Romo HQ E water line rehab phase 4, 5 &6

Closed Pre-Solicitation Posted

This opportunity was awarded. See the award notice from , or the latest solicitation from .

Solicitation number
140P1220R0012
Agency
Responses due
Set-aside
Woman-Owned Small Business

Opportunity facts

More information

Notice details come from SAM.gov. Updated .

About this opportunity

This pre-solicitation notice seeks proposals for the rehabilitation of water distribution systems in phases 4, 5 and 6 at Rocky Mountain National Park headquarters east in Estes Park, Colorado. The National Park Service Intermountain Region will replace existing waterlines, fire hydrants, valves and appurtenances with HDPE piping via open trench methods. An option to improve parking areas and sidewalks is also included. Proposals are due by July 29, 2020 and will be evaluated for technical acceptability and price. Anticipated award date is September 14, 2020.

The acquisition is set aside for woman-owned small businesses as defined by NAICS 237110 with a size standard of $39.5 million. The construction value is estimated between $1 million and $5 million. Work will be performed at the project location within Rocky Mountain National Park headquarters utility area historic district and must be completed within 90-120 days starting no earlier than May 3, 2021. A single firm fixed price contract is anticipated to be awarded to the responsible small business offering the lowest priced technically acceptable proposal.

Notice text

2 versions

Update #2 · Latest ·

REHAB WATER DISTRIBUTION SYSTEM - HEADQUARTERS EAST - PHASE 4, 5 & 6

PMIS NO. 211492, 239512 & 239513

The purpose of this amendment to the pre-solicitation is to respond to a question received.

Q. Can static pipe bursting be used?

A. A majority of the waterline is in a new alignment or will require excavation for the placement of an underdrain so pipe bursting will not be a viable option in these areas. There is a portion of the work that pipe bursting could be used but a change in the acceptable depth of the pipeline would have to be accepted by the park. The new pipeline is designed to be deeper than the existing system.

Update #1 ·

SYNOPSIS

REHAB WATER DISTRIBUTION SYSTEM - HEADQUARTERS EAST - PHASE 4, 5 & 6

PMIS NO. 211492, 239512 & 239513

(1) Date: April 28, 2020

(2) Product or Service Code: Z2NE

(3) Contracting Office Address:

National Park Service Regional Office Serving Interior Regions 6, 7 & 8

Lakewood Major Acquisition Buying Office

12795 West Alameda Parkway

PO Box 25287

Denver, CO 80225-0287

(4) Subject:

REHAB WATER DISTRIBUTION SYSTEM - HEADQUARTERS EAST - PHASE 4, 5 & 6

(5) Proposed Solicitation Number: 140P1220R0012

(6) Closing Response Date: May 13, 2020

(7) Contact Point or Contracting Officer: Marcia Fox

(8) Description

PROJECT DESCRIPTION / SUMMARY:

The Work consists of the following:

Base Contract: The Work includes replace existing 4-inch and 6-inch waterline with 6-inch, 4- inch and 2-inch high density polyethylene (HDPE) by open trench methods. Work includes replacing fire hydrants, valves, and appurtenances, extending new service lines into existing buildings, installation of air release/vacuum valve vaults, placement of perforated drainage pipe in the same trench as waterlines, and pavement patching areas disturbed by waterline installation. Work also includes abandonment or removal of existing waterlines, fire hydrants, valves, valve vaults and appurtenances.

Option A: The Work includes parking area and sidewalk improvements to the north of building 1198. This work includes the grading and placement of the asphalt parking area along with the placement of a concrete sidewalk, curb and gutter to the north of 1198. The work also include the demolition of the existing asphalt pavement

(9) Period of Performance: Estimated Period of performance is 09/14/2020 ¿ 9/28/2021.

The work on site may not begin until May 3, 2021. Construction is estimated to take 90 -120 days.

(12)

A description of the procedures to be used in awarding the contract:

a. Estimated date of Request for Proposal release: 6/8/2020

b. The anticipated award date: 09/14/2020

(13) The Request for Proposal will be posted on www.beta.SAM.gov and www.fedconnect.net

Questions can be emailed to marcia_fox@nps.gov. Questions will not be accepted if submitted on FedConnect.

(14) Place of Contract Performance:

Project Location: This project is in Rocky Mountain National Park, Estes Park, Colorado.

The project area near the Headquarters Area on the east side of the park, is approximately 3 miles southwest of Estes Park, CO.

All work in this project is within the boundaries of the Utility Area Historic District, which is a culturally significant area.

(15) Set-aside Status:

Women Owned Small Business Set-Aside.

NAICS 237110 Water and Sewer Line and Related Structures Construction

Size Standard $39.5 million

(16) Estimated Construction Magnitude:

Between $1,000,000 and $5,000,000.

(17) Award shall be made in accordance with FAR Part 15 to the lowest priced technically acceptable proposal with submittals that meet the specifications herein received from a responsible small business (see Subpart 9.1)

(18) The Government anticipates awarding a single award Firm Fixed Price Contract

Notice history

Notice Type Posted
Romo HQ E water line rehab phase 4, 5 &6 Award Award Notice
Romo HQ E water line rehab phase 4, 5 &6 Latest solicitation Solicitation
This notice Original Pre-Solicitation

Similar open opportunities

Opportunity Agency Set-aside Responses due
YOSE 22866 Rehabilitate Hodgdon Meadows Water System and YOSE 196755 Extend Hod NAICS 237110 — No set-aside
HAVO 326181 Rehabilitate Rainshed&Water Treatment NAICS 237110 National Office No set-aside
GRCA 318719 North Rim & Roaring Springs Rehabilitation Program NAICS 237110 — No set-aside
4 GAOA Flaming Gorge Water System Buckboard in Ashley NF, Wyoming Mc Kinnon, Wyoming 82935, United States · NAICS 237110 Forest Service Total Small Business
White Horse Hill National Game Preserve Water Main Extension NAICS 237110 — Total Small Business