This document is a Statement of Work (SOW) for the Rifle Bunkhouse Siding Installation project for the White River National Forest. The project involves removing the existing siding and windows, replacing damaged plywood, installing weather-resistant house wrap, and installing new cement fiber siding, trim, and vinyl windows on the Rifle Bunkhouse, a temporary housing facility for seasonal and new-hire employees. The work must be completed within 60 days of the contract award date or started and completed next spring. No permits are required. The SOW includes a base bid with items for mobilization, siding removal, plywood replacement, house wrap installation, painting, and siding installation, as well as an optional bid item for window replacement. Materials must be approved by the Contracting Officer (CO) or Contracting Officer's Representative (COR) prior to installation. The contractor is responsible for all labor, materials, equipment, and debris removal. Payment will be made as lump sum quantities for each completed item. A pre-bid site visit is scheduled for August 15, 2024, and questions are due by August 22, 2024.

View the file

Other files for this federal contract opportunity

Other files attached to Rifle Bunkhouse Siding Installation, newest first.
File Type Posted
Amendment 0001 1282B124Q0088 1121785.pdf PDF
Attachment 005- Measurements and Photographs.pdf PDF
Attachment 002- Statement of Work Version 2.pdf PDF
Attachment 001- Schedule of Items.pdf PDF
Attachment 003- Map and Directions.pdf PDF
Attachment 004- WD CO20240001.pdf PDF
Solicitation 1282B124Q0088 1121785.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WHITE RIVER NATIONAL FOREST

RIFLE BUNKHOUSE SIDING INSTALLATION

STATEMENT OF WORK/DESCRIPTION/SPECIFICATIONS

C-1. Description of Work

The Rifle Bunkhouse is a temporary housing accommodation for seasonal and permanent new-hire employees working in the Rifle Ranger District (RRD) of the White River National Forest (WRNF). The bunkhouse siding is composed of wood panels approximately 4’x10’ in size that have been cut to fit. The material has been weathered due to the sun and dry conditions with little shade providing protection. The lower portion of the bunkhouse siding below the sill plates consists of stucco/foam-type material. Some birds have created holes in the wooden siding and made nests in the wood framed wall cavities. The windows are also heavily weathered, with failing seals and need replacement.

The work for this project consists of removing the current siding and related window trim from the bunkhouse, along with any damaged plywood sheathing underneath. The damaged plywood will be replaced, and a weather resistant house wrap will be installed around the building. Non-fixed windows will be replaced with vinyl windows and properly sealed/flashed from water intrusion. Cement fiber siding, trim, and a drip edge will be installed above trim, windows, and siding transitions as appropriate. Old unnecessary trim features around windows and building walls shall be removed and new trim and siding will be installed in a clean and simple fashion that matches the aesthetic of the adjacent Rifle District office building. The new siding will be painted with a color matching the Rifle District office building.

C- 2 Project Location

The Rifle Bunkhouse is located on the RRD compound, north of the District Office in Rifle, Colorado. The compound is approximately three miles north of exit 90 on I-70.

C-3. General Specifications

Use of Premises: Contractor shall have full access to the exterior of the premises for construction operations during construction period, with interior access available by advance written approval by the Contract Officer (CO) due to building occupancy. Contractor's use of the premises is limited only by the Government's right to perform the work or to retain other contractors on portions of the project. The contractor is responsible for repairing any damage resulting from the contractor’s negligence during the term of this contract

Camping: There is potential opportunity for trailer/camper/Recreation Vehicle accommodations on site. Coordinate with Designated Contract Officer’s Representative (COR) for site availability.

Preservation of Natural Features:

1. Confines all operations to the work limits of the project. Prevent damage to natural surroundings. Restore damaged areas, repairing or replacing damaged trees and plants, at no additional expense to the Government.

Attachment 002- Statement of Work

2. Provide temporary barriers to protect existing trees and plants and root zones.

3. Do not remove, injure, or destroy trees or other plants without prior approval.

Consult with CO and remove agreed-on branches that interfere with construction.

4. Do not fasten ropes, cables, or guys to existing trees.

5. Do not damage remaining exterior or interior features, including logs.

6. Driving heavy vehicles on non-compacted ground may damage underground utilities and water systems. Vehicle access beyond driveways and parking areas should be coordinated with the COR.

