Rifle Bunkhouse Siding Installation

Closed Solicitation Posted

This opportunity was awarded. See the award notice from .

Solicitation number
1282B124Q0088
Agency
Forest Service Department of Agriculture
Responses due
Set-aside
Total Small Business

Opportunity facts

NAICS code
238170 Siding Contractors
PSC
Z2FZ Repair Or Alteration Of Other Residential Buildings
Place of performance
Rifle, Colorado 81650, United States
Points of contact

Notice details come from SAM.gov. Updated .

About this opportunity

The Department of Agriculture Forest Service is seeking bids for the Rifle Bunkhouse Siding Installation project on the White River National Forest. The work involves removing the current weathered wood and stucco siding, replacing any damaged plywood sheathing, installing weather-resistant house wrap, and installing new cement fiber siding, trim, and vinyl windows to match the adjacent Rifle District office building. A pre-bid site visit is scheduled for August 15, 2024, and all questions are due by August 22, 2024. The contract will be awarded on a Lowest Price Technically Acceptable basis, evaluating the offeror's technical approach and price.

This is a Total Small Business set-aside with a NAICS code of 238170 - Siding Contractors. The estimated contract value is between $25,000 and $100,000. The performance period is from the date of award through May 30, 2025. The work must be completed within 60 days of contract award or started and completed next spring. The project is located in Rifle, Colorado.

Notice text

2 versions

Update #2 · Latest ·

***See Amendment 0001 for Questions and Answers and List of Attendees. See Attachments 002- Statement of Work Version 2 and Attachment 005- Measurements and Photographs.***  

The Rifle Bunkhouse is a temporary housing accommodation for seasonal and permanent new-hire employees working in the Rifle Ranger District (RRD) of the White River National Forest (WRNF). The bunkhouse siding is composed of wood panels approximately 4’x10’ in size that have been cut to fit. The material has been weathered due to the sun and dry conditions with little shade providing protection. The lower portion of the bunkhouse siding below the sill plates consists of stucco/foam-type material. Some birds have created holes in the wooden siding and made nests in the wood framed wall cavities. The windows are also heavily weathered, with failing seals and need replacement.

The work for this project consists of removing the current siding and related window trim from the bunkhouse, along with any damaged plywood sheathing underneath. The damaged plywood will be replaced, and a weather resistant house wrap will be installed around the building. Non-fixed windows will be replaced with vinyl windows and properly sealed/flashed from water intrusion. Cement fiber siding, trim, and a drip edge will be installed above trim, windows, and siding transitions as appropriate. Old unnecessary trim features around windows and building walls shall be removed and new trim and siding will be installed in a clean and simple fashion that matches the aesthetic of the adjacent Rifle District office building. The new siding will be painted with a color matching the Rifle District office building.

Pre-bid Site Visit will be held on August 15, 2024 at 9:30AM (Mountain Time). Enter through the gate, just past the Rifle Ranger Station. Meet in the parking lot on the right; in front of the bunkhouse. See Attachment 003- Map and Directions. 

All questions regarding the Solicitation are due via email to heather.cole@usda.gov by 5:00PM Mountain Time on August 22, 2024. 

Update #1 ·

The Rifle Bunkhouse is a temporary housing accommodation for seasonal and permanent new-hire employees working in the Rifle Ranger District (RRD) of the White River National Forest (WRNF). The bunkhouse siding is composed of wood panels approximately 4’x10’ in size that have been cut to fit. The material has been weathered due to the sun and dry conditions with little shade providing protection. The lower portion of the bunkhouse siding below the sill plates consists of stucco/foam-type material. Some birds have created holes in the wooden siding and made nests in the wood framed wall cavities. The windows are also heavily weathered, with failing seals and need replacement.

The work for this project consists of removing the current siding and related window trim from the bunkhouse, along with any damaged plywood sheathing underneath. The damaged plywood will be replaced, and a weather resistant house wrap will be installed around the building. Non-fixed windows will be replaced with vinyl windows and properly sealed/flashed from water intrusion. Cement fiber siding, trim, and a drip edge will be installed above trim, windows, and siding transitions as appropriate. Old unnecessary trim features around windows and building walls shall be removed and new trim and siding will be installed in a clean and simple fashion that matches the aesthetic of the adjacent Rifle District office building. The new siding will be painted with a color matching the Rifle District office building.

Pre-bid Site Visit will be held on August 15, 2024 at 9:30AM (Mountain Time). Enter through the gate, just past the Rifle Ranger Station. Meet in the parking lot on the right; in front of the bunkhouse. See Attachment 003- Map and Directions. 

All questions regarding the Solicitation are due via email to heather.cole@usda.gov by 5:00PM Mountain Time on August 22, 2024. 

Attachments

Notice history

Notices posted for this opportunity, newest first
Notice Type Posted
Rifle Bunkhouse Siding Installation Award Award Notice
Rifle Bunkhouse Siding Installation This notice · Latest solicitation Solicitation
Rifle Bunkhouse Siding Installation Original Pre-Solicitation

On GovTribe

Work this opportunity on GovTribe

  • Track it in your pipeline
  • Find teaming partners
  • Similar opportunities
  • Ask GovTribe AI about this opportunity