into
existing buildings, installation of air release / vacuum valve vaults, placement of perforated
drainage pipe in the same trench as waterlines, and pavement patching areas disturbed by
waterline installation. Work also includes abandonment or removal of existing waterlines,
fire hydrants, valves, valve vaults and appurtenances.

Option A: The work includes the replacement of three (3) Air Release Vales along the supply line between Bear Lake Road and the Lead Tanks. This work includes the demolition, removal, and

Option B: The Work includes parking area and site accessibility improvements at RV Site P along Sundance Circle. This work includes the grading, placement of concrete pavement, and crusher fines at RV Site P. The work also includes the relocation of RV utility hook ups at the site.

(9) Period of Performance: Estimated Period of performance is 04/18/2022 ¿ 02/04/2023.
Construction is estimated to take 270 days.

(12)
A description of the procedures to be used in awarding the contract:
a. Estimated date of Request for Proposal release: 01/11/2022
b. The anticipated award date: 04/18/2022

(13) The Request for Proposal will be posted on www.SAM.gov
Questions can be emailed to marcia_fox@nps.gov.

(14) Place of Contract Performance:
Project Location: This project is in Rocky Mountain National Park, Estes Park, Colorado.
The project area near the Headquarters Area on the east side of the park, is approximately 3 miles southwest of Estes Park, CO.

All work in this project is within the boundaries of the Utility Area Historic District, which is a culturally significant area.

(15) Set-aside Status:
Total Small Business Set-Aside.
NAICS 237110 Water and Sewer Line and Related Structures Construction
Size Standard $39.5 million

(16) Estimated Construction Magnitude: Between $1,000,000 and $5,000,000.

(17) Award shall be made in accordance with FAR Part 15 best value tradeoff source selection process to a responsible small business (see Subpart 9.1)

(18) The Government anticipates awarding a single award Firm Fixed Price Contract

Files

File Type Posted
B01_0040548566_Synopsis_2.pdf PDF

Notice history

Notice Type Posted
Romo HQE waterline rehab phase 7 & 8 Award Award Notice
Romo HQE waterline rehab phase 7 & 8 Latest solicitation Solicitation
This notice Pre-Solicitation
Romo HQE waterline rehab phase 7 & 8 Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod NAICS 237110 — No set-aside
HAVO 326181 Rehabilitate Rainshed&Water Treatment NAICS 237110 National Office No set-aside
GRCA 318719 North Rim & Roaring Springs Rehabilitation Program NAICS 237110 — No set-aside
White Horse Hill National Game Preserve Water Main Extension NAICS 237110 — Total Small Business
Ross Springs Waterline Replacement Utah 84078, United States · NAICS 237110 Forest Service Total Small Business

On GovTribe

Work this opportunity

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity

GovTribe for Federal Contractors