7. All waste should be stored and disposed of in a manner that does not litter the site due to high winds/adverse weather.

Work Restrictions: The contractor shall, at all times, conduct operations to ensure the least inconvenience to the public, employees and building residents. The contractor shall confine storage the of materials to areas approved by the CO. Bunkhouse residents will be going in and out of the barracks as safety allows. The contractor will be required to provide safety through the use of safety items such as signage, barricades, and safety flagging. The contractor will coordinate any necessary times where residents will not have access to the building with the COR at least 5 business days prior to restricting access to the bunkhouse.

Schedule: Work shall not be conducted outside the hours of 8:00 am and 5:00 pm Monday through Friday or during federal holidays without prior written approval from the CO.

Period of Performance: Date of Award to May 30, 2025. Work must be completed within 60 days of date of award or work must be started and completed next Spring. Include your timeline for work in full work schedule.

Permits: No permits are required.

C-4. Technical Specifications

Work: The contractor is responsible for furnishing all labor, materials, equipment, and other incidentals necessary to successfully complete the project, or any portion of it, by carrying out all duties and obligations imposed by the contract.

Base Bid: Items in this section will be considered part of the base bid in this contract.

Item 1: Mobilization/Demobilization/General Conditions – This includes all materials, equipment, labor, and incidentals required to perform all operations necessary for the movement of personnel, equipment, supplies, and incidentals to the project site and other work that must be performed or that cause costs to be incurred prior to beginning work on the project site. This item includes supplies (necessary materials), project management, incidentals, overhead and profit, bond, and insurance.

Item 2: Existing Siding Removal – This includes all siding currently existing on the Bunkhouse, existing trim around windows and around existing siding, any damaged plywood and weather resistant house wrap identified once siding is removed, and any other items that are necessary to properly prepare the building for new siding installation.

Item 3: Replacement of Damaged Plywood – Install plywood to building in areas where damaged plywood was removed.

Item 4: Weather Resistant House Wrap – Place weather resistant house wrap (ex. Tyvex) across all surfaces siding will be hung on the building.

Item 5: Siding and Window Painting – Siding and window trim shall be painted to match the color of the Rifle District Office provided by the COR. All painted areas will have a minimum of two (2) coats of paint. Touch up painted areas after installation as needed.

Item 6: Siding Installation – Install siding in accordance with proper installation procedures.

Option Bid: Items in this section will be considered optional items the contractor can bid in this contract and in Section B under Schedule of Items.

Item 1: Window Replacement. Remove existing windows and replace with vinyl windows of same size and with proper flashing to house siding.

Material Approval: Materials considered for the work shall be approved by the CO or the COR prior to installation.

Debris: The contractor shall remove all existing debris that is on-site as required to complete the work. All debris resulting from the work shall become the contractor’s property and must be properly disposed of off Forest Service land. The contractor shall take all steps necessary to prevent spillage when transporting waste materials to an authorized disposal site. The contractor has the sole responsibility for any costs required for cleanup and damage resulting from the contractor’s haul spillage.

Measurement and Payment: For each individual item listed here and in the Schedule of Items, payment will be full compensation for all work related to the particular item in accordance with the Specifications. In addition to the removal of old siding and installation of new siding, optional items are included as separate items to address individual window purchase and installation. The method of measurement for Payment will be Lump Sum Quantities (L.S.Q) which denote one complete unit of work as described in the contract including necessary materials, equipment, and labor to complete the job. They will be measured complete and in-place.

C-5. AGAR 452.211-72 Statement of Work/Specifications (FEB 1988)

The Contractor shall furnish the necessary personnel, material, equipment, services, and facilities (except as otherwise specified), to perform the Statement of Work/Drawings/FFE/Product Specifications referenced in Section J.

C-6. AGAR 452.211-73 Attachments to Statement of Work/Specifications (FEB 1988)

The attachments to the Statement of Work/Specifications listed in Section J are hereby made part of this solicitation and any resultant contract.

SECTION C - STATEMENT OF WORK/DESCRIPTION/SPECIFICATIONS
C- 2 Project Location